Updated November 2026 · By Jesse McGreevy and Marc Comisar, McGreevy and Comisar, Domain Realty
Buying in Grove City in 2026 means choosing one of four purchases in unincorporated Charlotte County: an inland block home from the 1950s to 1970s, a canal home, a mobile home on an owned lot, or a lot to rebuild. Over the 12 months to September 9, 2026, 33 single-family sales closed at a $300,000 median.
This page covers Grove City, Florida, the old Lemon Bay community and Census Designated Place along Placida Road (County Road 775) in western Charlotte County, with Englewood 34224 mailing addresses. It is not Grove City, Ohio, or Grove City, Pennsylvania, and it is not a city: no town hall issues permits here, and Charlotte County does. Our Grove City neighborhood guide covers the setting, parks and history. This page is the buying manual, written by the #1 Team in Southwest Florida since 2012. To plan your search, Call Marc at (239) 287-5873, or start from our Grove City buyer consultation form.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales through September 9, 2026; 12 months September 10, 2025 to September 9, 2026; 36 months September 10, 2023 to September 9, 2026; improved sales above $50,000, vacant lot sales above $1,000.)
The county roll is the backbone of this page. On the Charlotte County Property Appraiser roll dated November 5, 2026, the four recorded plats, Grove City (the original 1886 town plat), Grove City Terrace, Grove City Shores and Grove City Cove, hold 955 parcels: 591 single-family homes, 136 mobile homes and 136 vacant residential lots. We tracked 33 qualified single-family sales in the 12 months from September 10, 2025 to September 9, 2026, at a $300,000 median, $262 per heated square foot and 1,278 heated square feet. Counting every qualified improved sale above $50,000 in the same window, including mobile homes and a few other uses, we tracked 39 sales at a $289,000 median. Over 36 months, we tracked 73 single-family sales at a $305,000 median.
Two counting rules apply everywhere below. First, price per square foot divides the sale price by the county's heated (living) area, which leaves out garages, lanais and screened porches, so never set it beside a listing sheet's figure. Second, a group of fewer than 10 sales is a small group: its count (n) appears beside it, and we draw no percentage conclusion from it (Charlotte County Property Appraiser). Each figure also says which group it covers, because Grove City mixes single-family homes, mobile homes and a few other uses on one roll.
Work with McGreevy and Comisar in Grove City because four plats on one small roll carry different prices, flood zones and rules, and we read those from the county record before you make an offer. We represent you as your buyer's agent, and the partners themselves, Jesse McGreevy and Marc Comisar, handle your purchase.
Here are the credentials behind that work:
Contact us directly:
If you're searching for "the best buyer's agent in Grove City, Florida," McGreevy and Comisar represents homebuyers across Sarasota County and Charlotte County, from Englewood, Venice and North Port to Port Charlotte, Punta Gorda and the Southwest Florida coastal corridor. Whether you're relocating, investing, buying your first Florida home, or upgrading to luxury, including in Grove City, Englewood East, Rotonda West, Gulf Cove and along Lemon Bay, our team provides honest market guidance, pre-MLS access, partner-level negotiation, and a clear plan to help you buy confidently. Comparing agents before you commit? Our guide to choosing among Englewood's top real estate agents sets out the questions worth asking anyone who offers to represent you on a canal, block-home, mobile-home or lot purchase here.
Grove City's four recorded plats sell at very different price levels, so one Grove City median is the wrong number for most homes. Over 36 months, all-improved medians ran from $197,500 on the original plat to $748,500 in Grove City Shores and $970,000 in Grove City Cove (n=4), and the county bills each parcel its own flat charges.
The gap shows in the county file. Over 36 months to September 9, 2026, we tracked 24 qualified improved sales on the original plat at a $197,500 median (n=24), 48 in Grove City Terrace at $287,050 and 16 in Grove City Shores at $748,500; Grove City Cove had 4 (a small group) at $970,000 (Charlotte County Property Appraiser). The original plat is the only one that holds mobile homes, and its 36-month median heated area, 1,008 square feet (n=23), is the smallest of the four, so its price per sale reflects a different kind of purchase.
Then the rules diverge by parcel. Every Grove City parcel pays the county's Grove City Street and Drainage assessment, $220.00 per equivalent residential unit for fiscal 2026 (Charlotte County, Grove City FY2027 Proposed budget). Flood zone does not follow distance from the water: of the 2,322 county address points inside the Grove City CDP, 1,373 (59.1 percent) fall in FEMA Zone AE on the county's flood layer, effective December 15, 2022 (Charlotte County GIS flood zones). So we check the zone, the base flood elevation and the plat for the exact parcel, never for the street.
Before a Grove City offer, we pull qualified county sales from the same plat and home type, then read the parcel's own file: permits, flood zone and elevation, utility status, tax lines and title commitment. A price recommendation comes last, because a 1960s block home and a canal home a few streets away are different purchases.
The order rarely changes. We start with the plat and the type: a single-family comparison set from Grove City Terrace is built on the Terrace 36-month figures (n=48, $287,050 median for all improved uses), not on the Shores figures (Charlotte County Property Appraiser). Then comes the flood file. We look the address up in the FEMA Flood Map Service Center and ask whether an elevation certificate is on file, because FEMA's form records the lowest-floor elevation that insurers use.
Next we read permits and liens through the county's research tools, ask the seller for the flood disclosure Florida requires "at or before the time the sales contract is executed" (s. 689.302, Florida Statutes), and confirm sewer or septic status with Englewood Water District. Last, we work through the bill you will actually pay. The sections of this guide covering inspections, flood and insurance, taxes and closing costs, carry each of those checks in detail.
On a Grove City canal home, we treat the seawall, the dock and the water access as separate items to confirm before the inspection period ends. Florida exempts a canal dock up to 1,000 square feet from a state permit, but the exemption does not tell you whether a given seawall is sound or a dock was ever permitted.
The dredged canals of Grove City Shores and Cove sit outside the Lemon Bay Outstanding Florida Water because artificial waterbodies are excluded (Florida Administrative Code 62-302.700), and state law exempts a dock of up to 1,000 square feet, including lifts and roofs, in a canal of that kind, with a lower 500 square feet where the Outstanding Florida Water rules apply (s. 403.813, Florida Statutes). A seawall restoration within 18 inches waterward is also exempt under the same statute. We ask for the seawall's age, any repair history and the dock's permit record, and we bring in a marine contractor. Part 2 of this guide covers canals in full.
Your Grove City purchase is handled by the partners themselves, Jesse McGreevy and Marc Comisar of Domain Realty, not passed to a junior agent. Marc takes buyer calls: Call Marc at (239) 287-5873. Jesse's line is (239) 898-6072, and he handles the sale of the home you own now.
Read how each partner works on Jesse McGreevy's agent page and Marc Comisar's agent page, and how the team began on our story page. To send a question in writing, use our contact form or the Grove City consultation form near the end of this guide. Moving within the area, say from an inland block home to a canal home? We can run the sale and the purchase together. The Grove City seller guide covers listing your current home, and what your Grove City home is worth starts with a valuation built on the same parcel data. Need to sell your current home before you buy? Call Jesse direct at (239) 898-6072.
You choose among the four Grove City purchases by starting with the constraint you cannot change, usually budget, water access or timeline, and then testing it against the plat. A $300,000 budget points inland, a boat points to the canal plats, and a tight loan timeline argues against a mobile home or lot.
Here is the order we use. First, fix the budget band using the budget tables in the next section and the plat table above, so you know whether you are looking in the Terrace, the original plat or the canals. Second, decide how much age you will accept: a home built before 1980 is the norm in Grove City, and a newer home is rare. Third, price the carrying costs that differ by type, because flood zone, the seawall and dock, the mobile home's classification or the lot's utility charges can outweigh a lower price. Fourth, line up the financing path before you tour, since a mobile home on a state title and a canal home above the $832,750 conforming limit both need a lender who has done the type. If you are unsure which of the four fits, Call Marc at (239) 287-5873 and we will run the plat comparison for your budget.
Choose an inland block home for the lowest single-family entry price, a $282,500 36-month median; a canal home in Grove City Shores or Cove for water access at $792,000; a mobile home on an owned original-plat lot at about $150,000 (n=9); or a lot at a $47,500 median (n=8). Each uses its own inspections, loan and insurance.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales to September 9, 2026; 36 months September 10, 2023 to September 9, 2026; single-family homes, mobile homes and vacant lots above $1,000; contract defaults from the Florida Realtors and Florida Bar AS IS form, Rev. 12/24 26; Citizens Property Insurance 2026 approved rates by county.)
The county record separates the four purchases cleanly, and a decision table is the fastest way to see how they differ. A canal plat here means Grove City Shores plus Grove City Cove, and an inland plat means Grove City Terrace plus the original Grove City plat. The price rows come from the Charlotte County Property Appraiser, and the other rows link to the statute, form or agency behind them. A few cells say a figure was not cut separately: where the county sample is too thin, we leave the cell plain rather than guess.
| What you are comparing | Inland single-family home | Canal single-family home | Mobile home on an owned lot | Vacant lot or teardown |
|---|---|---|---|---|
| 36-month median and count | $282,500 (n=58) | $792,000 (n=15) | $150,000 (n=9, small group) | $47,500 (n=8, small group) |
| Middle half of prices | $232,250 to $352,500 | $550,000 to $1,300,000 | $115,000 to $182,000 | $45,250 to $61,925 |
| 12-month figure | Single-family, all four plats: $300,000 (n=33) | Not cut separately for 12 months (7 Shores sales, a small group, at $650,000) | $151,000 (n=4, small group) | $65,000 (n=1, one sale) |
| Median heated sq ft and price per sq ft | 1,140 heated sq ft; $250 per sq ft | 1,670 heated sq ft; $486 per sq ft | Not cut separately | Land only; not comparable |
| Typical build era | 451 of the 591 single-family homes on the roll date from the 1950s to 1970s (all four plats) | Shores homes sold over 36 months had a 1,810 heated sq ft median (n=14); build era not cut separately | Three vintages: before June 15, 1976, June 1976 to July 1994, and after July 13, 1994 (Rule 15C-1.0104) | Built to the Florida Building Code in force when you permit |
| Contract and title form | Florida Realtors and Florida Bar AS IS or standard contract; the contract checkbox decides who pays the owner's title policy, and the closing agent confirms | Same contract, plus seawall and dock items you add | Real property by deed and contract once the title is retired (s. 319.261); a home still on a state title is personal property | A lot purchase contract; brokerage disclosures under s. 475.278 apply to vacant lots too |
| Inspection focus | Roof, electrical panel and wiring, plumbing, wood-destroying organisms, sewer or septic status, and the Citizens 4-point on homes over 20 years old (Citizens inspections) | Seawall, dock and lift, elevation certificate, flood openings, and everything on the inland list | HUD label on each section, data plate, tie-downs, foundation and floor condition (Rule 15C-1.0104) | Survey, flood zone and base flood elevation, utility availability, septic setbacks (50 ft for lots platted before 1972) |
| Financing path | Conventional, FHA or VA; USDA eligibility is checked by address, and the three Grove City addresses we tested came back ineligible (USDA eligibility) | Same programs; loans above the $832,750 Charlotte County conforming limit are not conforming loans (FHFA 2026 limits) | FHA Title I, FHA Title II, Fannie Mae, chattel or cash, depending on whether the home is real property (FDIC, FHA Title I guide) | Cash, a lot loan, or a construction-to-permanent loan of up to 12 months per period and 18 months in total on a Fannie Mae single close (Fannie Mae B5-3.1-02) |
| Insurance angle | Citizens Charlotte homeowners average $2,887; flood zone varies block by block | Zone AE with base flood elevations of 8 to 10 feet and Coastal A in Shores; lender flood coverage on a federally backed loan; flood policy needed with Citizens wind coverage | Citizens Charlotte mobile home average $2,810; Citizens mobile home policies exclude flood (Citizens mobile home brochure) | None until a home exists; the new home's floor must meet the base flood elevation plus 1 foot |
| Timeline pressure | 15-day inspection period and 30-day loan approval by default; title commitment 15 days before closing | Add time for the flood quote, elevation certificate and marine inspection | A foundation certification from an engineer can outlast a 15-day inspection period | Permits, utility capacity charges and construction come after closing |
The default days in the contract row come from the current Florida Realtors and Florida Bar AS IS contract: a 3-day initial deposit, a 15-day inspection period in which the buyer may cancel "in Buyer's sole discretion," a 30-day loan approval period and a title commitment 15 days before closing, with each number editable in the blanks. The buying, inspection and insurance sections below walk through each step.
An inland Grove City Terrace or original-plat block home gives you the lowest single-family entry price in Grove City: a $282,500 median over 36 months (n=58), with a middle half of $232,250 to $352,500. The homes are mostly 1950s to 1970s block construction of about 1,140 heated square feet, priced near $250 per heated square foot.
Grove City Terrace is the bulk of that group. Over 36 months, we tracked 48 qualified improved sales in the Terrace at a $287,050 median and 1,152 heated square feet, and over the most recent 12 months, 22 sales at $272,700 (Charlotte County Property Appraiser). Inland does not mean outside the flood zone. Testing all 2,322 county address points in the CDP put 38.3 percent in Zone X, almost all of it the shaded 0.2 percent annual chance coastal zone, and 59.1 percent in Zone AE, so a block home two streets inland can sit in either (Charlotte County GIS flood zones). Age is the other lever. Citizens requires a 4-point inspection on owner, dwelling and mobile home applications for properties more than 20 years old, and a roof certification where the roof covering is a soft roof over 25 years or a hard roof over 50 (Citizens inspections). Most of these homes are well past 20 years, so insurance and inspection work starts on day one.
A canal home in Grove City Shores or Cove gives you water frontage and larger houses at a different price level: a $792,000 median over 36 months on 15 canal-plat single-family sales, with a middle half of $550,000 to $1,300,000, a median 1,670 heated square feet and $486 per heated square foot, nearly double the inland figure.
Grove City Shores carries most of those sales. Over 36 months, we tracked 16 qualified improved sales there at a $748,500 median and 14 with a heated-area figure at a median 1,810 heated square feet; Grove City Cove had 4 sales, a small group, at a $970,000 median (Charlotte County Property Appraiser). Your flood and insurance picture changes with the water. Base flood elevations in the Grove City AE zone run 8 to 10 feet, and 40 Shores parcels fall in the Coastal A Zone, where the county applies V-zone construction standards (Charlotte County, Flood Information; Charlotte County GIS Coastal A Zone layer). Citizens will not insure a home whose dwelling replacement cost is $700,000 or more (s. 627.351, Florida Statutes), and a newly elevated canal house can cross that line even though most of a 1960s canal sale price is land. The seawall and dock add inspection work that no other Grove City purchase has.
A mobile home on the original Grove City plat gives you land plus a home at the lowest price point in the community: a $150,000 median over 36 months (n=9, a small group) and $151,000 over 12 months (n=4). It is not a park purchase. You own the lot, pay no lot rent, and no park approves you.
Florida's Mobile Home Act applies only to a home "placed upon a rented or leased lot in a mobile home park in which 10 or more lots are offered for rent or lease" (s. 723.002, Florida Statutes). The county roll counts 136 mobile homes in Grove City, all on individually platted lots of the original 1886 town plat (Charlotte County Property Appraiser). What matters instead is classification. When the owner also owns the land the home is affixed to and the home carries a current RP decal, the property appraiser assesses it as real property; a home without one is presumed to be personal property (Rule 12D-6.002, Florida Administrative Code). That status drives your loan, your closing paperwork and your taxes, and the step-by-step buying section below covers it. The Census puts mobile homes at 563 of 1,882 housing units (29.9 percent, with a wide margin of error), so this is a real share of the stock (Census ACS 2024 5-year DP04).
A Grove City lot or teardown makes sense when you want to choose the home and can wait for permits: vacant lots sold at a $47,500 median over 36 months (n=8, a small group), but sewer capacity, flood elevation and impact fees come after the land price. The county roll lists 136 vacant residential lots.
Lot sales are thin. Every year from 2019 to 2026 is a small group, from 8 sales in 2021 to 1 sale in 2026, and the 12-month window to September 9, 2026 holds one sale at $65,000 (n=1) (Charlotte County Property Appraiser). That is too few to call a trend. The utility line item is concrete, though: Englewood Water District's rules effective October 1, 2026 set capital capacity charges of $15,865.50 per equivalent residential connection, and require connection within 365 days after written notice that sewer is available (Englewood Water District Customer Rules and Regulations; s. 381.00655, Florida Statutes). Florida also bars an impact fee for a same-use replacement structure (s. 163.31801, Florida Statutes), which changes the math on a teardown. The lot and rebuild section below works through it, and our new construction in Englewood page covers the builder side.
The four plats compare as three different markets: the original plat is the lowest-priced and holds all the mobile homes, Terrace is the middle, and Shores and Cove are the canal plats at about two and a half to three and a half times the Terrace price. The table below shows all-improved medians, with small groups flagged.
Every row counts all qualified improved sales above $50,000, which includes mobile homes on the original plat and a few other uses, from the Charlotte County Property Appraiser. A 12-month column under 10 sales is a small group, and we read nothing into it.
| Plat | 12-month median and n | 36-month median and n | 36-month middle half | 36-month median heated sq ft |
|---|---|---|---|---|
| Grove City (original 1886 plat) | $218,000 (n=8, small group) | $197,500 (n=24) | $150,500 to $275,000 | 1,008 (n=23) |
| Grove City Terrace | $272,700 (n=22) | $287,050 (n=48) | $230,750 to $368,750 | 1,152 (n=48) |
| Grove City Shores | $650,000 (n=7, small group) | $748,500 (n=16) | $591,250 to $1,330,000 | 1,810 (n=14) |
| Grove City Cove | $620,000 (n=2, small group) | $970,000 (n=4, small group) | $460,000 to $1,015,000 | 1,540 (n=4, small group) |
Two cautions apply. The original-plat row mixes mobile homes with site-built houses, so its median is not a house price. And the Cove rows rest on 2 and 4 sales, so use them only as a reminder that Cove sales are rare and large. A plat's median never prices your parcel; the county's own sales for your home type and size do, and we build that comparison before every offer. Our Grove City home valuation page shows the seller's side of the same data.
A budget under $250,000 buys a home of about 960 heated square feet in Grove City, often a mobile home or an original-plat or Terrace block house, while $300,000 to $399,999 buys a median 1,500 heated square feet. We tracked 39 qualified improved sales in 12 months and 92 in 36 months.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026; qualified improved sales above $50,000 of every use, single-family, mobile and a few other uses; 12 months September 10, 2025 to September 9, 2026 and 36 months September 10, 2023 to September 9, 2026; heated area and year built from the 2026 roll.)
Every table below counts all qualified improved sales above $50,000 in Grove City, so a price band can include mobile homes and a few other uses, and each band says how many sales it holds. All six 12-month bands hold fewer than 10 sales, which makes each one a small group: read them as the kind of home that sells, not as a statistic. The 36-month table has more sales per band, and only the $400,000 to $599,999 band (n=8) is still small. Both tables come from the Charlotte County Property Appraiser.
| Price band | 12-month sales | 12-month median heated sq ft | 12-month median year built |
|---|---|---|---|
| Under $200,000 | 5 (small group) | 960 | 1990 |
| $200,000 to $249,999 | 9 (small group) | 962 | 1971 |
| $250,000 to $299,999 | 6 (small group) | 1,120 | 1972 |
| $300,000 to $399,999 | 7 (small group) | 1,500 | 1977 |
| $400,000 to $599,999 | 4 (small group) | 1,204 | 1965 |
| $600,000 and up | 8 (small group) | 1,923 | 1972 |
| All bands | 39 | 1,152 | Not cut |
| Price band | 36-month sales | 36-month median heated sq ft | 36-month median year built |
|---|---|---|---|
| Under $200,000 | 16 | 869 | 1972 |
| $200,000 to $249,999 | 15 | 984 | 1971 |
| $250,000 to $299,999 | 16 | 1,095 | 1972 |
| $300,000 to $399,999 | 15 | 1,470 | 1970 |
| $400,000 to $599,999 | 8 (small group) | 1,489 | 1974 |
| $600,000 and up | 22 | 2,028 | 1976 |
| All bands | 92 | Not cut | Not cut |
A Grove City budget under $250,000 buys a home of about 870 to 990 heated square feet built in the early 1970s: 14 of the 39 sales in 12 months and 31 of the 92 in 36 months closed below $250,000 (our sums of the bands). Those sales are mostly inland block homes and mobile homes.
The bands show what you give up and what you keep. Under $200,000, the 36-month median was 869 heated square feet (n=16), and from $200,000 to $249,999 it was 984 heated square feet in homes built in 1971 (n=15) (Charlotte County Property Appraiser). On the plat table above, the original plat's 36-month middle half runs $150,500 to $275,000 and the Terrace's runs $230,750 to $368,750, which is why the lower bands draw on both. A buyer at this level should expect to pay for age: roof, electrical and plumbing work and an insurer's 4-point inspection are the likely cost items, and Part 3 of this guide covers each.
Most Grove City canal homes sell well above $500,000: the 36-month middle half for canal-plat single-family sales (Grove City Shores plus Cove) runs $550,000 to $1,300,000 on 15 sales, with a $792,000 median. The $600,000-and-up band holds 8 of the 39 sales in 12 months and 22 of the 92 in 36 months.
That band also holds large inland sales, so it is not all water. Still, the canal figures are the clearest guide to the water premium: $486 per heated square foot on the canal plats against $250 on the inland plats, over the same 36 months (Charlotte County Property Appraiser). If your budget sits between $400,000 and $599,999, you are in the thinnest band of all, 4 sales in 12 months and 8 in 36 months, and sales in it are rare. We watch the pre-MLS and new-listing flow for that range for our buyers.
Grove City homes are old: 451 of the 591 single-family homes on the roll were built in the 1950s, 1960s or 1970s (our sum), and 42 date from 2000 or later. Homes built before 1980 sold at a $283,550 median over 36 months (n=62), and the 1980 to 1999 group at $335,000 (n=19).
The two larger build-era groups are the only ones with enough sales to compare, and their middle halves overlap heavily, so age alone does not set a price. The county's own comparison of sales by decade of construction follows, with small groups flagged (Charlotte County Property Appraiser).
| Built | 36-month sales | Median price | Middle half | Median price per heated sq ft |
|---|---|---|---|---|
| Before 1980 | 62 | $283,550 | $230,000 to $486,250 | $260 |
| 1980 to 1999 | 19 | $335,000 | $180,000 to $580,000 | $249 |
| 2000 to 2017 | 5 (small group) | $1,100,000 | Not printed | $480 |
| 2018 or later | 3 (small group) | $206,000 | Not printed | $208 |
The 2000 to 2017 and 2018-or-later rows hold only 5 and 3 sales, so we draw no conclusion from them. The stock counts by decade are more reliable than any median: the roll lists 67 single-family homes from the 1950s, 183 from the 1960s, 201 from the 1970s, 62 from the 1980s, 35 from the 1990s, 21 from the 2000s, 12 from the 2010s and 9 from 2020 or later. Homes that sold over 36 months follow the same shape, with 10, 17, 35, 10, 9, 5, 1 and 2 sales in those decades (89 sales with a recorded year built). Because the Citizens 4-point rule starts at 20 years, nearly every Grove City home needs one.
Grove City sold only 39 improved homes in 12 months, so we read the county record for your plat first. Book your Grove City buyer consultation, see our buying page, or Call Marc at (239) 287-5873. Selling first? Start with our Grove City home valuation and Call Jesse direct at (239) 898-6072.
Now is a workable time to buy in Grove City if you can accept an old home and a 7.11 percent rate: the county's calendar-year median stood at $300,000 for 2026 through September 9, up from $275,000 in 2025, after peaking near $315,000 in 2023. Charlotte County's October 2026 single-family median was $345,000 on 404 closed sales.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified improved sales above $50,000 of every use, calendar years 2019 to 2026 with 2026 running January 1 to September 9; Florida Realtors Punta Gorda MSA report for October 2026; Freddie Mac Primary Mortgage Market Survey for the week of November 12, 2026; Citizens Property Insurance binding notices.)
Timing in Grove City is a question about three separate clocks: the price trend, the mortgage rate and the insurance binding calendar. The county record answers the first, Freddie Mac and Florida Realtors answer the second, and Citizens answers the third. MLS-only measures for Grove City (days on market, sale-to-list ratio, months of supply for Grove City, active listings): Information not available at time of publishing (checked November 17, 2026). That is why we lean on the county sales and the county-wide Florida Realtors figures below.
The county record says Grove City prices rose to a $315,000 median in 2023, eased to $295,050 in 2024 and $275,000 in 2025, then recovered to $300,000 for 2026 through September 9. Price per heated square foot peaked at $305 in 2022 and stood at $253 in 2026, on all qualified improved sales.
| Year | Sales | Median price | Middle half | Median price per heated sq ft |
|---|---|---|---|---|
| 2019 | 43 | $211,000 | $141,000 to $450,000 | $173 |
| 2020 | 38 | $218,750 | $135,000 to $399,700 | $176 |
| 2021 | 49 | $293,000 | $204,650 to $537,500 | $223 |
| 2022 | 41 | $311,000 | $222,500 to $883,500 | $305 |
| 2023 | 31 | $315,000 | $169,000 to $665,000 | $280 |
| 2024 | 22 | $295,050 | $186,750 to $606,250 | $268 |
| 2025 | 31 | $275,000 | $201,800 to $649,000 | $227 |
| 2026 (to September 9) | 33 | $300,000 | $230,000 to $537,500 | $253 |
Every figure in the table comes from the Charlotte County Property Appraiser. The 2026 row counts 33 sales at a $300,000 median because its window is January 1 to September 9, a different window from the 12-month figure of 39 sales at $289,000. The middle halves are wide, because one year mixes mobile homes, block homes and canal homes, so a median moves when the mix moves. The quarterly view shows how thin the data is.
| Quarter | Sales | Median price |
|---|---|---|
| 2024 Q1 | 5 (small group) | $405,000 |
| 2024 Q2 | 7 (small group) | $305,000 |
| 2024 Q3 | 6 (small group) | $265,000 |
| 2024 Q4 | 4 (small group) | $279,500 |
| 2025 Q1 | 9 (small group) | $285,000 |
| 2025 Q2 | 11 | $315,000 |
| 2025 Q3 | 6 (small group) | $228,400 |
| 2025 Q4 | 5 (small group) | $249,000 |
| 2026 Q1 | 10 | $330,000 |
| 2026 Q2 | 11 | $248,000 |
| 2026 Q3 (to September 9) | 12 | $390,000 |
Seven of the eleven quarters are small groups, and even the larger ones swing with the sale mix: a few canal-plat sales lift a quarter, and a run of inland and mobile sales lowers it. We do not read a direction into a single quarter. What the record supports is a market that rose through 2022 and 2023, softened in 2024 and 2025, and sits in 2026 near the $300,000 level of 2021 to 2024 (Charlotte County Property Appraiser).
County-wide figures add context. Florida Realtors reports that Punta Gorda MSA (Charlotte County) single-family closed sales in October 2026 totaled 404, down 12.4 percent from October 2025, with a $345,000 median, up 0.9 percent; January through October 2026 closed 4,853 sales, up 6.5 percent, at a $350,000 median, up 2.3 percent (Florida Realtors, October 2026 MSA summary). Fewer closings with a flat median points to a slower month, not falling prices. Charlotte County's median sits above Grove City's $300,000 single-family median and far below the $792,000 canal-plat median, so a Grove City buyer should price against Grove City comparables, never the county median.
Grove City buying has a season, but it moves volume more than price: Charlotte County single-family closings peaked at 587 in March 2026 and ran 528 to 562 a month from April to July, then fell to 392 in January and 404 in October. The 2026 monthly median stayed between $344,000 and $360,000.
Those closing counts are Florida Realtors' monthly Punta Gorda MSA figures: 392 in January, 434 in February, 587 in March, 531 in April, 562 in May, 537 in June, 528 in July, 448 in August, 430 in September and 404 in October, which sum to the 4,853 year-to-date sales in the October report (Florida Realtors, July 2026 MSA summary; September 2026 MSA summary; October 2026 MSA summary). The median moved about 4.6 percent across the ten months (our arithmetic), so the season changes how many homes close far more than what they close at. Grove City has a large seasonal-use stock, 515 of 1,882 housing units in the Census estimate and 397 of 1,625 in the 2020 Census count, so showings and owner availability follow the winter season (Census ACS, table B25004; Census 2020 DHC H5). Grove City's own sales are too few, 33 single-family sales in 12 months, to show a reliable Grove City-only season.
Rates moved a Grove City payment by $226 a month in 2026 on the $300,000 median: principal and interest on a $240,000 loan is $1,436 at the 5.98 percent low, $1,614 at the 7.11 percent survey rate of November 12, and $1,662 at the 7.40 percent October high. Taxes, insurance and flood come extra.
Freddie Mac's 30-year survey average was 7.11 percent for the week of November 12, 2026, down for four straight weeks from 7.40 percent in October and above the 6.24 percent of a year earlier; the 15-year average was 6.45 percent (Freddie Mac; Freddie Mac PMMS history). On the $792,000 canal-plat median with 20 percent down, the loan is $633,600 and principal and interest runs $3,791, $4,262 and $4,387 at those same three rates. Using the all-improved 12-month median of $289,000, principal and interest at 7.11 percent is $1,876 a month with 3.5 percent down, $1,847 with 5 percent, $1,750 with 10 percent and $1,555 with 20 percent; at 6.11 percent with 20 percent down it falls to $1,403, a $153 monthly saving. Each $100,000 borrowed adds $673 a month at 7.11 percent on a 30-year loan, or $868 on a 15-year loan at 6.45 percent. These are principal and interest only: the monthly cost section below adds taxes, insurance, flood and the flat county assessments, and leaves out private mortgage insurance because we have no sourced rate for it.
Insurance binding pauses statewide whenever the National Weather Service posts a tropical storm or hurricane watch or warning for any part of Florida, so a Grove City closing between June 1 and November 30 needs wind and flood policies bound well before a storm appears. A suspension does not cancel coverage already bound.
Citizens' rule is plain: agents "may not bind applications for new coverage or policy changes for increased coverage, regardless of effective date" once a watch or warning has been issued for any part of Florida, and its notice for Tropical Depression Nine began at 11:01 a.m. ET on September 27, 2025 (Citizens binding suspension notice). Hurricane Rafael prompted another statewide suspension in November 2024, lifted by that Thursday morning (Insurance Journal). Grove City sits in the Lemon Bay surge plain: 1,438 county address points in the CDP fall in evacuation Zone A and 884 in Zone B (Charlotte County GIS evacuation zones), so we want the binder in the lender file early.
Two more dates matter. Florida's hurricane deductible applies once per calendar year, and on a $300,000 Coverage A it is $6,000 at 2 percent, $15,000 at 5 percent and $30,000 at 10 percent (our arithmetic from s. 627.701, Florida Statutes). And the National Flood Insurance Program is authorized only until December 11, 2026: after a lapse, new and renewal policies stop until Congress acts, existing policies continue to term, and a seller's policy can still be assigned to a buyer (CRS Insight IN10835; NAR NFIP FAQ). We found no source confirming an extension, so a canal home closing in December or January should plan for private flood or an assigned policy.
A Grove City buyer should do three things this month: get a written buyer agreement and a lender pre-approval, ask an insurance agent for wind and flood quotes on the type of home you want, and have us pull the county record for your plat. The 2026 hurricane season ends November 30, and the NFIP authorization ends December 11.
Pre-approval comes first because the AS IS contract sets a 30-day loan approval period by default, and a lender who has not seen a mobile home or canal file can use most of it. Since August 17, 2024, an agent who uses an MLS must enter a written agreement with the buyer before touring a home, stating the compensation and that it is negotiable (NAR, what the settlement means for buyers); the compensation section below covers it. For insurance, quote a Citizens policy and at least one private carrier, because Citizens can write a primary residence only when the private premium is more than 20 percent higher (s. 627.351, Florida Statutes). Then book your Grove City buyer consultation or read our Grove City neighborhood guide first. To compare with the larger Englewood market, see our buy a home in Englewood guide and the Englewood area page. Selling first? Our Grove City seller guide explains how we price a home here.
Buying a Grove City home follows Florida's contract clock: a written buyer agreement before touring, pre-approval, an offer on the Florida Realtors/Florida Bar AS IS or standard form, a deposit, a 15-day default inspection period, four statutory disclosures, a title commitment, an optional survey, an appraisal and a closing recorded with the Charlotte County Clerk.
Data updated: November 2026 (Florida Realtors/Florida Bar ASIS-7x form, Rev. 12/24 26, text read November 17, 2026; Florida Statutes text read November 17, 2026; Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales September 10, 2025 to September 9, 2026)
We tracked 33 qualified single-family sales in Grove City in the 12 months to September 9, 2026, at a median of $300,000 and a median $262 per square foot of county heated (living) area. Counting every improved use, including mobile homes, the group is 39 sales at a median of $289,000 (Charlotte County Property Appraiser). Whichever of the four kinds of Grove City purchase you pick, the paperwork below is the same spine; the sections after it cover what changes for a canal home, a mobile home and a lot. For the place itself, start with our Grove City community guide.
The table shows the default clock printed in the current AS IS form. Every blank can be changed by agreement, and a blank left empty falls back to the default shown.
| Step | Default timing on the AS IS form | What it means for a Grove City purchase |
|---|---|---|
| 1. Written buyer agreement | Before touring | Signed with your agent before the first showing |
| 2. Offer and Effective Date | Day 0, the last signature | Radon, energy brochure, tax summary and flood disclosure due at or before signing |
| 3. Initial deposit | With the offer, or 3 days after the Effective Date | Paid to the Escrow Agent named in the contract |
| 4. Additional deposit | 10 days after the Effective Date | Only if the contract calls for one |
| 5. Inspection Period ends | Day 15 | Cancel in writing at the buyer's sole discretion before it ends |
| 6. Loan Approval Period ends | Day 30 | Financing contingency expires; write the real loan type into the form |
| 7. Title commitment due | 15 days before closing (5 days if cash) | Read every exception, including plat matters |
| 8. Survey | At least 5 days before closing | Optional, at the buyer's expense |
| 9. Closing | The Closing Date | Deed recorded with the Clerk |
Sources for the table: the Florida Realtors/Florida Bar AS IS Residential Contract, ASIS-7x, paragraphs 2, 3, 8, 9 and 12.
Since August 17, 2024, an agent who uses an MLS must have a written agreement with a buyer before touring a home with that buyer, including a live virtual tour. The agreement states the agent's compensation as a specific amount or rate, and says commissions are negotiable and not set by law.
The National Association of Realtors lists the required terms: a specific and conspicuous compensation disclosure, no compensation above the agreed amount, and a conspicuous statement that fees are "fully negotiable and not set by law" (NAR, what the settlement means for buyers and sellers). Offers of compensation between brokers no longer appear on the MLS, but the AS IS form carries Riders FF and GG, the contract tools for asking a Grove City seller to credit or cover some of the buyer's broker fee (AS IS form, ASIS-7x). Florida brokerage law still sets the relationship type, with transaction broker presumed, and the disclosures reach "unimproved residential property intended for use of four units or fewer," so a Grove City lot buyer gets the same notices as a house buyer (s. 475.278, Florida Statutes). Compensation is covered in full later on this page.
Get pre-approved before you tour, because the AS IS form defaults to 30 days after the Effective Date for loan approval and treats a failure to pursue the loan in good faith as a default. A Grove City mobile home or canal home can need a program that is narrower than a plain conventional loan.
Paragraph 8(b) makes the contract contingent on approval of a "conventional FHA VA or other" loan within the Loan Approval Period, "(if left blank, then 30) days after Effective Date," and says a buyer's "failure to use good faith and diligent effort to obtain Loan Approval during the Loan Approval Period shall be considered a default" (AS IS form, ASIS-7x). The "other" blank is where a Grove City buyer writes the actual program. On an original-plat mobile home that might read "FHA Title II manufactured home" or "chattel"; on a canal home it should tell the lender the seawall and flood file are part of the underwriting. Our mobile home section below covers the loan paths, and our financing section later in this guide covers rates and payments. Cash is paragraph 8(a): "This is a cash transaction with no financing contingency."
Two Florida Realtors/Florida Bar forms carry most Grove City resales. The AS IS form lets the buyer cancel for any reason during the inspection period, and the seller makes no repairs. The standard form requires the seller to make repairs up to a stated limit. Most 1950s to 1970s Grove City homes sell on AS IS.
Under paragraph 12(a) of the AS IS form, "If Buyer determines, in Buyer's sole discretion, that the Property is not acceptable to Buyer, Buyer may terminate this Contract by delivering written notice of such election to Seller prior to expiration of Inspection Period," and the deposit comes back (AS IS form, ASIS-7x). One law firm's summary describes the trade plainly: under the standard form the seller must spend up to the filled-in repair limit, while under AS IS the seller "has no obligation to make any repairs" and the buyer's choice is binary (Barnes Walker, AS IS versus standard contract).
On a Grove City block home built in the 1960s, AS IS usually serves both sides: the seller avoids an open repair duty on an old roof, panel or plumbing, and you keep the clean exit. What you give up is the right to force repairs. What you keep is the right to ask for a price change or a credit after the inspections, with a deadline that protects your deposit. We choose the form with you after we have read the file on the specific home.
Two other clauses matter after the storms of 2022 and 2024. Paragraph 10(b) has the seller state that it does not know of improvements "made without required permits or made pursuant to permits which have not been properly closed," unless disclosed in writing, and paragraph 12(c) obliges the seller to hand over plans and documents when your inspection finds open or needed permits (AS IS form, ASIS-7x). Enclosed porches, Florida rooms and carports are common on older Grove City homes, so we ask for the permit history inside the first days of the period.
On a Grove City purchase, the initial deposit goes to the Escrow Agent named in the contract, either with the offer or within 3 days of the Effective Date by default, and any additional deposit within 10 days. If you cancel inside the inspection period the deposit returns; if you default, the seller may keep it.
The AS IS form says the initial deposit either "accompanies offer" or is due within "(if left blank, then 3) days after Effective Date," and "IF NEITHER BOX IS CHECKED, THEN OPTION (ii) SHALL BE DEEMED SELECTED." The additional deposit is due "within ___ (if left blank, then 10) days after Effective Date." Paragraph 13 requires the escrow agent to hold the funds "in escrow within the State of Florida" and disburse them under the contract, and to hold a disputed deposit until the parties agree or a court rules (AS IS form, ASIS-7x).
Our practice on a Grove City offer is to set the additional deposit after the inspection period ends, so the larger sum is released only once the house, the insurance quote and the flood quote have checked out. We confirm the escrow agent's identity and wiring method with the title office before any money moves.
The Grove City inspection period defaults to 15 days after the Effective Date on the AS IS form. Inside it you run every inspection you want, collect insurance and flood quotes and pull county records. Before it ends you cancel in writing, renegotiate, or accept the home's physical condition and any code violations.
Paragraph 12(a) reads: "Buyer shall have ___ (if left blank, then 15) days after Effective Date ('Inspection Period') within which to have such inspections of the Property performed as Buyer shall desire," and the buyer stays responsible "for prompt payment for such inspections, for repair of damage to, and restoration of, the Property" (AS IS form, ASIS-7x). Fifteen days is tight in Grove City. A canal buyer stacks a home inspection, a 4-point, a wind mitigation report, a wood-destroying organism report and a separate marine contractor or engineer for the seawall and dock; a mobile home buyer adds a tie-down and pier check and, for FHA or VA, an engineer's foundation letter that can take longer than the period itself. We ask for more days when the home carries that load.
Paragraph 12(b) allows a walk-through "solely to confirm that all items of Personal Property are on the Property and to verify that Seller has maintained the Property," which is not a second inspection (AS IS form, ASIS-7x). Our inspection section later on this page lists each inspection, who performs it and when it belongs in the contract.
#1 Team in Southwest Florida since 2012, and we set every one of these deadlines on the day your Grove City contract is signed. To start with a pre-approval plan and a written agreement, book your Grove City buyer consultation or Call Marc at (239) 287-5873.
Once a Grove City offer is signed, the seller owes you the Johnson v. Davis disclosure duty and four statutory notices, the title agent issues a commitment, you decide on a survey, the lender's appraisal runs, and you verify wire instructions by phone before money moves. Closing then records the deed with the Charlotte County Clerk.
Data updated: November 2026 (Florida Statutes text and Florida Realtors/Florida Bar ASIS-7x form read November 17, 2026; Charlotte County Clerk recording fees; Charlotte County Property Appraiser roll dated November 5, 2026, qualified single-family sales September 10, 2023 to September 9, 2026)
Under Johnson v. Davis (1985), a Grove City seller who knows of facts that materially affect the value of the home, are not readily observable and are not known to you must disclose them, even on an AS IS contract. What you could see yourself, or find with ordinary care, is weaker ground.
The Florida Supreme Court held that "where the seller of a home knows of facts materially affecting the value of the property which are not readily observable and are not known to the buyer, the seller is under a duty to disclose them to the buyer" (Johnson v. Davis, 480 So. 2d 625 (Fla. 1985)). Licensees carry a parallel duty: even an agent with no brokerage relationship must disclose "all known facts that materially affect the value of residential real property which are not readily observable to the buyer" (s. 475.278, Florida Statutes).
The duty covers what the seller knows. An estate sale, a seller who never lived in the home, or an investor who bought after Hurricane Ian, Helene or Milton may know little, so the gap is closed by your own inspections, the permit history, an elevation certificate and, where the seller will share it, the flood claims history.
Before or when you sign a Grove City contract, Florida law requires the radon notice (s. 404.056), the energy-efficiency rating brochure (s. 553.996), the property tax disclosure summary (s. 689.261) and the seller's flood disclosure (s. 689.302). The flood form took its current shape on October 1, 2025.
| Disclosure | Statute | When | Grove City note |
|---|---|---|---|
| Radon gas | s. 404.056(5) | On a document signed at or before the contract | Notice only; a test is your option |
| Energy-efficiency rating | s. 553.996 | At or before signing | Applies to a building for occupancy, not a vacant lot |
| Property tax summary | s. 689.261 | At or before signing | Do not rely on the seller's bill |
| Flood disclosure | s. 689.302 | At or before signing | Covers only the current seller's ownership |
Sources for the table: s. 404.056, s. 553.996, s. 689.261 and s. 689.302, Florida Statutes.
Radon. The statute requires notice "on at least one document, form, or application executed at the time of, or prior to, contract for sale and purchase of any building," and radon testing for a fee must be done by a person certified by the Department of Health (s. 404.056). The notice is printed in the Florida Realtors/Florida Bar contracts.
Energy brochure. A purchaser of property "with a building for occupancy" must be given information, at or before signing, about the option of an energy-efficiency rating (s. 553.996). It reaches a Grove City block home or mobile home but not a vacant Grove City lot.
Property tax summary. The summary warns, in capitals, that "BUYER SHOULD NOT RELY ON THE SELLER'S CURRENT PROPERTY TAXES AS THE AMOUNT OF PROPERTY TAXES THAT THE BUYER MAY BE OBLIGATED TO PAY IN THE YEAR SUBSEQUENT TO PURCHASE" (s. 689.261). That matters most on a long-held Grove City Shores canal home, where decades under the Save Our Homes cap can leave the seller's bill far below what a new owner pays. Our property tax section works the first-year numbers.
Flood disclosure. "A seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed" (s. 689.302). The statute was created by chapter 2024-215 and amended by chapter 2025-166; Florida Realtors reports the amended version taking effect October 1, 2025, adding the seller's knowledge of any flooding that damaged the property and dropping the federal-only limit on assistance (Florida Realtors, Florida expands flood disclosures). The form asks three yes or no questions: flooding that damaged the property, a flood insurance claim, and assistance received.
Know its limits. The form covers only the current seller's ownership, so it says nothing about flooding under a prior owner, which matters when Ian in 2022 or Helene and Milton in 2024 came before a recent sale. It does not state the flood zone, the base flood elevation or the floor elevation, and it is not an elevation certificate. The AS IS form's own paragraph 10(d) advises the buyer to "verify by elevation certificate which flood zone the Property is in, whether flood insurance is required by Buyer's lender, and what restrictions apply to improving the Property and rebuilding in the event of casualty" (AS IS form, ASIS-7x). Most Grove City addresses sit in a FEMA AE zone, as our Grove City guide maps, so we order the lookup and the flood quote inside the inspection period.
The title commitment, due 15 days before closing by default (5 days if you pay cash), shows who owns the Grove City parcel, the liens to be paid and the exceptions your policy will not cover, with copies attached. Read the plat, easement and restriction exceptions closely, because they control what you can build, fence or dock.
The AS IS form calls for "a title insurance commitment issued by a Florida licensed title insurer, with legible copies of instruments listed as exceptions attached thereto" (AS IS form, ASIS-7x). Who pays for the owner's policy is a contract checkbox. Custom in Charlotte County is that the seller usually pays and selects the agent, but the box checked in your contract controls and the closing agent confirms. Florida sets the owner's premium by rule: $5.75 per $1,000 up to $100,000, then $5.00 per $1,000 up to $1 million (Rule 69O-186.003, Florida Administrative Code). That works out to $1,575 at the $300,000 single-family median, $825 on a $150,000 mobile home on owned land and $4,035 on a $792,000 canal home, before endorsements and search fees.
Title insurance does not insure zoning, flood zone or permit status; the form's Standard A lists land use restrictions among the matters a buyer takes subject to (AS IS form, ASIS-7x). That is why the permit and code research in our inspection section sits beside the title work, not inside it.
A survey is optional under the AS IS form, at your expense and due at least 5 days before closing, but in Grove City we treat it as standard. The 1886 original plat and the mid-century Terrace, Shores and Cove plats produce lot lines that do not match fences, carports or seawalls.
Paragraph 9(d) reads: "At least 5 days prior to Closing Date, Buyer may, at Buyer's expense, have the Real Property surveyed and certified by a registered Florida surveyor," and a seller's existing survey must be furnished within 5 days after the Effective Date (AS IS form, ASIS-7x). On a Grove City Shores or Cove canal lot, the survey shows the seawall, the dock and any encroachment toward the canal or a neighbor. On the original plat, it answers lot-line, vacated-street and mobile home setback questions. On a lot or teardown, the survey plus an elevation certificate drives the rebuild design. Used utility and drainage easements survive old-title cleanup, so a shed in a rear easement is a live issue (s. 712.03, Florida Statutes).
If you finance a Grove City home, your lender orders an appraisal and you pay for it; paragraph 9(b) of the AS IS form lists appraisal fees among buyer costs. The appraisal must support the price for the loan to close, and a low value surfaces inside the 30-day Loan Approval Period.
Paragraph 8(b) ties the financing contingency to loan approval and an appraisal satisfactory to the lender (AS IS form, ASIS-7x). A shortfall is a negotiation, not an automatic exit, unless your contract adds an appraisal clause. We price a Grove City offer the way an appraiser reads it, from recorded sales. Inland plats (Grove City Terrace and the original plat) sold over 36 months at a median $250 per square foot of county heated area, with the middle half between $206 and $285; canal plats sold at a median $486, with the middle half between $411 and $621 (Charlotte County Property Appraiser). Per-square-foot figures use the county's heated (living) area, which is usually smaller than the area on a listing sheet, so never compare the two. A canal appraisal also has to value a seawall and dock that a standard inspection does not rate.
Never wire closing funds for a Grove City purchase on instructions you received by email alone. Call the title or closing office at a number you find yourself, confirm the account details out loud and treat any last-minute change as fraud until proven otherwise. If money goes astray, call your bank immediately.
The AS IS form says the balance is paid "by wire transfer or other Collected funds," which is where criminals strike (AS IS form, ASIS-7x). NAR, citing FBI figures, reported that cyber criminals stole more than $275 million through real estate fraud from at least 12,368 victims in 2025 (NAR, online real estate fraud climbed in 2025). The Florida Bar Journal advises verifying instructions with an "independently verified telephone number," distrusting last-minute changes and, if funds were sent, asking your bank for a recall, asking the receiving bank to freeze the funds and reporting at ic3.gov (Florida Bar Journal, real estate wire fraud). Grove City lots, teardowns and mobile homes often sell for cash, so the entire price can move in one wire.
At a Grove City closing you sign the loan documents, the title agent pays the seller's liens and records the deed with the Charlotte County Clerk, and you receive the keys. Afterward, file for homestead if it is your primary home by March 1, move utility accounts and keep the closing package.
The Charlotte County Clerk charges "First page: $10.00" and "Each additional page: $8.50" to record, collects mortgage stamps at $0.35 per $100 and intangible tax at $2.00 per $1,000 of the mortgage, and lists deed stamps at $0.70 per $100 (Charlotte County Clerk, recording FAQ). By the Clerk's schedule, a 2-page deed records at $18.50 and a 17-page mortgage at $146. The AS IS form makes deed stamps and FIRPTA charges a seller cost and puts note stamps, mortgage recording and appraisal fees on the buyer (AS IS form, ASIS-7x); all parties to a deed remain liable for the tax even if the contract assigns it (Florida Department of Revenue, documentary stamp tax).
Two federal items can reach a Grove City buyer. If the seller is a foreign person for tax purposes, the buyer must generally withhold 15 percent, with no withholding where the buyer will use the home as a residence and the amount realized is $300,000 or less, and 10 percent for a buyer's residence up to $1,000,000 (26 U.S.C. 1445, IRS, exceptions from FIRPTA withholding). FinCEN's residential real estate reporting rule was vacated on March 19, 2026, and while that order stands "reporting persons are not required to file Real Estate Reports," with an appeal pending (FinCEN, Residential Real Estate Rule). Closing costs, taxes and payments are worked in later sections.
#1 Team in Southwest Florida since 2012, and on every Grove City purchase we set the inspection, insurance and title deadlines on the day the contract is signed. To start with a pre-approval plan and a written agreement that spells out how we work, book your Grove City buyer consultation, see our buying process or Call Marc at (239) 287-5873. Selling a home to buy here? See selling your Grove City home or Call Jesse direct at (239) 898-6072.
Buying a Grove City canal home means buying a house plus a seawall, a dock and a waterway. The canals sit in the Grove City Shores and Grove City Cove plats on the east shore of Lemon Bay, and the extra diligence is the seawall, the dock permits, boating access and storm history.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified single-family sales September 10, 2023 to September 9, 2026; Florida Statutes and Florida Administrative Code text read November 17, 2026; NOAA Coast Pilot 5, chapter 12, edition dated November 15, 2026; National Hurricane Center reports for Ian, Helene and Milton)
The county roll holds 160 parcels in Grove City Shores and 52 in Grove City Cove. We tracked 15 qualified single-family sales on those two canal plats over 36 months: a median of $792,000, with the middle half between $550,000 and $1,300,000, a median $486 per square foot of county heated area and a median 1,670 heated square feet. The 58 sales on the two inland plats, Grove City Terrace and the original plat, had a median of $282,500 and $250 per square foot (Charlotte County Property Appraiser). Water nearly doubles the median price per square foot, and it also adds a list of items that no standard inspection covers. If you are weighing the canal against an inland home, our Grove City community guide maps the four plats.
Settle this first, because the state rules change with the answer. The dredged residential canals of Grove City Shores and Cove are artificial waterbodies, carved out of the Lemon Bay Outstanding Florida Water, while Lemon Bay itself and natural Oyster Creek west of County Road 775 are inside it and the aquatic preserve.
The state rule listing the Lemon Bay estuarine system names Stump Pass, Lemon Bay and "Oyster Creek upstream to County Road 775," but excludes "Artificial waterbodies, defined as any waterbody created by dredging, or excavation, or by the filling in of its boundaries" (Rule 62-302.700, Florida Administrative Code). A dock on an artificial canal follows the 1,000 square foot exemption; a dock over Outstanding Florida Waters follows the 500 square foot one. The Lemon Bay Aquatic Preserve covers 7,227 acres, was established in July 1986, and the state describes its waters as "shallow waters that rarely exceed 6 feet in depth" (Florida Aquatic Preserves, Lemon Bay). Ask the seller for any existing state exemption or authorization letter for the dock, and let the survey show which water the lot actually fronts.
A failing Grove City seawall can usually be replaced in front of the old wall, up to 18 inches waterward, without an individual state permit, though the county's seawall permit page asks for an engineered design. A general home inspector does not rate the wall, so hire a marine contractor or engineer.
State law exempts "the restoration of seawalls at their previous locations or upland of, or within 18 inches waterward of" their previous locations, and a new seawall that "between and adjoins at both ends existing seawalls" and follows a continuous line, up to 150 feet (s. 403.813, Florida Statutes). The rule for exempt work in artificial waterways adds that a wall damaged by a discrete event such as a storm may be restored within a year, and that batter piles, king piles or a seawall cap may be added to stabilize one (Rule 62-330.051, Florida Administrative Code). Hurricane Milton struck on October 10, 2024, so that one-year storm window has closed for work still undone in November 2026.
What to look for, from a marine inspector's checklist and not a government rule: cap cracks wider than 1/8 inch, leaning panels, corroded or exposed tiebacks and soil erosion near the cap; the same source puts seawall life at 30 to 50 years depending on type and environment (Waypoint Inspection, seawall failures). The National Hurricane Center put 3 to 5 feet of surge above ground from south of Englewood to Bonita Beach in Helene and 6 to 9 feet from Venice south to Boca Grande in Milton, two weeks apart, so surge that overtops a cap and drains through joints can leave voids behind a wall that looks sound from the yard.
Our canal checklist inside the inspection period: a marine contractor or engineer for the wall and dock, separate from the home inspector; the seawall age, last permit and any post-Milton repair permit; a look behind the cap for depressions; a swim-by or underwater check; and a replacement price at the engineered specification before the offer is set. We also ask the county for permit history, because the county's seawall page says an owner-builder may not rent or sell the property within one year of the permit's completion; confirm that rule and the permit's closeout with the county permit office.
On a Grove City canal, a private dock of 1,000 square feet or less of over-water surface can be built without an individual state permit, counting boat shelters, lifts and roofs, one dock per 65 feet of shoreline. Over Outstanding Florida Waters the limit drops to 500 square feet.
The statute exempts docks "of 1,000 square feet or less of over-water surface area" in artificially created waterways, and 500 square feet in Outstanding Florida Waters; repair or replacement "must be within 5 feet of the same location and no larger in size than the existing dock or pier" (s. 403.813, Florida Statutes). The rule counts "boat shelters, boat lifts, and roofs" toward the area and says the dock "shall be the sole dock" along 65 feet of shoreline, with an exception for narrower lots (Rule 62-330.051). The Department of Environmental Protection also explains that its State Programmatic General Permit lets many docks and shoreline stabilization projects obtain federal authorization through self-certification, and Charlotte County is not on the excluded-county list; work in a federal navigation channel is excluded (Florida DEP, federal permits and coordination).
A dock Milton or Helene destroyed is now past the one-year storm-replacement path in the rule, so a buyer rebuilding one should expect a new-dock review. Ask for the seller's DEP verification or exemption letter, and let the title commitment and survey show whether any dock or wall extends toward state submerged land; the Marketable Record Title Act never extinguishes state title to lands beneath navigable waters (s. 712.03, Florida Statutes).
A pile-supported boat lift added inside an existing legal mooring area is a light state exemption if no platforms, catwalks or roofs are added, and a floating lift that floats at all times is exempt up to 500 square feet, or 200 square feet in Outstanding Florida Waters. The county still permits the work and its electrical.
The state rule exempts "the installation of a pile-supported boat lift within an existing mooring area at a docking facility" that is legally in existence (Rule 62-330.051), and the statute caps exempt floating vessel platforms and lifts at 500 square feet, or 200 in Outstanding Florida Waters (s. 403.813). On the county side, Charlotte County's permit pages, which a buyer should confirm with the permit office, say that from October 1, 2026 every dock and boat lift application must include a survey, site plan or scaled hand-drawn site plan showing existing and proposed structures, easements, the high-water line and distances from the house and seawall; that a new lift needs the manufacturer's original engineering plans; that a used or relocated lift needs a hold harmless agreement; that lift electrical needs its own permit; and that starting work before a permit may bring a penalty of up to four times the permit fee (Charlotte County, building permits).
If a Grove City listing shows a used lift, we ask whether the hold harmless agreement and the electrical permit were filed, and when the motor and cables were last replaced. Surge from Helene and Milton may have reached lift motors and dock electrical boxes along Lemon Bay, so a lift that predates October 2024 deserves a look. A vacant canal lot can be walled and docked before the house is built; the county's FAQ says so, and also says nothing may be stored on a vacant lot, which you can confirm with county zoning at 941.743.1964.
Oyster Creek, the natural creek beside Grove City's canal streets, is a named public channel under the West Coast Inland Navigation District's general permit, so its main channel can be maintained as public boating infrastructure. The private side canals in Grove City Shores and Cove are not named, and no county waterway assessment for them turned up in our search.
The state rule lets the district dredge public channels that make "a significant contribution to public boating traffic," names "Ainger Creek," "Gottfried Creek-Englewood Secondary Channel" and "Oyster Creek," limits dredging to "a top width of 30 feet and a bottom width of 20 feet," and says "Overdredging is not allowed" (Rule 62-330.411, Florida Administrative Code). The Grove City Street and Drainage assessment is $220 per unit for fiscal 2026 and 2027, and its stated purpose is the platted streets and drainage, not canals or seawalls (Charlotte County, Grove City FY2026 Adopted and FY2027 Approved budget). A canal owner therefore pays privately for seawall repair and any canal dredging, and the county will not necessarily dredge a shoaled canal.
Private maintenance dredging is possible. The statute exempts maintenance dredging of existing manmade canals back to the original design, limited to "a depth of no more than 5 feet below mean low water" where no prior permit exists, with spoil placed on a self-contained upland site and 30 days' notice to the Department (s. 403.813, Florida Statutes). Separately, the public cleared storm debris from the area's canals in 2026: the Boca Beacon reported a federal grant helping the county clean 37 miles of canal "including in the Placida, Grove City and Englewood areas," which was debris removal, not dredging (Boca Beacon, February 5, 2026).
From a Grove City canal, the run to the Intracoastal Waterway is slow speed all year under the state manatee rule for Lemon Bay, with 25 miles per hour allowed only in the Intracoastal channel and the marked Stump Pass channel. Budget your trip time accordingly, and follow the posted signs in the canals.
The rule sets Slow Speed all year on "All waters of Lemon Bay south of the Sarasota/Charlotte County line, north of the Boca Grande Causeway," and "west of State Road (SR) 775," excluding the Intracoastal channel, the marked Stump Pass channel and the marked channels in Placida Harbor, and 25 miles per hour in the Intracoastal channel; the zones "include all associated and navigable tributaries, lakes, creeks, coves, bends, backwaters, canals, and boat basins" (Rule 68C-22.015, Florida Administrative Code). The rule text does not name Oyster Creek, and it is not stated outright whether canals east of Placida Road fall inside the zone, so treat the signs as controlling. The preserve adds that the bay is slow speed across most of its area outside the Intracoastal Waterway, with seagrass damage fines "up to $1,000" (Florida Aquatic Preserves, Lemon Bay). The preserve's Charlotte Harbor office takes questions at 941-389-5200.
You may trim mangroves on a Grove City waterfront lot within limits, but you may not remove them without a permit. Charlotte County has not been delegated the state mangrove program, so the Florida Department of Environmental Protection administers trimming on Grove City lots, while neighboring Sarasota County runs its own.
The Department's list of delegated local governments names Miami-Dade, Broward, Hillsborough and Pinellas counties, the Town of Jupiter Island, the City of Sanibel and Sarasota County; Charlotte County is not listed (Florida DEP, delegated mangrove programs). An owner trimming without a professional may trim mangroves up to 10 feet tall, never below 6 feet, on a shoreline of 150 feet or less; a professional mangrove trimmer may trim up to 24 feet, in stages so that no more than 25 percent of the foliage is removed annually on trees 16 feet or taller, with 10 days' written notice for a first trimming of red mangroves (s. 403.9326, Florida Statutes). Who counts as a professional trimmer, including certified arborists and certified wetland scientists, is in the statute (s. 403.9329).
Ask the seller whether past trimming used the exemption or a permit, because over-trimming becomes the new owner's problem after closing. The same chapter defines the fringe that counts: mangroves within 50 feet measured waterward from the trunk of the most landward tree (s. 403.9325).
From a Grove City canal, a boat runs through Oyster Creek into Lemon Bay and south to Stump Pass, near the south end of the bay, which opens to the Gulf. Stump Pass lies between the two Intracoastal bridges the Coast Pilot lists, and no published controlling depth for the pass or Oyster Creek turned up.
The NOAA Coast Pilot calls Lemon Bay "a shallow lagoon that extends 15 miles northwest behind the barrier beach from the head of Placida Harbor to Alligator Creek," places Stump Pass "near the south end of Lemon Bay southwest of Mile 41.0," and warns the Intracoastal channels "may shoal several feet in places between maintenance dredgings," deferring to the Army Corps of Engineers for controlling depths (NOAA Coast Pilot 5, chapter 12). Its bridge table lists the State Route 776 bascule at Mile 43.5 with 26 feet vertical clearance and the Boca Grande swing bridge at Mile 34.3 with 22 feet. Stump Pass is dredged periodically: a March 2022 job moved 200,000 cubic yards of sand, about half to Stump Pass Beach State Park and half to Knight Island, and was designed to improve boat passage (DredgeWire, Stump Pass channel dredging).
The binding limits are local: the fixed County Road 775 span over Oyster Creek for canals east of Placida Road, for which we found no published clearance, any canal bridge inside Grove City Shores, and the depth at your own dock. Before you write an offer on a home bought for the boat, measure bridge clearance at high tide and depth at the dock at low tide.
Hurricane Ian brought Grove City rain, not surge: the National Hurricane Center recorded 26.95 inches there, the highest total of the storm. Helene put 3 to 5 feet of surge above ground from south of Englewood to Bonita Beach, and Milton put 6 to 9 feet above ground from Venice to Boca Grande.
The Ian report says "The highest storm total rainfall recorded was 26.95 inches in Grove City, Florida," and that sensors in Port Charlotte and Englewood "remained dry and did not measure storm surge due to offshore winds" (National Hurricane Center, Hurricane Ian report). For Helene, the Center reports surge of "4 to 6 ft AGL" from Venice to south of Englewood and "3 to 5 ft AGL" from south of Englewood to Bonita Beach, and in Charlotte County "8 structures were destroyed, 1,900 others had major damage and 750 others had minor or moderate damage, and most of this was due to storm surge" (National Hurricane Center, Hurricane Helene report). Its Milton report puts surge at 6 to 9 feet above ground level from Venice southward to Boca Grande, with an isolated peak of up to 10 feet near Manasota Key, notes that "the same area had a significant storm surge from Hurricane Helene, two weeks prior," and lists a Grove City station with a 54 knot sustained wind and 74 knot gust (National Hurricane Center, Hurricane Milton report).
Grove City sits near the Helene range boundary, so we quote both ranges and do not pick one. Against base flood elevations of 8, 9 or 10 feet on most Grove City flood maps, which our community guide records, a slab-on-grade block home built before those maps took effect may have taken water in Helene, Milton or both. We ask every canal seller: did water enter, were repairs permitted, did the county make a substantial damage determination, what is the flood claim history and is there an elevation certificate.
Top 1% Real Estate Agents Nationally Since 2008, and before a Grove City canal offer we pull the survey, the permit history, the flood lookup and the seawall and dock reports so the house is priced with the wall and the water. To walk a canal home with that file in hand, book your Grove City buyer consultation or Call Marc at (239) 287-5873. Comparing it with the wider area? See our Englewood buyer guide. Selling a canal home first? Get your Grove City home's value or Call Jesse direct at (239) 898-6072.
A Grove City mobile home is bought with the land under it. The 136 mobile homes on the county roll sit on individual deeded lots of the original 1886 plat, so there is no lot rent. The questions are real property status, year built, anchoring and which loan fits.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales to September 9, 2026; Florida Statutes and Florida Administrative Code text read November 17, 2026; Citizens Property Insurance 2026 approved rate changes by county; HUD Title I Letter 488, March 18, 2024)
Mobile homes are a small part of Grove City sales. We tracked 4 qualified mobile home sales in the 12 months to September 9, 2026, at a median of $151,000, and 9 over 36 months at a median of $150,000, with the middle half between $115,000 and $182,000 (Charlotte County Property Appraiser). Both are small groups, so we print the counts and draw no percentage conclusion. For comparison, the 33 single-family sales in the 12-month window had a median of $300,000. Because the land is a large share of a mobile home price, the questions that decide value are legal and structural, and our home valuation page walks an owner through the same ones from the seller's side.
No. A mobile home on its own deeded lot on the original Grove City plat is land you own, so there is no lot rent, no park prospectus and no park approval of the buyer. Florida's Mobile Home Act applies only to homes on rented lots in parks of 10 or more lots.
The statute applies to "any residential tenancy in which a mobile home is placed upon a rented or leased lot in a mobile home park in which 10 or more lots are offered for rent or lease" (s. 723.002, Florida Statutes). A few sections reach owners of lots in mobile home subdivisions, but the lot rent increase and park closure protections do not. Chapter 723 matters only if you are comparing a Grove City owned-land home with a home in a rented-lot park elsewhere in the Englewood area. The original plat carries MHC (manufactured home conventional) zoning, which the county code describes as allowing "manufactured homes and single-family detached dwelling units and related uses on individual platted lots" (Charlotte County code as published on Zoneomics, Sec. 3-9-37).
A Grove City mobile home is real property when the same owner owns the land, the home is permanently affixed and it carries a current RP sticker. Otherwise it is presumed tangible personal property and carries a state title like a vehicle. The status is fixed as of January 1 each year.
The rule says that where the owner owns the land and the home has a current sticker, "The property appraiser shall assess such mobile home as realty and it shall be taxed as real property," and that "The owner is required to purchase an 'RP' sticker from the tax collector"; a home without a current sticker "shall be presumed to be tangible personal property," a presumption "that may be rebutted only by facts in existence at the January 1 assessment date" (Rule 12D-6.002, Florida Administrative Code). The state motor vehicle agency (FLHSMV) adds that a buyer of a home with land that was not previously declared real property can get an RP decal the same day with the property appraiser's certificate, but if the home will not become real property until next year a regular decal comes first (FLHSMV procedure TL-39).
Our steps on a Grove City mobile home: look up the parcel on the Property Appraiser record to see which roll carries the home; ask the seller for the state title or proof of retirement; confirm the RP decal status; and, if you will live there, make sure land and home are in your name by January 1 to file for homestead by March 1.
Retiring the title converts a Grove City mobile home that is permanently affixed to land the same person owns into real property that transfers only by deed. The owner records the title, the legal description and a sworn statement with the Clerk, then applies to the state, and afterward no separate lien on the home can exist.
The statute provides "a process by which the owner of a mobile home which is permanently affixed to real property owned by that same person may permanently retire the title," a retired home "shall be conveyed by deed or real estate contract and shall only be transferred together with the property to which it is affixed," and afterward "a separate security interest in the mobile home shall not exist" (s. 319.261, Florida Statutes). To remove the home later, the landowner needs a new title with an affidavit of all owners and lienholders and a title insurer's certification dated within 10 days.
The state's own procedure adds details that stall closings: all titles of a double or triple wide must be submitted, so a missing title needs a duplicate first; where an owner died, "the customer must obtain a title in their name prior to retiring the title"; and only mobile homes with body type HS may be retired, not park trailers or modular homes (FLHSMV procedure TL-39). If the title is still live, the title agent must handle both the deed and the state title at closing, and the lender decides whether to require retirement.
Homes built on or after June 15, 1976 are built to the federal HUD code and carry a certification label on each section and a data plate inside. A Grove City unit without that label is hardest to finance and insure, because FHA and Fannie Mae will not finance a home built before that date.
Federal rules require a permanent label at the taillight end of each transportable section, "separate and distinct from the data plate," and the data plate, kept near the main electrical panel, shows the manufacturer, serial number, date of manufacture, label numbers, roof load zone and wind load zone (24 CFR 3280.11, 24 CFR 3280.5). Florida law defines a "manufactured home" as one fabricated on or after June 15, 1976 with a federal certification seal, as our Grove City valuation page records. Read the label and the plate during the inspection period; the plate is usually in a kitchen cabinet or closet near the panel.
Three vintages sit on the original plat, and each finances and insures differently: pre-1976 units with no label, 1976 to mid-1994 HUD-code homes built to the older wind standard, and later homes. We treat the first as a cash or special-lender purchase and read the second against the insurer's age rules below.
Charlotte County is in HUD Wind Zone III, the strongest wind design zone, and the county requires a Wind Zone 3 home for a new or replacement installation. Anchor strength also changes in 1994: Type I anchors cover homes built before July 13, 1994 and stronger Type II anchors cover later homes.
The federal standard lists Charlotte County in Wind Zone III (110 mph) with Collier, Lee, Sarasota and other Gulf counties, and sets design pressures such as anchorage drag of plus or minus 47 psf in Zone III against 39 psf in Zone II (24 CFR 3280.305). Florida's installation rule sets Type I anchors, for homes made before July 13, 1994, at a working load of 3,150 pounds and Type II anchors, for later homes, at 4,000 pounds (Rule 15C-1.0104, Florida Administrative Code). Charlotte County's mobile home permit page, which you should confirm with the permit office, says a replacement or newly set home must be compliant with HUD Wind Zone 3 (Charlotte County, residential mobile home permits). A data plate showing Wind Zone I or II means the home was not designed to Zone III loads.
A Grove City mobile home loan depends on whether the home is real property. A home on a live state title is personal property, financed with a chattel loan that is usually shorter and higher in rate. A retired-title home on owned land can use a mortgage, including FHA Title II or, if newer, Fannie Mae MH Advantage.
FHA Title I insures home, lot, and home-and-lot loans without requiring real property status, and the lender's coverage is 90 percent; borrowers must occupy the home, and adjustable-rate products are not permitted (FDIC, FHA Title I manufactured home loan insurance). HUD's Title I Letter 488, dated March 18, 2024, sets 2024 limits that are reviewed annually: $105,532 for a single-section home loan, $193,719 multi-section, and $148,909 and $237,096 for single-section and multi-section home-and-lot combinations (HUD Title I Letter 488). Those are 2024 limits, so ask the lender for the current ones. Title II is the standard FHA mortgage on land plus a HUD-code home on a permanent foundation, and FHA rejects homes built before June 15, 1976.
Fannie Mae's MH Advantage allows a minimum credit score of 620 and loan-to-value up to 97 percent, requires both the home and the land to be real property under state law, and excludes most single-wide homes, according to the FDIC's summary (FDIC, Fannie Mae MH Advantage). It rarely fits an older Grove City unit, but it can fit a buyer replacing an old unit with a new multi-section home on an owned lot. Our order of steps: confirm the HUD label and year, confirm real property status, get a lender letter that names the program, write that program into the "other" blank of paragraph 8(b), and order any engineer's foundation certification early, because the visit can outlast a 15-day inspection period.
Citizens Property Insurance's 2026 approved average for a Charlotte County mobile home multiperil policy is $2,810 a year, nearly flat at a change of minus 0.4 percent, against $2,887 for a Charlotte County owner's policy. These are countywide averages, not Grove City quotes, so get a quote on the specific home.
The Citizens rate-change filing lists Charlotte County mobile home policies (MHO3 and MDP1) at an average of $2,810, 2,115 policies and a change of minus 0.4 percent, and homeowners (HO3) policies at an average of $2,887, a change of minus 5.9 percent (Citizens, 2026 approved rate changes by county). So a mobile home buyer should not expect the rate relief block homes got. By statute, Citizens covers mobile homes built before 1994 only at actual cash value of the dwelling, not replacement cost (s. 627.351, Florida Statutes).
Three more points. Citizens requires a four-point inspection on any property owner, dwelling or mobile home application for a property more than 20 years old (Citizens, inspections). Its mobile home policy does not cover rising water, flood or tidal surge (Citizens, mobile home policies), and a Citizens policy with wind coverage on a home in the Special Flood Hazard Area must carry flood insurance (Citizens, flood requirement); by January 1, 2027, the requirement reaches all Citizens personal residential policies with wind coverage. And insurers writing windstorm coverage on mobile homes may do so only if the home "has been installed in accordance with the requirements of this chapter and department rules" (s. 320.8325, Florida Statutes), so proof of compliant tie-downs can decide the quote.
A Grove City mobile home inspection should read the anchors, straps and piers against the state installation rule, and the HUD label and data plate against the year. A licensed installer or engineer letter on the tie-downs is what an insurer or an FHA or VA lender can ask for.
Under the state rule, diagonal frame tie-downs are "spaced no farther apart than five feet four inches (5'4'') on center," anchors sit within two feet of each end, at least four anchors and straps are required at the end of each section, and "Over-the-roof tie-down straps or tie points shall be connected to a ground anchor" (Rule 15C-1.0104). The state motor vehicle agency tells owners to replace straps or anchors that show corrosion and to confirm that support piers contact the frame, and says a licensed installer must perform installations (FLHSMV, mobile and manufactured home guidance).
Our list for a Grove City unit: label and data plate; strap and anchor count, spacing and corrosion; piers on the frame, with the ground beneath them checked after the surge of 2022 and 2024; roof, whether original or a roof-over, and its permit; belly wrap and floor moisture; additions such as carports or Florida rooms and their permits, since the county's mobile home pages call for a separate addition permit, which you can confirm with the permit office; and the water heater and electrical service.
Yes, with a county permit, a Wind Zone 3 home and a permanent foundation, but federal rules put the lowest floor of a replacement home at or above the base flood elevation in an AE zone. Whether the original plat counts as an existing mobile home subdivision, which allows a lower option, is the county floodplain administrator's decision.
The federal rule says manufactured homes placed or substantially improved in AE zones outside a park or subdivision must "be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated to or above the base flood elevation and be securely anchored"; in an existing park or subdivision not otherwise covered, the chassis may instead be on reinforced piers "no less than 36 inches in height above grade" (44 CFR 60.3). The definitions say an existing subdivision is one whose streets, utilities and pads were completed before the community's first floodplain rules, and treat "the placement of a manufactured home on a foundation" as the start of construction (44 CFR 59.1). Charlotte County's own requirements, which a buyer should confirm with the county's Floodplain Coordinator at 941.743.1469 (Charlotte County, Flood Information), call for a permanent reinforced foundation and an elevation certificate in the high-risk flood zone.
The 50 percent rule bites hard on an older unit. Charlotte County's page says that a repair or improvement costing more than 50 percent of the building's value, land excluded, must bring it to current code including elevation (Charlotte County, 50 percent rule), and Florida bars a cumulative look-back, so your test is per project, not the seller's past remodels (s. 163.31795, Florida Statutes). A big renovation of a low-value unit often costs more than pricing a replacement from the start.
Nationally Recognized Top Producing Realtors, and on a Grove City mobile home we read the title status, the HUD label, the tie-downs and the loan path before you commit. To go over a specific home, book your Grove City buyer consultation, see our buying process or Call Marc at (239) 287-5873. Own a mobile home here you plan to sell? Start with your Grove City home valuation or Call Jesse direct at (239) 898-6072.
After closing, a Grove City owner answers to Charlotte County, not to a homeowners association: county zoning and code, the Grove City Street and Drainage assessment, the Englewood fire district charge, Englewood Water District connection rules and any recorded plat restrictions that survive on the title commitment. No mandatory HOA was found.
Data updated: November 2026 (Charlotte County Grove City FY2026 adopted and FY2027 approved budget; Englewood Area Fire Control District 2026-2027 assessments; Englewood Water District Customer Rules and Regulations, effective October 1, 2026; Florida Statutes text read November 17, 2026; county code as published on Zoneomics, read November 17, 2026)
We found no mandatory homeowners association for Grove City, Grove City Shores, Grove City Terrace or Grove City Cove in government sources. Florida's HOA disclosure summary applies only where membership is mandatory, so a Grove City buyer should still read the title commitment for any recorded association on the specific parcel.
The statute requires a prospective parcel owner "in a community" to receive a disclosure summary before signing, starting with "AS A PURCHASER OF PROPERTY IN THIS COMMUNITY, YOU WILL BE OBLIGATED TO BE A MEMBER OF A HOMEOWNERS' ASSOCIATION," and if it is not given, the purchaser may cancel within 3 days after receiving it or before closing, a right that cannot be waived (s. 720.401, Florida Statutes). The Grove City Street and Drainage assessment is a county assessment, not an association. Rules come from the county, the water district and state law, which is why the sections above on docks, mangroves and flood rules matter after closing too.
Sometimes. Under Florida's Marketable Record Title Act, restrictions older than a 30-year root of title are cleared unless a later deed refers to them by book and page or plat name, or an owner filed a preservation notice. Restrictions shown on a Grove City plat itself, and easements still in use, can survive.
The Act gives an owner "vested with any estate in land of record for 30 years or more" a marketable title "free and clear of all claims except the matters set forth as exceptions" (s. 712.02, Florida Statutes). The exceptions include restrictions preserved "by specific reference to the official records book and page number, instrument number, or plat name," easements in use "so long as the same are used," and state title to lands beneath navigable waters (s. 712.03). A property owners' association may preserve covenants by filing a notice, which lasts at least 30 years (s. 712.05). A legal description reading "Lot X, Block Y, GROVE CITY SHORES, according to the plat thereof" names the plat, so matters on the plat can survive. We did not find recorded restrictions for the four Grove City plats online, so the title search on the parcel is the answer.
A Grove City lot or home pays the county's street and drainage assessment of $220 per unit for fiscal 2026 and 2027, and a vacant lot pays the same $220 as an occupied one. Separately, the Englewood fire district charges $290.78 on a home and $63.95 on a vacant lot.
The Charlotte County budget for the Grove City unit lists the $220 rate for both years (Charlotte County, Grove City FY2026 Adopted and FY2027 Approved budget), and the fire district posts its assessments on its own page (Englewood Area Fire Control District, assessments). The unit funds platted streets and drainage, including paving, and the county's FY2027 proposed budget carries a Grove City paving program (Charlotte County, Grove City FY2027 Proposed budget). It does not fund canals, seawalls or docks. Both lines appear on the tax bill as non-ad valorem charges, so ask for the bill's non-ad valorem section, not just the ad valorem total.
Grove City lots fall under Charlotte County's zoning code: residential single-family (RSF) districts on the inland and canal plats and manufactured home conventional (MHC) zoning on the original plat. Setbacks, lot coverage and accessory rules depend on the district, and the county's zoning office at 941.743.1964 confirms a specific parcel.
In the RSF-5 district, the minimum lot is 7,500 square feet and 70 feet wide, with a 25-foot front setback, 7.5-foot interior sides, a 20-foot rear, 20 feet abutting water, 40 percent coverage and 38-foot height; RSF-3.5 requires 10,000 square feet and 80 feet; the RSF list permits a "Manufactured home (DCA)" built to 150 miles per hour exposure C but prohibits "mobile homes" (Charlotte County code as published on Zoneomics). In MHC the lot minimum is 7,500 square feet and 60 feet, with a 25-foot front, 7.5-foot sides, a 15-foot rear and the same 40 percent coverage and 38-foot height, and permitted homes include a HUD home to Wind Zone 3 or a DCA home; on a 7,500 square foot lot, 40 percent coverage is 3,000 square feet of footprint across all buildings. A Placida Road parcel in a commercial district can carry 0 residential units per acre by the table, so check the parcel's zoning before assuming a house can go there.
Two everyday rules matter on a canal or small lot. Fences may be 6 feet high behind the front setback line, but "no fence or wall greater than four (4) feet in height shall be permitted closer than ten (10) feet" to the water line or seawall, and boats, recreational vehicles and trailers on a developed residential lot must be parked "behind the leading edge of the principal building or within a paved driveway," operable, and never stored on a vacant lot or right-of-way (Charlotte County code as published on Zoneomics, chapter 3). Confirm the current text on the county's code site before you rely on it.
Englewood Water District serves Grove City, and some parcels are still on septic. When the district gives written notice that sewer is available, a Grove City owner must connect within 365 days, and the district treats the property as connected for charges when that period ends, whether or not the hookup was made.
The district's rule requires developed parcels to connect within the shortest of 30 days after a well or septic failure, before a certificate of occupancy for a modification that overloads the septic system, or "Within 365 days after the date of written Notification of Water and/or Wastewater Service Availability," and treats the property as connected "at the expiration of the connection period, whether actual connection to the central system has been made or not" (EWD Customer Rules and Regulations). State law matches the 365 days for a properly functioning septic system, requires the utility to give notice at least a year before availability and lets owners prepay charges over up to 2 years (s. 381.00655, Florida Statutes).
On connection the owner must abandon the septic system, pay for the lateral from the house to the point of collection, and, in a low-pressure area, buy and install the grinder pump station; the district inspects the abandonment (rules 22.17 to 22.20 in the same document). Ask the seller for any availability notice, and ask the district for a service availability letter for the parcel.
The county health department permits and inspects septic systems, and a Grove City lot that can reach sewer generally cannot get a new septic permit. Sewer counts as available if a line sits in a public easement or right-of-way abutting the lot. Pre-1972 platted lots face a 50-foot setback from surface water.
Florida's Department of Environmental Protection took over the septic program on July 1, 2021, but the county health department offices "will continue to do the permitting and inspection" (Florida DEP, onsite sewage). The statute sets a 75-foot setback from the mean high-water line of tidal water and, for lots platted before 1972, a 50-foot minimum surface water setback (s. 381.0065, Florida Statutes). A narrow canal lot may not fit a drainfield 50 feet from the seawall, which is one reason Grove City canal rebuilds lean on sewer. Wells have their own limit: the county health department will not allow an irrigation well within one mile of an existing district water supply well head unless the district's models show no harm (EWD Customer Rules and Regulations). Dock, seawall and mangrove rules are in the canal section above, and short-term rental law is in the next question.
State law bars local governments from prohibiting vacation rentals or regulating their duration or frequency, except for rules adopted on or before June 1, 2011. With no Grove City HOA found and no county registration ordinance turned up in our search, a Grove City home can generally be rented short term, subject to state licensing and county taxes.
The statute says "A local law, ordinance, or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals," with an exception for local laws adopted on or before June 1, 2011 (s. 509.032, Florida Statutes). Rentals of six months or less call for a state license and sales tax registration and a county tourist tax account; confirm the current requirements with the Charlotte County Tax Collector before you buy for rental income. The county code still governs parking and occupancy rules for any home.
Platinum Sales Production Award Winners, and before a Grove City offer we pull the tax bill, the water district status and the recorded plat so you know what binds the home before you commit. To go over a specific address, book your Grove City buyer consultation or Call Marc at (239) 287-5873. Comparing Grove City with the rest of town? Our Englewood buyer guide covers the wider area, and our Englewood area page maps the neighborhoods.
Buying a Grove City lot or teardown means buying a build. The county roll lists 136 vacant residential lots, there were no first sales of new homes in the last 12 months, and only 9 single-family homes on the roll were built in 2020 or later, so a new Grove City house is almost always one you build.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, qualified vacant lot sales over $1,000, 2019 to September 9, 2026; Englewood Water District Customer Rules and Regulations, effective October 1, 2026; Englewood Area Fire Control District impact fee page; Florida Statutes text read November 17, 2026; Florida Building Commission workplan, October 2026)
New construction is rare enough that the county roll shows none to price: 0 first sales of new homes in the 12 months to September 9, 2026, and 1 in 36 months, a single sale that is too small a group to print a figure for (Charlotte County Property Appraiser). A buyer who wants a new house builds it on a vacant lot, on a storm-damaged teardown, or on an original-plat lot after removing a mobile home. For builders and new homes across the wider area, see our new construction in Englewood page, and for how the lot sits within Grove City, see our Grove City community guide.
Grove City vacant lot sales are few every year, so every figure below is a small group. Over 36 months we tracked 8 qualified lot sales at a median of $47,500, with the middle half between $45,250 and $61,925, and the most recent 12 months show a single sale at $65,000.
| Year | Qualified lot sales (n) | Median price | Middle half |
|---|---|---|---|
| 2019 | 5 | $25,000 | $12,500 to $111,200 |
| 2020 | 4 | $27,450 | $21,225 to $48,750 |
| 2021 | 8 | $120,000 | $34,675 to $552,475 |
| 2022 | 6 | $47,500 | $35,500 to $201,250 |
| 2023 | 7 | $50,000 | $45,000 to $55,000 |
| 2024 | 2 | $154,500 | Not printed, 2 sales |
| 2025 | 2 | $46,500 | Not printed, 2 sales |
| 2026 to September 9 | 1 | $65,000 | Not printed, 1 sale |
Source: Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales of vacant residential lots priced over $1,000. Every year is a small group, so read each row as what sold, not as a trend. The 2021 row has a middle half from $34,675 to $552,475, a spread that shows how unlike one lot can be from another, and it is the reason we price a specific lot from its own file and not from a median.
What you can build depends on the parcel's zoning district. An inland or canal RSF lot allows a single-family home or a DCA modular home but not a HUD mobile home; an original-plat MHC lot allows a Wind Zone 3 HUD home or a site-built house, if the lot meets district rules.
RSF-5 and MHC both need 7,500 square feet, 70 and 60 feet wide respectively, and a lot that is smaller may be a lawful lot of record, which the county's zoning office at 941.743.1964 confirms (Charlotte County code as published on Zoneomics). The MHC district's stated purpose is to "allow manufactured homes and single-family detached dwelling units and related uses on individual platted lots." Residential multifamily districts allow 3.5 to 15 units per acre, with half the building height but not less than 15 feet at the sides and rear, and which Grove City parcels carry multifamily zoning is a question for county zoning, not an assumption. The setbacks, coverage and fence rules are in our rules section above; a buyer who wants a dock before the house can generally build one, with the county permit, as the canal section explains.
A Grove City teardown follows a fixed sequence: confirm zoning and lot conformity, get the water district's service letter, order a survey and elevation data, abandon any septic, pull the demolition permit, then the building permit with flood elevations on the drawings, pay impact fees, and finish with inspections and the certificate of occupancy.
Our ten-step order, assembled from the sources in this section, is: (1) zoning and lot conformity with county zoning; (2) Englewood Water District availability letter and capacity status; (3) survey with easements and the mean high-water line; (4) elevation certificate, flood zone and base flood elevation; (5) a septic abandonment permit from the county health department if the old house was on septic; (6) the county demolition permit; (7) the building permit, with the base flood and proposed lowest floor elevations on the drawings; (8) impact fees paid before permit issuance; (9) an elevation certificate during construction; and (10) final inspections, with the water district connection before the certificate of occupancy. A third-party permit guide, last verified in April 2026, lists a $150 plan check fee for single-family residential, intake review in 1 to 2 business days and posted average plan review of 10 to 11 business days (Jaspector, Charlotte County permits); outside sign-offs add time, so ask the county for the current timeframes.
A buyer of a vacant Grove City lot pays the full county impact fee, $7,519 in the Englewood fire district column, plus the fire district's $404.35, a total of $7,923.35. A same-use teardown replacement is protected by state law, which bars an impact fee for replacing a previously existing structure of the same land use.
The county's master fee schedule, approved July 14, 2022 and effective October 12, 2022, lists $7,519 for a single-family home in the Englewood fire district area, and the fire district's own page lists $404.35 for a single-family home, so a vacant lot buyer pays $7,923.35 (Impact Fees, Charlotte County summary, Englewood Area Fire Control District, fire impact fee). We found no newer adopted schedule, so confirm the figure with the county at permit intake.
For a teardown, the statute says a local government "may not assess an impact fee for the reconstruction or replacement of a previously existing structure" if the replacement is "of the same land use as the original structure" and "does not increase the impact on public facilities beyond that of the original structure," and a larger replacement may be charged on the difference (s. 163.31801, Florida Statutes). Increases to an impact fee may not exceed 50 percent of the current rate, phased over four years above 25 percent. Whether replacing a mobile home with a site-built house counts as the same land use, and what proof of the old structure the county wants, are unsettled in the sources we read, so we ask the county before a buyer relies on the credit.
On a Grove City lot with no prior capacity paid, Englewood Water District's capacity charges and AGRF charges total $15,865.50 per equivalent residential unit, and a district-installed 5/8-inch meter adds $2,000 on a short tap or $3,250 on a long tap, so $17,865.50 or $19,115.50 before the plumber's lateral.
The district's rules, effective October 1, 2026, list water plant capacity at $3,062.00, water distribution at $1,200.00, wastewater plant capacity at $5,170.00, wastewater collection at $5,817.00, and AGRF of $229.50 for water and $387.00 for wastewater; adding them gives $4,491.50 for water, $11,374.00 for sewer and $15,865.50 for both (EWD Customer Rules and Regulations). The monthly base facility charges are $29.37 for water and $42.75 for wastewater per equivalent residential unit. A "short tap" means the water main is on the property side of the travel way.
Two rules help or surprise a lot buyer. Paid capacity charges "shall become a part of the real property and shall remain with the real property when title is transferred to a new owner, as long as the base facility charge(s) continue to be paid," so a teardown whose house paid capacity keeps it if base charges stayed current. And "Any parcel capable of being provided service shall be assessed a minimum of 1.0 ERC" in an assessment area, so a vacant lot can carry a district lien before a house exists (both in the same document). Combining two lots after service was built gets no refund or credit for the eliminated parcel's prior payments.
If a sewer main abuts a Grove City lot, a new septic system is generally not an option, and the house connects to Englewood Water District before the certificate of occupancy. Where sewer is not available, Charlotte County requires an engineer-designed septic system and a permit, and a demolished house on septic needs an abandonment permit.
The statute treats sewer as available for a lot with flow of 1,000 gallons a day or less when a line "exists in a public easement or right-of-way that abuts the property line of the lot" (s. 381.0065, Florida Statutes). The county health department says new systems need plans signed and sealed by a Florida-registered engineer and a state application, and it does not review the application until the fee is paid (Florida Department of Health in Charlotte County, new septic system). It also requires an abandonment permit "whenever the use of an onsite sewage treatment and disposal system (OSTDS) is discontinued," including demolition, with the tank pumped, then crushed, filled or removed (Florida Department of Health in Charlotte County, septic tank abandonment). The 365-day connection rule and the 50-foot pre-1972 setback are in our rules section above.
A new Grove City home must have its lowest floor at or above the base flood elevation plus 1 foot under the Florida Building Code. On most Grove City flood maps that means roughly 9 to 11 feet in NAVD88. Enclosures below that floor are limited to parking, access and storage, and need flood openings.
The state's floodplain guidance says "The FBC requires new buildings, substantially improved buildings, and buildings that incur substantial damage to be elevated to or above the BFE plus 1 foot," and that backfilled stem walls are permitted in ordinary A and AE areas, but not in Coastal A Zones under the model amendment, where dwellings must be designed by registered design professionals (Florida Division of Emergency Management, FBC flood amendments guidance). Enclosures below the lowest floor are "allowed to be used solely for parking of vehicles, building access, or storage," and in V zones the walls must be breakaway (FEMA, Technical Bulletin 9).
On a base flood elevation of 8, 9 or 10 feet, the arithmetic gives a lowest floor at 9, 10 or 11 feet. Which Grove City lots are Coastal A or VE is a lot-by-lot lookup on the county's floodplain portal, and any freeboard above 1 foot is a county ordinance matter we did not find, so ask the county's Floodplain Coordinator at 941.743.1469 (Charlotte County, Flood Information). The county notes that elevations on the maps effective December 15, 2022 are in NAVD88, about 1.15 feet lower than the older NGVD29 datum, so an older elevation certificate must be compared on the same datum. A 400 square foot garage enclosure needs at least 400 square inches of net opening under FEMA's flood opening rule, in at least two openings no higher than 1 foot above grade.
Permit applications first submitted on or after December 31, 2026 fall under the new 9th edition (2026) Florida Building Code, according to the Florida Building Commission's workplan; the edition in effect on the application date governs. The coastal construction control line in Charlotte County runs along the Gulf barrier islands, not the Grove City mainland shore.
The October 2026 workplan lists the 9th edition effective date as 12/31/2026 (Florida Building Commission, October 2026 workplan), and a law firm alert dated November 10, 2026 says an application first submitted on or after that date must comply, that residential drawings must now show base flood and proposed lowest floor elevations, and that new corrosion rules reach fasteners "within 3,000 feet of a saltwater coastline" (Greenberg Traurig, new Florida Building Code edition). One city announced January 1, 2027 instead, so confirm Charlotte County's own cutoff before timing an application.
The rule for the Charlotte County coastal construction control line describes a General Permit Line recorded "January 29, 1985," and names no mainland Lemon Bay or Grove City shoreline (Rule 62B-34.190, Florida Administrative Code), so a Grove City lot is very likely landward of it; the Department's map tool settles it for a specific parcel. Whether any Grove City parcel sits inside the county's scrub-jay permit boundary is likewise settled only by the county's map layer, and we found no source placing Grove City inside it.
Fannie Mae's single-closing construction-to-permanent loan allows no single construction period over 12 months and no more than 18 months in total, with loan-to-value on the lesser of cost or the as-completed value. An elevated Grove City build that runs past 18 months does not fit that product.
The Selling Guide says for a purchase, loan-to-value uses the lesser of the purchase price (construction cost plus lot price) or the "as completed" appraised value; if the borrower already owns the lot, the loan is a limited cash-out refinance on the as-completed value; and a completion report is required at conversion (Fannie Mae Selling Guide B5-3.1-02). A buyer who already holds a Grove City lot, bought for cash or with a lot loan, uses it as equity. No agency program we found finances a vacant lot alone, so lot loans are products of local banks and credit unions with terms each lender sets; ask three of them. Our financing section later in this guide covers the wider loan picture.
A tax-deed lot can be cheap, but unpaid government and special district liens survive the deed, restrictions and covenants survive too, and the former owner has 4 years to challenge a tax deed. Check for county code liens, a water district assessment and the Grove City assessment before bidding.
A certificateholder may apply for a tax deed "at any time after 2 years have elapsed since April 1 of the year of issuance" (s. 197.502, Florida Statutes). A tax deed wipes out other interests, but "a lien of record held by a municipal or county governmental unit, special district, or community development district" not satisfied at disbursement of sale proceeds "shall survive the issuance of a tax deed" (s. 197.552), and "the restrictions and covenants shall survive and be enforceable" (s. 197.573). Four years after a tax deed issues, "no action shall be brought by the former owner" (s. 95.192), so many title insurers want a court judgment or the passage of that time; confirm with a title agent before you bid.
Top 1% Real Estate Agents Nationally Since 2008, and on a Grove City lot or teardown we check the zoning, the water district status, the flood lookup, the septic and sewer position and the title before you commit to a price. To walk a lot with that file in hand, book your Grove City buyer consultation, see our buying process or Call Marc at (239) 287-5873. Own a Grove City home or lot you plan to sell? See selling your Grove City home, start with your Grove City home valuation or Call Jesse direct at (239) 898-6072.
A Grove City buyer should order a licensed home inspection, a 4-point and wind mitigation report, a termite report and a permit and lien search, then add seawall, dock, septic, sewer-status, well or mobile home checks as the property requires. Book them inside the inspection period, because nearly every Grove City house is past the insurer's 20-year line.
Data updated: November 2026 (Charlotte County Property Appraiser roll dated November 5, 2026, year built of 591 single-family homes and qualified sales through September 9, 2026; Fla. Stat. 468.8311, 482.226, 515.29, 553.844 and 627.7011; Rule 15C-1.0104, F.A.C.; 24 CFR 3280; CPSC Publication 516; Citizens inspections page and 4-point form; FDACS form 13645; EPA lead, asbestos and mold pages; Englewood Water District plan and rules. All checked November 17, 2026.)
We tracked the year built of every single-family home on the county roll for Grove City: 1 from the 1940s, 67 from the 1950s, 183 from the 1960s, 201 from the 1970s, 62 from the 1980s, 35 from the 1990s, 21 from the 2000s, 12 from the 2010s and 9 from the 2020s, 591 in all (Charlotte County Property Appraiser). By our count, 452 of the 591 (about 76.5 percent) predate 1980, and 549 predate 2000. Of the 39 qualified improved sales in the 12 months to September 9, 2026, 29 were homes built before 1980. That age mix drives the inspection list: original panels, older plumbing, roofs replaced after the 2022 and 2024 storms and records that may not exist for a 1950s lot. For the neighborhood picture first, read our Grove City community guide.
It covers a limited visual look at the structure, electrical, HVAC, roof covering, plumbing, interior and exterior of a Grove City home, and the statute counts a manufactured home as a "home." It does not replace the insurer forms, the termite report, mold sampling, septic or seawall opinions, or permit research.
Florida defines home inspection services as "a limited visual examination of the following readily accessible installed systems and components of a home: the structure, electrical system, HVAC system, roof covering, plumbing system, interior components, exterior components, and site conditions that affect the structure" (Fla. Stat. 468.8311). The same section defines "home" to include a "manufactured or modular home," so the 136 mobile homes on the original Grove City plat fall inside the licensed-inspector rules. Everything else a Grove City buyer needs is a separate trade or form, which is why the sections below run one by one. For a 1950s to 1970s block home the base inspection is the starting point; for a canal home it does not rate the seawall or dock at all.
Almost all of them. Citizens requires a 4-point inspection for owner, dwelling and mobile home applications on properties more than 20 years old, and 549 of Grove City's 591 single-family homes were built before 2000. A licensed inspector, contractor or building code inspector checks the roof, electrical, plumbing and HVAC.
The Citizens inspections page asks that "any serious hazards or deficiencies" such as exposed wiring or active leaks be repaired before an application for coverage is submitted (Citizens Property Insurance, inspections). Its sample form (Insp4pt 03 25) records whether the panel is a breaker or a fuse type, the total amps, the presence of cloth wiring, active knob and tube wiring and branch circuit aluminum wiring, the pipe types (copper, PVC or CPVC, PEX, galvanized, cast iron, polybutylene, ABS), the water heater age and its relief valve, and the roof age and remaining useful life, with photos of each roof slope and the panel with its cover off (Citizens, 4-Point Inspection Form). Single-strand aluminum remediation must be documented by a licensed electrician. The form is "not a warranty," and agents may not submit applications for homes with systems not in good working order. Order it early in the inspection period and send it to the insurance agent before the period ends, because a failed line can stop a binder.
By age, permit date and remaining life. Citizens wants a roof certification when a shingle roof is older than 25 years or a tile, slate, concrete or metal roof is older than 50, and proof of full replacement when under five years of life remain. State law also limits insurers on roofs under 15 years old.
Under Fla. Stat. 627.7011(5)(b), an insurer may not refuse to issue or renew a homeowner's policy "solely because of the age of the roof" when the roof is less than 15 years old, and under (5)(c) it must allow an inspection before requiring replacement of an older roof and may not refuse for age alone if the inspection shows 5 or more years of useful life (Fla. Stat. 627.7011). Subsection (6)(b) excludes mobile home policies, so a Grove City mobile home buyer does not get that shield. The repair rule is separate: Fla. Stat. 553.844(5) says that when a roof built, repaired or replaced under the 2007 Florida Building Code or later has 25 percent or more repaired, only the repaired portion must meet the current code (Fla. Stat. 553.844). The 2007 edition took effect March 1, 2009 (J.S. Held), so the roof permit date on a Grove City block home tells you which rule applies. Many Grove City roofs were replaced after Ian in 2022 and Helene and Milton in 2024; ask for the permit and the final inspection date, and look for a second roof framed over an original metal roof on mobile homes.
Expect galvanized supply and cast iron drain lines in 1950s and 1960s houses, and ask about polybutylene in homes built or added to between 1978 and 1995. Citizens does not insure homes with polybutylene piping, and the 4-point form makes the inspector report the pipe type and whether the plumbing is original or re-piped.
NBC 6 reported that polybutylene pipes were "used heavily during new construction from 1978 to 1995" and that "like most others in the insurance industry, Citizens does not insure properties with polybutylene piping" (NBC 6 South Florida). For the older lines, we found no state or federal source that dates them, so treat the following as industry consensus, not data: galvanized supply was common in houses built before about 1970, and cast iron drains under the slab were standard in Florida block houses into the mid 1970s. With 250 Grove City homes from the 1950s and 1960s on the roll (67 plus 183, our addition), a sewer camera scope of the drain line is an optional extra that a plumber performs outside the licensed home inspection.
Aluminum branch wiring from 1965 to the mid 1970s and old fuse or breaker panels. A Grove City house built in the 1960s or 1970s may carry either, and 384 of the roll's homes were built in those two decades (183 plus 201, our addition). The 4-point form asks for panel type, amperage and wiring type.
CPSC Publication 516 reports that homes built before 1972 and wired with aluminum "are 55 times more likely to have one or more wire connections at outlets reach 'Fire Hazard Conditions' than homes wired with copper," says homes built before 1965 are unlikely to have aluminum branch wiring, and says cable installed between 1965 and the mid 1970s in new homes, additions and rewired circuits may contain it (CPSC, Aluminum Wiring). Trouble signs include hot cover plates, flickering lights, dead circuits and a burning-plastic smell, though failing connections seldom give easy warning. Recognized repairs are rewiring with copper, COPALUM crimp pigtails by trained electricians, or AlumiConn connectors. On panels, CPSC closed its 1983 investigation of Federal Pacific Stab-Lok breakers saying its data "does not establish that the circuit breakers pose a serious risk of injury to consumers," although testing showed breakers "fail certain UL calibration test requirements" (CPSC, 1983 release). Whether a carrier accepts a given panel is carrier practice, not a statute, so get the insurer's answer in writing inside the inspection period. A panel-change permit date is the evidence an underwriter looks for.
Yes for lead disclosure and for any planned demolition. Federal rules require a signed lead paint disclosure and a 10-day chance to test before a buyer is bound on most pre-1978 housing, and asbestos in older flooring, ceilings and cement board should be sampled before a remodel or a storm-damage gut, not disturbed.
EPA says the lead disclosure rule "applies to most pre-1978 private housing"; sellers and agents must provide the lead pamphlet, disclose known information, provide records and "provide homebuyers a 10-day period to conduct a paint inspection or risk assessment," which the parties may lengthen, shorten or waive in writing (EPA, real estate disclosure). The sale contract carries the lead warning statement under 40 CFR 745.113, and HUD's twin rule is 24 CFR 35.90. The 10-day lead window can run alongside the contract's inspection period. On asbestos, EPA's advice is that "if in doubt, treat the material as if it contains asbestos and leave it alone," with removal "done only by a trained and accredited asbestos professional" (EPA, asbestos). A standard home inspector does not test for it. With 452 of 591 Grove City houses built before 1980, most resales fall on the lead side of the line.
Only a narrow group. Problem drywall is a concern for houses built or remodeled from 2001 through 2009, and the county roll shows 21 Grove City single-family homes from the 2000s. Older homes are affected only if walls were rebuilt in that window, so the permit history, not the year built, is the better test.
CPSC's identification method starts with a visual check for blackened copper wiring or air conditioning evaporator coils in a home with drywall installed between 2001 and 2009, then looks for corroborating markers; its March 2011 update moved the end of the window to 2009. The CPSC page returned an access block when our researchers retried it on November 17, 2026, so we are relying on the November 14, 2026 reading of the CPSC problem drywall guide and suggest you confirm the window with your inspector. In Grove City, the likeliest cases are houses remodeled or repaired after the 2004 storm season. Ask the seller for the permit list showing when drywall work was done.
Yes, in practice. Lenders often ask for one, and a Grove City frame house, a wood-floored mobile home or a block home with wood trusses and fascia near damp canal edges has wood a termite can reach. Florida requires the state form for a real estate wood-destroying organism report.
FDACS form 13645 is the "Wood-Destroying Organisms Inspection Report" under Rule 5E-14.142; it states that it is based on what was visible and readily accessible and is "NOT a structural damage report," and its findings boxes separate no visible signs, live organisms, evidence and damage, with a section for obstructed areas such as a crawlspace (FDACS form 13645). Fla. Stat. 482.226 requires the licensee to post a notice of inspection next to the attic or crawl access, at least 3 by 5 inches and lasting at least 3 years, and to carry insurance or a bond of at least $500,000 aggregate and $250,000 per occurrence (Fla. Stat. 482.226). On a mobile home, the crawl-space box on the form matters. UF/IFAS says March through June is the most visible swarm period and that mud tubes between the ground and the structure can reveal early infestation (UF/IFAS, termite season). A February 2026 University of Florida report projects Asian subterranean termites in all 24 of the state's southernmost counties before 2040, though it does not name Charlotte County (UF News), so we treat it as a reason to inspect, not a local finding. Ask for any transferable termite bond.
Test when the inspector sees moisture, staining or signs of a past water event, using a separately licensed mold assessor. Grove City sits on Lemon Bay, where the 2024 surge put water into low houses and mobile homes, so a home dried late or closed up wet is the case to probe.
EPA's guidance is to dry water-damaged areas and items within 24 to 48 hours, to leave moldy areas of less than about 10 square feet to a homeowner, to avoid running an HVAC system known or suspected to be contaminated, and to call a professional after sewage or contaminated water (EPA, mold and moisture guide). The WDO form itself says its inspectors are not authorized to inspect for fungi other than wood-destroying fungi. The National Hurricane Center put Milton's surge at 6 to 9 feet above ground from Venice to Boca Grande (NHC, Milton report). Buyer-side signs, from our own reading of that guidance: fresh drywall only on the lower 2 to 4 feet of walls, new baseboards and flooring throughout, a musty smell after the air conditioning has been off, staining inside base cabinets, rusted outlet boxes low on a wall and a recently replaced air handler.
Ask three questions: is the house on Englewood Water District sewer, is it on septic with sewer available in the street, or is it on septic with no sewer yet. The answers decide whether you need a septic evaluation, face a connection notice, or inherit a grinder pump you must maintain.
The District serves unincorporated Englewood, Grove City and Manasota Key; its home page reports that "as of January 2019, 87% of water customers also receive sewer service," and its wastewater plan says there are "areas with septic within EWD, and other areas that have sewer available but are not connected to service" (Englewood Water District; EWD Wastewater Facilities Plan). No public source lists which Grove City streets are connected, so use the District's service availability form and public web map for the address. Once connected, the old septic system has to be abandoned and the District inspects that work; the owner pays for the lateral and for any grinder pump station. State law requires an owner to connect within 365 days after written notice that sewer is available. A notice already mailed to the seller passes the deadline and the bill to you, so ask for it in writing. Florida Realtors reports that certain properties on lots of one acre or less may need an enhanced nitrogen-reducing septic system at about $15,000 to $35,000 or more, and that a connection may be required instead (Florida Realtors, September 29, 2026). Most Grove City homes drink District water, so a drinking-water well on a listing is the exception: order a bacteria and nitrate test.
Grove City buyers face checks that a standard home inspection leaves out: a seawall, dock and lift report on Grove City Shores and Cove canal lots, a title, label and tie-down review on original-plat mobile homes, a county permit, code case and lien search, an elevation certificate lookup and a fresh survey on old plats.
Hire a marine contractor or engineer for the seawall and a separate dock and lift review, and pull the permit history. The home inspector does not rate either, and for Grove City Shores and Cove canal homes the seawall is the largest single repair exposure in the file.
Charlotte County requires a building permit with signed and sealed engineering for seawall installation or repair, and a county dock permit for a dock or addition over water; confirm current requirements with the county's building division before you rely on an older permit (Charlotte County, seawall permits; dock permits). Contractor sources list the usual checks: cap cracks, opened panel joints that leak sand, clogged weep holes, a wall leaning toward the canal, voids behind the wall and rust staining, with tie-back anchors left to an engineer. A dock inspection firm describes its scope as pilings, caps, wraps, decking, hardware, lift motors and cables, and GFCI protection, and prices an add-on to a home inspection at $50 to $100, or "a few hundred dollars" on its own (Waypoint Inspection). Ask the seller for the lift age, the cable and motor replacement dates after 2024 and the dock permit. A boundary survey shows whether the wall and dock sit on the platted line. Ask your insurance agent how a flood policy treats seawalls and docks, because that cost may fall entirely on the owner.
Check the HUD label and data plate, the tie-down count and spacing, the piers, the roof and any add-ons. Charlotte County is HUD Wind Zone III, anchors differ for homes made before and after July 13, 1994, and all 136 Grove City mobile homes sit on the original plat.
Rule 15C-1.0104 sets diagonal frame ties no farther apart than 5 feet 4 inches on center, at least four anchors and straps at the end of each section for longitudinal ties (16 per double-wide), and Type I anchors at 3,150 pounds working load for homes made before July 13, 1994 versus Type II at 4,000 pounds after (Rule 15C-1.0104, F.A.C.). The HUD certification label sits at the taillight end of each transportable section (24 CFR 3280.11); the data plate near the main electrical panel lists the date of manufacture and the roof and wind load zones (24 CFR 3280.5); and 24 CFR 3280.305 names Charlotte among the Wind Zone III counties (24 CFR 3280.305). The state highway agency says a licensed installer must perform installations, that straps and anchors showing corrosion should be replaced and that piers must be in contact with the frame (FLHSMV, mobile and manufactured home guidance). Also check the roof (original metal or a roof-over), skirting, soft floor decking, carport and Florida-room permits, and ask whether the unit was re-leveled and re-tied after the surge. Citizens' 4-point covers mobile homes too, and a FHA or VA lender may want an engineer's permanent foundation certification (see the mobile home section above).
Repairs done after Ian, Helene or Milton needed permits, and unpermitted work is the hidden cost most likely to surface at a Grove City resale. Ask whether water entered, how high, whether a claim was filed and whether permits show final inspections for 2022 to 2026.
Charlotte County's building department guidance says storm-related repairs are not exempt from permitting; confirm the details, including the drywall threshold that triggers a remodel permit, with the county before relying on any seller's account (Charlotte County, storm damage permitting). For a mobile home, ask whether the piers and anchors were reset after saturated soil shifted. The flood-damage disclosure the seller must give you under Fla. Stat. 689.302 is the natural starting point. The 50 percent rule, which can force elevation after a large repair, is covered in the flood section below.
Search the address in the county's online permit portal, then file a county lien research request for open code cases and code-lien payoffs. An open or expired permit is not a recorded lien, so title insurance will not catch it, and the duty to close it passes to the new owner.
The county's Accela Citizen Access portal gives online access to permits, licenses, plans review and code violations (Charlotte County, online services). Its code compliance research request covers open or expired permits, open building or zoning violations and lien payoffs, with a turnaround the county puts at about 7 to 10 days (confirm it with Code Compliance when you file), so file it on day one of the inspection period (Charlotte County, lien research requests). Contractor liens are recorded with the Clerk; the Clerk's recording site is the place to look for claims of lien filed after storm work (Charlotte County Clerk, official records). Last, read the tax bill for the Grove City street and drainage line and any delinquency.
Look the address up on the county's Forerunner floodplain platform, which shows the flood zone and base flood elevation and lets owners view and download certificates on file. Most Grove City houses predate the county's floodplain rules, so many have none, and a new certificate needs a surveyor.
Charlotte County launched the Forerunner platform in 2025 to show "FEMA flood zone designations and base flood elevations" and let owners "view and download existing elevation certificates" (Englewood Review, August 7, 2025). Since January 1, 2023, Fla. Stat. 472.0366 has required surveyors to submit a digital copy of every elevation certificate to the state within 30 days, searchable at the state's Elevation Certificate database. Read the flood zone and base flood elevation, the top of the bottom floor and the datum: older certificates may be in NGVD 1929 while the 2022 maps use NAVD88, so compare in one datum. On a mobile home, the certificate shows the bottom of the frame. The flood section below covers what a certificate can and cannot do.
Yes, if the house sits on the 1886 original plat or a canal lot, even though the standard contract makes a survey optional and a buyer expense. Old plats produce fences off the lot line, vacated streets, setback conflicts and docks or seawalls off the platted canal line.
Grove City was platted in 1886 and a Grove City post office operated between 1887 and 1910 (Florida GenWeb, Grove City); the Grove City Terrace, Shores and Cove plats followed later. Under the Florida Realtors and Florida Bar AS IS contract, a survey is the buyer's option and expense and is due at least 5 days before closing, and title insurance does not insure zoning, flood zone or permit status. Ask the title agent whether the owner's policy will remove the survey exception once a current survey is delivered. On a vacant lot or teardown, the survey plus flood elevation data drives what can be built.
Only if the home has a pool. Chapter 515 applies when a pool is built or a pool permit is pulled, not automatically at resale, and pool homes are a small share of Grove City because most lots are small and canal-side. Any new pool or pool remodel after you buy must meet the barrier rules.
Fla. Stat. 515.29 requires a barrier at least 4 feet high on the outside, gates that open outward and are self-closing and self-latching with the release on the pool side, no climbable structures against the barrier, and allows a dwelling wall to serve as part of the barrier only if it has no door or window opening to the pool (Fla. Stat. 515.29). A screen enclosure can serve as the barrier if it meets the section. Ask the seller for the pool permit and any barrier documents.
An inland block home needs the core set plus sewer or septic checks; a canal home adds seawall, dock and lift reviews; a mobile home adds tie-downs, label and data plate; a lot needs a survey, flood data and utility confirmation. The table lists what each inspection checks, who performs it and when it falls.
| Inspection | What it checks | Who performs it | When in the contract |
|---|---|---|---|
| Home inspection (Fla. Stat. 468.8311) | Structure, electrical, HVAC, roof covering, plumbing, interior, exterior and site conditions, visually | Florida-licensed home inspector | Early in the inspection period (AS IS default 15 days) |
| 4-point (Citizens) | Roof age and life, panel brand and amps, aluminum wiring, pipe types, water heater, HVAC; required over 20 years old, mobile homes included | Licensed inspector, contractor or building code inspector | Early; send to the insurance agent before the period ends |
| Wind mitigation (OIR-B1-1802) | Roof deck attachment, roof-to-wall connection, roof shape, secondary water barrier, opening protection | Qualified inspector | Same visit as the home inspection |
| Roof condition certification | Remaining useful life of soft roofs over 25 years and hard roofs over 50 | Licensed inspector or roofing contractor | Inspection period |
| WDO report (FDACS 13645) | Live termites, evidence, damage, prior treatment, inaccessible areas | Licensed pest control business | Inspection period; lenders often ask for it |
| Seawall inspection | Cap, joints, weep holes, lean, voids, tie-backs | Marine contractor or Florida engineer | Inspection period; book early |
| Dock and boat lift review | Pilings, caps, wraps, decking, lift motor and cables, GFCI | Marine contractor or inspector add-on | Inspection period |
| Septic evaluation and pump-out | Tank, baffles, drainfield, aerobic unit status, whether sewer is available | Registered septic contractor | Inspection period; Florida bars point-of-sale mandates, so the buyer orders it |
| EWD sewer and water status | Sewer connection, vacuum pit or grinder pump, availability letter | Buyer request to Englewood Water District | Before or at the start of the period |
| Drinking-water well test | Total coliform, E. coli, nitrate | Certified lab or county health department | Inspection period; lab turnaround |
| Sewer camera scope | Under-slab drain line condition | Licensed plumber | Inspection period (optional) |
| Mold assessment | Moisture and sampling after flooding | Licensed mold assessor | Inspection period, if signs appear |
| Lead paint inspection (pre-1978) | Lead paint and hazards | Certified lead inspector or risk assessor | The 10-day federal window, waivable in writing |
| Asbestos sampling | Floor tile, textured ceilings, cement board before remodel or demolition | Accredited asbestos inspector | Inspection period, if a remodel is planned |
| Mobile home tie-down and pier check | Anchors, straps, spacing, piers, HUD label, data plate, wind zone | Licensed installer or engineer | Inspection period; engineer letter early for FHA or VA |
| Permit, code case and lien search | Open or expired permits, storm permits, code cases, code liens | Buyer or agent; county research; title agent | Day one (the county puts its research at about 7 to 10 days; confirm when filing) |
| Elevation certificate review | Flood zone, base flood elevation, lowest floor, machinery height | Existing certificate or a licensed surveyor | Inspection period, to price flood cover |
| Boundary survey | Lot lines, encroachments, seawall location, easements | Florida-licensed surveyor and mapper | At least 5 days before closing (AS IS form) |
| Pool barrier check (Fla. Stat. 515.29) | 4-foot barrier, self-closing gate, no climbable objects | Home inspector or pool contractor | Inspection period, if there is a pool |
Sources: the statutes, forms and pages linked in this section; Florida Realtors and Florida Bar AS IS contract timing as read in our research. Inspection prices other than the dock add-on figure are not published by a state source, so we do not print them.
A canal buyer stacks more of these into the same window than an inland buyer, so a 15-day period can be tight; a longer inspection period is a negotiated term, and it is easier to write into the first offer than to ask for later.
Top 1% Real Estate Agents Nationally Since 2008. Our Grove City inspection plan starts the day the contract is signed: county permit history, lien research, the 4-point, the wind form and an insurer's first answer, so findings reach you with days left to negotiate or walk. To sequence inspections for a specific address, book a Grove City buyer consultation or Call Marc at (239) 287-5873. If selling your current home comes first, our Grove City seller guide shows what buyers' inspectors will check.
Probably, and it changes street by street. About 59 percent of county address points in the Grove City census area read FEMA Zone AE, 58 read Coastal A and about 38 percent read Zone X, mostly the shaded coastal kind. Citizens will also require flood cover on every wind policy starting January 1, 2027.
Data updated: November 2026 (2,322 Grove City county address points tested November 14, 2026 against the county's FEMA layer for the maps effective December 15, 2022; FEMA's October 1, 2026 CRS list; FEMA's Risk Rating 2.0 page, updated April 9, 2026; CRS Insight IN10835, September 11, 2026; Citizens 2026 approved rate changes by county, flood and inspection pages; Fla. Stat. 163.31795, 627.351, 627.701, 627.7011 and 215.5586; Florida DFS hurricane mitigation guide, July 2026; Florida OIR pages. All checked November 17, 2026.)
Flood and wind cover can shift a Grove City owner's monthly budget more than any other line once the contract is signed. The questions below follow the order in which a buyer meets them: the zone on the lender's determination, the flood policy, the rebuild rules that attach to the house, and finally the wind policy. Our Grove City community guide holds the full zone mapping, and our Grove City home valuation page shows how the same flood facts affect price.
Mostly Zone AE with a base flood elevation of 8 to 10 feet, plus a Coastal A strip and a large shaded Zone X block. Testing 2,322 county address points against the effective map, 1,373 read AE (59.1 percent), 58 read Coastal A, 890 read X (38.3 percent) and one read VE.
The AE points break down as 1,125 at 8 feet, 231 at 9 feet and 17 at 10 feet, in NAVD88 (Charlotte County GIS flood zone layer, tested November 14, 2026). Of the 890 Zone X points, almost all are the shaded 0.2 percent annual chance coastal zone, so "outside the flood zone" in Grove City means outside the lender-mandated Special Flood Hazard Area, not low risk. In our 24-address spot check, 10 read AE at 8 feet and 14 read shaded X, and the pattern did not follow distance from the water: a block two streets inland can be AE while a nearby block is X. Parcel counts for the Coastal A zone are smaller than point counts: 44 parcels sit inside it, 40 in Grove City Shores and 4 on the original plat. The effective maps date from December 15, 2022, and Grove City sits on FIRM panels 12015C0187G and 12015C0189G. For one address, use the FEMA Map Service Center by hand and the county's Forerunner platform.
Yes if the address is in a Special Flood Hazard Area (AE, Coastal A or VE) and the loan is federally backed or regulated. With about 59 percent of Grove City address points in AE plus Coastal A and VE points, most financed purchases carry a flood requirement; the shaded X blocks do not, unless the insurer or lender asks.
The Congressional Research Service summarizes the rule as flood insurance required "as a condition of any mortgage" in the Special Flood Hazard Area by federal agencies, lenders under federal supervision and the mortgage agencies Fannie Mae and Freddie Mac (CRS report R44593). FEMA says the maps still drive "mandatory purchase and floodplain management requirements" even though prices no longer use zones (FEMA, Risk Rating 2.0). Ask your lender for the flood determination early, since a canal purchase and an inland shaded X purchase can have very different monthly numbers.
FEMA's Risk Rating 2.0 prices each policy on flood frequency, several flood types, distance to water, elevation and rebuilding cost, not on zone, and most annual increases are capped at 18 percent. Charlotte County is a Community Rating System Class 5 community, which gives a 25 percent discount on NFIP policies.
FEMA says "existing statutory limits on rate increases require that most rates not increase more than 18% per year," and that the system "does not use flood zones to determine flood risk" (FEMA, Risk Rating 2.0). The statute behind the cap, 42 U.S.C. 4015(e), sets a faster 25 percent annual path for a residence that is not a primary residence, so a canal home bought as a second home can climb faster (Cornell LII, 42 U.S.C. 4015). On FEMA's October 1, 2026 list, the row reads "FL 120061 Charlotte County 10/1/1992 4/1/2023 5 25," meaning Class 5 and a 25 percent discount (FEMA, CRS eligible communities); the discount applies inside and outside the Special Flood Hazard Area. We did not find a sourced Charlotte County NFIP premium average, so we do not print one. Get a quote on the actual address.
Yes. An NFIP policy can be assigned to a buyer at sale, which keeps its rating path and avoids a new-policy waiting period. Timing matters now: the NFIP's authorization runs only to December 11, 2026, and no extension had surfaced by research time.
FEMA says policyholders can transfer a discount to a buyer by assigning the policy when ownership changes (FEMA, Risk Rating 2.0). Congressional Research Service reporting, updated September 11, 2026, says the NFIP "is currently authorized until December 11, 2026"; on a lapse, authority for new contracts expires, existing contracts continue to the end of their policy term, and in past lapses "borrowers were not able to obtain flood insurance to close, renew, or increase loans secured by property" in a flood hazard area (CRS Insight IN10835). The National Association of Realtors says a seller's policy can move to the buyer by substituting names and that private flood insurance is not affected (NAR, NFIP expiration FAQ). If you plan a canal purchase with a December or January closing, ask the seller for the NFIP declarations page in the first days of the inspection period and price a private policy as a backup. Cash buyers who want NFIP cover face the standard waiting period unless the seller's policy is assigned.
A certificate can lower an NFIP price, but only a LOMA or LOMR-F from FEMA removes the lender's requirement, and the lender may still ask for flood cover. Private flood is an option: Florida's insurance regulator lists dozens of private writers, and Citizens says flood is available through private carriers and the NFIP.
FEMA's form says a completed Elevation Certificate "does not expire, unless there is a physical change to the building," and "is not invalidated by the transfer of building ownership"; it also says that "only a LOMA or LOMR-F from the Federal Emergency Management Agency (FEMA) can amend the FIRM and remove the federal mandate" (FEMA, Elevation Certificate). The form's printed OMB date of June 30, 2026 has passed, and we did not confirm whether FEMA issued a newer edition, so ask the surveyor which form edition applies. Under Risk Rating 2.0 a certificate is no longer required to buy NFIP cover, but an owner may supply one to see whether it lowers the price. A high interior block may qualify for a LOMA backed by surveyed lowest adjacent grade. Florida OIR lists 57 primary and 6 excess private flood writers and cautions buyers to confirm exactly what a private policy covers (Florida OIR, flood insurance).
If repairs or improvements cost 50 percent or more of the building's market value, land excluded, in a flood zone, the building must meet current code, including elevation. On an old block house or cottage whose structure is worth little next to the lot, a large remodel or storm repair can cross that line quickly.
Florida defines substantial improvement as work that "equals or exceeds 50 percent of the market value of the structure" before the work started, or before damage occurred if the structure is being restored, and counts it from the first alteration of a wall, ceiling, floor or other structural part (Fla. Stat. 161.54). Since 2025, a local government in the NFIP "may not adopt or enforce an ordinance for substantial improvements or repairs to a structure which includes a cumulative substantial improvement period" (Fla. Stat. 163.31795), so a seller's remodels from years ago do not add up against your project. The county still decides substantial damage and substantial improvement, and its page describes the rule as applying to buildings in high-risk zones that do not meet current elevation code (Charlotte County, 50 percent rule); confirm how it would value your scope before the inspection period ends. The Florida Building Code requires new, substantially improved and substantially damaged buildings to be elevated to or above the base flood elevation plus 1 foot (FDEM, flood amendments guidance), so on a lot mapped AE 8 the arithmetic is a lowest floor at 9 feet NAVD88 (our calculation), and 10 or 11 feet on AE 9 and AE 10. A canal house below today's elevation is, for remodel planning, close to a lot purchase: price the elevated rebuild or keep the scope under the threshold. A flood policy's Increased Cost of Compliance coverage can help after a covered loss, so ask whether the policy carries it.
Wind and homeowners coverage on a Grove City home turns on who will write it, the home's age and roof, and its wind mitigation features. Citizens Property Insurance writes thousands of Charlotte County policies, and its eligibility rules, the January 1, 2027 flood requirement, roof age limits and hurricane deductibles all shape a Grove City quote.
Data updated: November 2026 (Citizens Property Insurance 2026 rates and rules; Florida Statutes; Florida Office of Insurance Regulation)
Citizens is the insurer of last resort and has limits. Citizens will not take a home whose dwelling replacement cost reaches $700,000, and an owner whose private quote is within 20 percent of the Citizens premium does not qualify. Charlotte County's 2026 Citizens averages are $2,887 for a homeowners policy and $2,810 for a mobile home.
Fla. Stat. 627.351 sets the $700,000 replacement-cost cap and the rule that a primary residence risk is not eligible unless the private premium "is more than 20 percent greater than the premium for comparable coverage from the corporation" (Fla. Stat. 627.351). Replacement cost, not price, decides the cap: most 1960s Grove City houses stay eligible on value, while an elevated new build on a canal lot can exceed it. The county rows of Citizens' 2026 approved rate table read: homeowners HO3 average $3,069 before and $2,887 after a 5.9 percent decrease; mobile home policies $2,821 before and $2,810 after a 0.4 percent decrease (2,115 policies); dwelling DP1 and DP3 $2,083; and wind-only HW2 $4,799 (Citizens, 2026 approved rate changes by county). Those are countywide averages across ages and zones, not Grove City quotes, and they exclude flood. The mobile home book was nearly flat, so a mobile home buyer should not expect the relief homeowners policies got. On mobile homes, the statute limits Citizens coverage on units built before 1994 to actual cash value rather than replacement cost.
Every Citizens policy with wind coverage must carry flood insurance by January 1, 2027, regardless of value. A Grove City address already in a Special Flood Hazard Area needs it at issuance; a Zone X address on Citizens will need it at the first renewal or new policy effective on or after that date.
Citizens' own page states that policyholders "must also have and maintain flood insurance coverage by January 1, 2027," lists the phase-in by dwelling value ($600,000 in 2024, $500,000 in 2025, $400,000 in 2026, then all policies), and sets the amount at "equal to or greater than your Citizens policy dwelling value," or the maximum available from the NFIP (Citizens, flood requirement). Policies that exclude windstorm and condominium unit-owner forms are exempt. The Citizens mobile home brochure says its policy "does not cover damage from rising water" and that flood is available through private carriers and the NFIP (Citizens, mobile home policies). The NFIP building limit is $250,000, so a canal home with a higher rebuilding cost needs excess or private flood to reach the Citizens target. Net effect: a buyer budgeting a Citizens policy should budget flood alongside it, in every zone.
They decide most of the wind discount. Form OIR-B1-1802 documents roof covering, deck attachment, roof-to-wall connection, roof shape, secondary water resistance and opening protection, and is valid up to five years. Homes built to the 2001 code or later get a minimum 68 percent discount on the windstorm portion; older homes earn credits feature by feature.
The form (Rev. 04/26, adopted by Rule 69O-170.0155) requires at least one photograph or document to validate each attribute marked (OIR-B1-1802). The July 2026 DFS consumer guide says the new form must be used for inspections on or after April 1, 2026, that earlier forms remain usable until their five years run out, that the discounts apply only to windstorm coverage, and that homes built to the 2001 code or later "are automatically eligible for a minimum 68% discount on the windstorm coverage of the premium" (Florida DFS, hurricane loss mitigation discounts). A 1960s Grove City block house cannot claim that automatic credit, but a hip roof, documented clips or straps, a sealed roof deck from a post-2022 reroof and rated openings each earn credit. Florida OIR's October 2026 data put the average admitted homeowners premium at $3,736 with wind and $2,124 without, so about $1,612, or 43 percent, is wind (our subtraction), which is where these credits act (Florida OIR, market overview). Ask the seller for any 1802 form dated within five years.
Florida insurers offer hurricane deductibles of $500, 2, 5 or 10 percent of the dwelling limit, applied once per calendar year. Citizens suspended binding statewide in 2024 when a watch or warning was issued for any part of Florida, so a Grove City closing in hurricane season can stall if the policy is not bound early.
Under Fla. Stat. 627.701, the hurricane deductible "shall apply on an annual basis to all covered hurricane losses that occur during the calendar year," and the declarations page must show the dollar amount (Fla. Stat. 627.701). On a house insured at $300,000 for the dwelling, our arithmetic gives $6,000 at 2 percent, $15,000 at 5 percent and $30,000 at 10 percent. Flood damage falls under the flood policy and its own deductible. Citizens applies hurricane deductibles when a watch or warning is posted for any part of Florida (Citizens, hurricane deductible infographic). In November 2024, with Rafael, Citizens "suspended binding on policies, statewide"; agents "may not bind applications for new coverage or policy changes for increased coverage," and the pause lifted by the next morning (Insurance Journal, November 6, 2024). We did not find a 2026 suspension tied to Charlotte County. Hurricane season runs June 1 to November 30, so bind wind and flood well before closing and keep the binder in the lender file. A suspension does not cancel cover already bound.
Only after homesteading, and only for site-built homes. The statute covers owner-occupied, site-built single-family homes with a homestead exemption; grants need an insured value of $700,000 or less, a home built before 2008 and a low or moderate income, with $2 of state money per $1 from the owner up to $10,000. Mobile homes are not eligible.
Fla. Stat. 215.5586 sets those terms; eligible work includes opening protection and roof improvements, and the 2026 amendments expire July 1, 2027 (Fla. Stat. 215.5586). The program's website returned a server error when our researchers opened it on November 17, 2026, and funding reports conflict, so whether applications are open in November 2026 is unconfirmed: check the program site before counting on a grant. Nearly all of Grove City's 591 single-family homes pass the age test, and a canal home with an insured value over $700,000 does not pass the value test.
An inland block home leans on the 4-point, roof permit and wind form; a canal home adds large flood limits, Coastal A rules and seawall and dock exposure the flood policy may not pay for; a mobile home adds tie-down compliance, actual cash value limits and an insurer that excludes rising water.
| Insurance item | Inland 1960s block home | Canal home (Shores or Cove) | Mobile home (original plat) |
|---|---|---|---|
| Flood zone | Varies by block: AE 8 or shaded X | AE 8 to 10; Coastal A concentrated in Shores | Verify by address |
| Lender flood mandate | Only if the address is AE | Likely, with a federally backed loan | Likely if AE and financed |
| Citizens flood rule (January 1, 2027) | Applies to every Citizens wind policy | Applies; NFIP building limit is $250,000 | Applies; Citizens mobile home policy excludes rising water |
| 4-point | Required over 20 years old | Required over 20 years old | Required for mobile home applications |
| Roof age shield (Fla. Stat. 627.7011) | Applies to roofs under 15 years, or 5 or more years of life left | Same | Does not apply to mobile home policies |
| Wind credits | Feature by feature on the 1802 form | Feature by feature; newer elevated homes may earn the 2001-code credit | Rated on tie-downs and age, not the 1802 form |
| Replacement cost | Usually well under the $700,000 Citizens cap | Elevated new builds can exceed it | Pre-1994 units on Citizens pay actual cash value |
| 50 percent rule | Low structure value can trigger elevation on a big remodel | Below-elevation house behaves like a lot | Replacement unit needs a permanent foundation at the required elevation |
| County average (Citizens, 2026) | $2,887 homeowners (all ages and zones) | Same average; real premium will differ | $2,810 mobile home |
Sources: Citizens, Fla. Stat. 627.7011, Fla. Stat. 627.351, FEMA manufactured home fact sheet. No regulator or insurer publishes a per-home premium comparison for these three types, so the table compares rules and county averages, not quotes.
For a mobile home, FEMA's fact sheet says the NFIP covers manufactured homes anchored to a permanent foundation, with up to $250,000 of building and $100,000 of contents coverage. A replacement unit in an AE zone must sit on a permanent reinforced foundation, and the county decides the existing-subdivision question; the mobile home section above covers the rules.
5 Star Award for Customer Satisfaction for 21 Straight Years. Only 5 out of 21k+ Licensees (Gulfshore Life Magazine). Before you commit to a Grove City address, we gather the seller's 4-point, wind form, roof permit and any flood declarations page, then request quotes while the contract still lets you cancel. Book a Grove City buyer consultation, read how we work with buyers on our buying page, or Call Marc at (239) 287-5873.
A Grove City purchase resets your assessed value to just value on the January 1 after closing, and the first bill in your name can be far higher than the seller's. The 2026 total millage on a Grove City parcel is 15.5683 mills, plus flat assessments of about $876 a year on an improved lot.
Data updated: November 2026 (Charlotte County Property Appraiser, 2026 final ad valorem rates dated October 2, 2026; Fla. Stat. 193.155, 193.1554, 196.011; Property Appraiser exemption and Amendment 3 pages; Florida Realtors, November 4, 2026; Englewood Area Fire Control District assessments page; Grove City FY27 MSBU budget and 2026 tax bills as read in our community guide. Medians from the Charlotte County Property Appraiser roll of November 5, 2026, 12 months to September 9, 2026. All checked November 17, 2026.)
Florida taxes property on its status on January 1. For a Grove City buyer that means two bills matter: the bill that arrives in November of the year you close, which is prorated at closing on the seller's value and exemptions, and the bill the following November, which reflects your price and your exemptions. Lenders usually set escrow on the higher future bill, so budget from the figures below, not from the seller's bill. All of the estimates use the 2026 certified millage held flat, because 2027 rates are not set.
On January 1 of the year after your closing. Fla. Stat. 193.155(3)(a) says homestead property "shall be assessed at just value as of January 1 of the year following a change of ownership," and the 10 percent non-homestead cap resets the same way. So the November bill after you close is the first at your own value.
The Property Appraiser's exemption page says the same: when ownership of a homestead changes, the assessed value returns to just value the next year (Charlotte County Property Appraiser, exemptions; Fla. Stat. 193.155). Just value after a sale is not the price: the roll's just value reflects an adjustment for costs of sale, so we show two cases below, one at 100 percent of price as a ceiling and one at 85 percent as an illustration only (the 85 percent is our assumption, not a published ratio). The Tax Collector's site lists an early-payment discount that starts at 4 percent for November and steps down a point a month to 1 percent for February, with taxes delinquent April 1; confirm the schedule with the Tax Collector (Charlotte County Tax Collector).
You must hold title and permanently live in the home on January 1, and file with the Property Appraiser by March 1. A buyer who closes in December and moves in can qualify for the next year; a buyer who closes in January waits a full year.
The Property Appraiser states the test as legal or equitable title and permanent residence "as of January 1" (Charlotte County Property Appraiser, exemptions), and Fla. Stat. 196.011(1)(a) requires the application "on or before March 1 of each year," with failure to apply constituting a waiver (Fla. Stat. 196.011). Subsection (9) gives a late-filing route within 25 days of the August notice for extenuating circumstances. Proof of residency includes voter registration or a Declaration of Domicile, a Florida driver's license and Florida vehicle registrations, and the office reports that applications can be made online and that supporting documents are not accepted after June 1. Timing example (our reading of the rules): a buyer who closes on a Grove City Terrace home on December 15, 2026 and moves in can file by March 1, 2027; one who closes January 5, 2027 cannot claim a 2027 homestead on that home. The same page says renting an entire dwelling that has a homestead exemption is abandonment, so a buyer planning seasonal rental of a canal home should not count on it. If you also buy the vacant lot next door, the office says adjoining parcels can be combined for tax roll purposes, extending Save Our Homes protection to the added lot.
On a homestead, the annual increase is limited to the lower of 3 percent or the change in inflation. A second home, rental or vacant platted residential lot has a 10 percent cap on non-school levies. Both reset after a sale. A buyer who previously held a Florida homestead can port part of the savings, up to $500,000.
Save Our Homes is in Fla. Stat. 193.155(1) (Fla. Stat. 193.155). The non-homestead cap in Fla. Stat. 193.1554 covers residential property of nine or fewer units, including vacant land "zoned and platted for residential use," applies to all levies other than school district levies, and resets "as of January 1 of the year following a change of ownership or control" (Fla. Stat. 193.1554). Portability in 193.155(8) is available if the buyer had a homestead "as of January 1 of any of the 3 immediately preceding years," capped at a $500,000 difference, and the Property Appraiser requires Form DR501T by March 1. Chapter 2026-239 amendments to 193.155 first apply to the 2027 roll. Homestead does not follow the house: it does not transfer when you move from one Florida homestead to another.
Florida voters approved Amendment 3 on November 3, 2026, on unofficial returns. It lifts the non-school homestead exemption to $150,000 for 2027 and $250,000 for 2028, cuts the non-school cap for second homes and rentals from 10 percent to 5 percent and leaves school taxes and flat fees unchanged. Certification was not seen as of November 17, 2026.
Florida Realtors reported on November 4, 2026 that the exemption rises to $150,000 in 2027 and $250,000 in 2028, with inflation adjustments from 2029, and that "school tax exemptions are unchanged"; homeowners who establish Florida residency by December 31, 2026 qualify for the expanded exemption, while later residents receive the existing exemption and "the larger benefit begins in their fifth year of homestead exemption, subject to federal constitutional requirements" (Florida Realtors, Amendment 3). The Property Appraiser's page still reads in the conditional, says changes would first show on 2027 bills and says the amendment "does not apply to 'Non-Ad Valorem' assessments or fees" (Charlotte County Property Appraiser, Amendment 3). A buyer relocating from out of state in 2027 should expect the existing exemption at first, not $150,000. County and special district millage for 2027 may also move, so the 2026 total is the only certified number. Our status line: approved by voters on unofficial returns; certification and implementing law pending as of November 17, 2026.
Grove City sits in Charlotte County taxing district 001, and the 2026 total is 15.5683 mills: 9.2963 on non-school levies and 6.2720 for schools. One mill equals $1 of tax for every $1,000 of taxable value. No city levy applies, since Grove City is unincorporated.
| Levy (2026 certified, Grove City district 001) | Mills | School or non-school |
|---|---|---|
| Charlotte County general fund | 6.1275 | Non-school |
| Law enforcement (unincorporated MSTU) | 2.3578 | Non-school |
| Greater Charlotte Street Lighting | 0.1907 | Non-school |
| Stump Pass Dredging | 0.1978 | Non-school |
| Environmentally Sensitive Lands (voter approved debt) | 0.2000 | Non-school |
| West Coast Inland Navigation District | 0.0394 | Non-school |
| Southwest Florida Water Management District | 0.1831 | Non-school |
| Public schools, required local effort | 3.0240 | School |
| Public schools, local board | 3.2480 | School |
| Total | 15.5683 |
Data updated: November 2026 (Charlotte County Property Appraiser, 2026 final ad valorem rates, page dated October 2, 2026; the district total matches the district 001 row of the Property Appraiser's rate chart as we carried it from our research on the sister seller page). Confirm the district on the parcel's own bill.
The split matters because school levies get only the first $25,000 homestead exemption, with no Save Our Homes or 10 percent cap, while the second exemption, the caps and any Amendment 3 increase apply to non-school levies only. Neither the water district nor the Englewood Area Fire Control District levies any millage on a Grove City bill (both show 0.0000); the fire district charges a flat assessment instead (Englewood Area Fire Control District, assessments). In 2026 a homestead gets $25,000 off every levy and an additional inflation-indexed $26,411 off non-school levies only, so $51,411 against non-school millage (Florida DOR, additional homestead exemption).
At 2026 rates, a $300,000 inland home would owe about $4,670 in ad valorem tax without a homestead, $4,036 with the 2026 homestead rules and $3,119 if Amendment 3 takes effect as voted, before about $876 in flat assessments. A $650,000 canal home would owe about $10,119 without a homestead.
| Case (just value assumed) | Price | Ad valorem, non-homestead | Ad valorem, homestead, 2026 rules | Ad valorem, homestead, Amendment 3 2027 rules | Flat assessments | Total, non-homestead | Total, homestead 2026 rules |
|---|---|---|---|---|---|---|---|
| Inland Grove City Terrace block home (100 percent of price) | $300,000 | $4,670.49 | $4,035.76 | $3,119.24 | $876.19 | $5,546.68 | $4,911.95 |
| Same home (85 percent of price, illustration) | $300,000 | $3,969.92 | $3,335.18 | $2,418.67 | $876.19 | $4,846.11 | $4,211.37 |
| Canal home in Shores or Cove (100 percent) | $650,000 | $10,119.40 | $9,484.66 | $8,568.15 | $881.34 | $11,000.74 | $10,366.00 |
| Same home (85 percent, illustration) | $650,000 | $8,601.49 | $7,966.75 | $7,050.24 | $881.34 | $9,482.83 | $8,848.09 |
Our arithmetic: non-homestead is just value times 15.5683 divided by 1,000; homestead is (just value minus $51,411) times 9.2963 divided by 1,000 plus (just value minus $25,000) times 6.2720 divided by 1,000; the Amendment 3 column swaps $150,000 for $51,411 and is pending implementation. The $300,000 figure is the 12-month single-family median we tracked (33 sales, September 10, 2025 to September 9, 2026); the $650,000 figure is an example canal price, not a measured median. Source for medians: Charlotte County Property Appraiser. Millage held at 2026 rates.
Because just value usually sits below the sale price, these estimates likely run high. The homestead saving on the 2026 rules is $634.73 a year at any value above $76,411, and the Amendment 3 saving is $1,551.24 a year at these rates (our arithmetic). Do not budget from the seller's bill: on one Shores homestead record card we read, the long-time owner paid $6,951.83 in ad valorem tax on an assessed value of $487,308, while the same home at its $960,003 just value with no exemption would owe $14,945.61 at 2026 rates (Charlotte County Property Appraiser record card, as read for our seller guide). A vacant Grove City lot owes 15.5683 mills on its just value plus the street and drainage assessment and the fire assessment for a vacant lot, and cannot carry a homestead until a home is occupied on a January 1.
Four flat lines ride on an improved Grove City bill: $220.00 for the street and drainage unit, $290.78 for the Englewood Area Fire District, $335.51 for the county sanitation unit and a stormwater charge of $17.53 to $35.05 on the bills we read. They total about $876 to $881 a year, and neither homestead nor Amendment 3 reduces them.
The street and drainage unit charges $220.00 per equivalent residential unit on improved and vacant lots; the county's FY27 proposed budget holds that rate against a current maximum of $222.52 (Charlotte County, Grove City FY27 budget). The Englewood Area Fire Control District charges $290.78 for a residence and $63.95 for a vacant lot for 2026 to 2027 (Englewood Area Fire Control District). West County stormwater is charged by acreage, at $103.10 per acre under a $125.00 maximum. Adding sanitation, street and drainage, fire and $29.90 of stormwater gives $876.19 a year ($73.02 a month) on an inland example; with $35.05 of stormwater on a canal example, $881.34 ($73.44 a month) (our arithmetic). The unit borrowed for a paving program, so the line is the same $220.00 for a $650,000 canal home and a mobile home. A vacant lot's flat lines are the $220.00 assessment and the $63.95 fire charge ($283.95) plus prorated stormwater, with no sanitation line read on a vacant lot bill.
#1 Team in Southwest Florida since 2012. We run a tax and assessment estimate on every Grove City address before an offer, using district 001 millage, your price and each flat line on the bill, so your escrow holds no surprise. Book a Grove City buyer consultation or Call Marc at (239) 287-5873. Own a home you plan to sell? Start with our Grove City home valuation or Call Jesse direct at (239) 898-6072.
On a $300,000 Grove City home with a $240,000 loan, the buyer's statutory and title lines come to $1,516.50 when the seller pays the owner's title policy, and $3,091.50 when the buyer does. Lender fees, prepaid interest, escrow deposits, inspections and insurance premiums are extra.
Data updated: November 2026 (Florida DOR documentary stamp tax page; Fla. Stat. 199.133 and 28.24; Rule 69O-186.003, F.A.C.; Charlotte County Clerk recording fees; Chicago Title, Real Estate Laws and Customs, Florida (08/26); Florida Realtors and Florida Bar AS IS contract; Englewood Water District Customer Rules effective October 1, 2026; IRS FIRPTA pages; FinCEN residential real estate rule page; CFPB closing disclosure page; FBI figures via NAR. Medians from the Charlotte County Property Appraiser roll of November 5, 2026. All checked November 17, 2026.)
Statute or rule sets most of a Grove City buyer's closing bill, so you can estimate it before making an offer. Four items vary: lender charges, prepaid insurance, escrow deposits and the owner's title policy, which turns on a contract checkbox. Federal rules require the lender to give you the Closing Disclosure three business days before your scheduled closing (CFPB, Closing Disclosure). The worked examples use the $300,000 single-family median we tracked (Charlotte County Property Appraiser) and a $650,000 canal example, each with 20 percent down.
On a $300,000 home with a 20 percent down payment, documentary stamps on the note and mortgage are $840.00 and intangible tax is $480.00, for $1,516.50 in government and title lines before an owner's policy. On a $650,000 canal home the same lines total $3,056.50. Deed stamps are customarily the seller's.
| Closing item | $300,000 inland home, $240,000 loan | $650,000 canal home, $520,000 loan | Rule |
|---|---|---|---|
| Documentary stamps on the note and mortgage ($0.35 per $100 of the loan) | $840.00 | $1,820.00 | Florida DOR |
| Intangible tax (2 mills, 0.2 percent of the loan) | $480.00 | $1,040.00 | Fla. Stat. 199.133 |
| Lender's title policy, simultaneous issue | $25.00 minimum | $25.00 minimum | Rule 69O-186.003 |
| Mortgage recording, example of 20 pages | $171.50 | $171.50 | Clerk: $10.00 first page, $8.50 each added page |
| Total, seller pays owner's policy | $1,516.50 | $3,056.50 | Our arithmetic |
| Owner's policy, if the contract assigns it to the buyer | $1,575.00 | $3,325.00 | Rule 69O-186.003 |
| Total, buyer also pays owner's policy | $3,091.50 | $6,381.50 | Our arithmetic |
Our arithmetic from the rules linked. Lender fees, prepaid interest, escrow deposits, inspections, survey and insurance premiums are excluded because no sourced figure applies to a specific buyer; no state source publishes a Charlotte County survey price. The $650,000 price is an example, not a measured median. Recording figures are the Clerk's total charge as we read it, and a document's page count changes the line.
Deed documentary stamps at 70 cents per $100 are $2,100 at $300,000 and $4,550 at $650,000 (our arithmetic); the standard contract makes them a seller cost (Florida DOR). The DOR page notes that all parties to the document are liable for the tax whoever agrees to pay it. A buyer using an FHA loan at $300,000 with 3.5 percent down and the 1.75 percent upfront premium financed would see a $294,566.25 loan, note stamps of $1,031.10 and intangible tax of $589.13; the upfront premium itself, $5,066.25, is financed, not paid in cash (our arithmetic from the HUD letter).
Whichever box the contract checks. Chicago Title lists Florida residential owner's policies as seller-paid except in Broward, Collier, Miami-Dade, Monroe and Sarasota counties, but the Florida Realtors and Florida Bar AS IS contract makes it a choice, and Grove City sits in Englewood 34224 on the Sarasota County line, so expect either box.
The promulgated owner's rate is $5.75 per $1,000 up to $100,000 and $5.00 per $1,000 from $100,000 to $1 million, with a $100 minimum, and it is the same at every Florida title agent (Rule 69O-186.003, F.A.C.). By our arithmetic from that rule: $1,575 at $300,000, $3,325 at $650,000, $4,035 at the $792,000 canal-plat 36-month median we tracked, $825 for a $150,000 mobile home on owned land and $517.50 for a $90,000 vacant lot (the last two are illustrations, not market figures). Paragraph 9(c) of the AS IS contract lets the seller or the buyer designate the closing agent and pay for the owner's policy; the buyer pays lender's policy premiums and endorsements (Chicago Title, Laws and Customs). One title firm says Englewood follows the Sarasota buyer-pays custom, so we price both ways and your closing agent confirms.
A cash buyer pays no note stamps, no intangible tax and no lender's title policy, so the statutory lines shrink to the owner's policy if assigned and recording of the deed. Grove City lots and mobile homes are harder to finance, so cash is common for them, which also puts the whole price in one wire.
Our arithmetic from the owner's-policy rule: $825 on a $150,000 owned-lot mobile home and $517.50 on a $90,000 lot, if the contract assigns the buyer the premium. A mobile home on a live state title also needs a title transfer through the Tax Collector's motor vehicle side in addition to the deed at the Clerk; confirm the steps with the Tax Collector before closing (Charlotte County Tax Collector, motor vehicles). The mobile home section above covers title retirement and the RP decal.
A buyer of a connected Grove City home pays a $50.00 new service application fee on the first bill; the District's rules list no residential deposit. A first-time connection on a vacant lot or a home moving off septic is far larger: $17,865.50 for one equivalent residential connection with a short tap, by our addition.
Under the District's rules effective October 1, 2026, fees and charges "run with the parcel," the District provides a special meter reading at sale, and the new owner pays the application fee (EWD Customer Rules and Regulations, October 1, 2026). Monthly charges: water base $29.37, wastewater base $42.75, water usage $3.50 per 1,000 gallons to 6,000, and wastewater usage $5.45 per 1,000 gallons, so 5,000 gallons of use costs $116.87 a month (our arithmetic). Capital capacity charges per connection are $3,062.00 for water plant capacity, $1,200.00 for water distribution, $5,170.00 for wastewater plant capacity, $5,817.00 for wastewater collection, $229.50 and $387.00 for the two growth-related charges, plus $2,000.00 for a short-tap meter, totaling $17,865.50. The rules say those charges become part of the real property once paid, so ask whether a parcel's capacity was already paid. Have the closing agent obtain a District final read and payoff so a seller's balance does not follow the parcel. Customer service is at (941) 474-3217.
The buyer is the withholding agent. Federal law requires withholding of 15 percent of the amount realized when a seller who is a foreign person for tax purposes sells U.S. real property, with exceptions: none if the buyer will live there and the price is $300,000 or less, and 10 percent for buyer-occupied homes up to $1,000,000.
Under 26 U.S.C. 1445, the buyer must "deduct and withhold a tax equal to 15 percent of the amount realized," except when the buyer acquires the property for a residence and "the amount realized for the property does not exceed $300,000"; for a buyer-occupied residence with an amount realized not over $1,000,000, the rate is 10 percent (26 U.S.C. 1445). The IRS says the buyer or a relative must have definite plans to live in the property at least 50 percent of the days it is used in each of the first two 12-month periods (IRS, exceptions from FIRPTA withholding); withheld amounts are remitted on Forms 8288 and 8288-A (IRS, FIRPTA withholding). A $300,000 purchase sits exactly on the exception line for a buyer who will live there; a canal home near the $792,000 canal median would fall in the 10 percent band if buyer-occupied and 15 percent otherwise, and the exception does not cover a vacant lot bought to hold. The AS IS contract makes charges for FIRPTA withholding and reporting a seller cost. Confirm the remittance deadline with the Form 8288 instructions or your closing agent.
Not while the court order stands. FinCEN says that on March 19, 2026 a federal court in Texas vacated the Residential Real Estate Rule, that the government has appealed, and that while the order remains in force reporting persons need not file real estate reports and are not liable for not filing.
The rule targeted non-financed transfers to entities and trusts, so it would have reached a cash purchase of a Grove City canal home or lot by an LLC (FinCEN, residential real estate rule). Law firm summaries we found, which we did not check against the dockets, mention an appeal to the Fifth Circuit and a Middle District of Florida decision going the other way, so the rule could return. A title agent may still ask for beneficial-owner information under its own policies. This is status as of November 17, 2026; the closing agent has the current answer.
Call the title office on a number you looked up yourself, never one from an email, and treat any last-minute change to wire instructions as a red flag. Cash purchases of Grove City lots and mobile homes often move the whole price in a single wire, so one fraudulent instruction can cost the entire deposit.
The FBI's Internet Crime Complaint Center figures, reported by the National Association of Realtors on April 13, 2026, show cyber criminals stole more than $275 million through real estate-related fraud from at least 12,368 victims in 2025 (NAR, online real estate fraud). The Florida Bar Journal advises using "an independently verified telephone number to securely authenticate wire instructions," and on discovering fraud, contacting the bank for a recall, asking the receiving bank to freeze funds, and reporting to the FBI (Florida Bar Journal). The AS IS contract requires the balance to close by wire or other collected funds.
McGreevy and Comisar and their Domain Realty Group team have sold over $2.5 Billion in Real Estate. We draft a Grove City closing estimate alongside your offer, built from the statutory rates and the contract box that assigns the owner's policy. Book a Grove City buyer consultation or Call Marc at (239) 287-5873. Still weighing Grove City against neighboring areas? Our Englewood buyer guide compares them.
At the $300,000 single-family median, with 20 percent down at 7.11 percent, a Grove City home runs about $2,317 a month before flood cover and utilities; a $650,000 canal example runs about $4,655. Principal and interest alone at the $289,000 all-improved median ranges from $1,555 to $1,876 depending on the down payment.
Data updated: November 2026 (Freddie Mac Primary Mortgage Market Survey, week of November 12, 2026; Charlotte County Property Appraiser roll dated November 5, 2026, qualified sales September 10, 2025 to September 9, 2026; 2026 certified millage; Citizens 2026 approved rate changes for Charlotte County; Englewood Area Fire Control District and Englewood Water District 2026 to 2027 rates. All checked November 17, 2026.)
A mortgage payment is only part of what a Grove City owner pays each month. Taxes, insurance, the flat assessments and water and sewer all sit on top, and on a canal home the flood premium can rival any of them. The tables below separate what we can source from what we cannot, so you can swap in your own quotes. Each payment below applies the 30-year Freddie Mac average, 7.11 percent for the week ending November 12, 2026 (Freddie Mac, PMMS), a rate that describes conventional conforming loans, not FHA, VA, manufactured home or lot loans.
On the $289,000 median of all 39 qualified improved sales we tracked in the 12 months to September 9, 2026, principal and interest runs $1,876 a month with 3.5 percent down, $1,847 with 5 percent, $1,750 with 10 percent and $1,555 with 20 percent, at 7.11 percent.
| Down payment | Dollars down | Loan amount | Principal and interest per month |
|---|---|---|---|
| 3.5 percent | $10,115 | $278,885 | $1,876 |
| 5 percent | $14,450 | $274,550 | $1,847 |
| 10 percent | $28,900 | $260,100 | $1,750 |
| 20 percent | $57,800 | $231,200 | $1,555 |
Data updated: November 2026 (Charlotte County Property Appraiser roll of November 5, 2026, all improved qualified sales over $50,000, 39 sales, median $289,000; Freddie Mac PMMS, 7.11 percent, 30-year fixed). Principal and interest only: no tax, insurance, flood, mortgage insurance or assessments. The group includes single-family homes, mobile homes and a few other uses.
The $289,000 median covers all improved uses; the 33 single-family sales alone had a $300,000 median, so a buyer of a typical block home should use the builds below. Mobile homes are a small group within the 39: 4 sales in the 12 months and 9 in 36 months, with a $150,000 median for the 36 months, too few to treat as a trend.
At 20 percent down and 7.11 percent, the total before flood, mortgage insurance and utilities is $2,317.30 on a $300,000 inland home and $4,655.37 on a $650,000 canal home. The difference is mostly loan size and property tax; insurance, the street and drainage line and the fire line are the same on both.
| Monthly line | $300,000 inland home (Terrace type) | $650,000 canal home (Shores or Cove type) | Input |
|---|---|---|---|
| Loan amount | $240,000 | $520,000 | 80 percent of price |
| Principal and interest | $1,614.50 | $3,498.07 | 7.11 percent, 360 months |
| Property tax, non-homestead | $389.21 | $843.28 | 15.5683 mills on price |
| Homeowners insurance | $240.58 | $240.58 | Citizens HO3 Charlotte average, $2,887 a year |
| Street and drainage unit | $18.33 | $18.33 | $220.00 a year |
| Fire assessment | $24.23 | $24.23 | $290.78 a year |
| Solid waste and stormwater | $30.45 | $30.88 | $335.51 plus $29.90 or $35.05 a year |
| Total before flood, mortgage insurance and utilities | $2,317.30 | $4,655.37 | Our arithmetic |
| Same, with a 2026-rule homestead | $2,264.41 | $4,602.49 | Tax $336.31 and $790.39 |
| Same, with Amendment 3 2027 rules (pending) | $2,188.03 | $4,526.11 | Tax $259.94 and $714.01 |
| Flood, per $1,000 of annual premium | add $83.33 | add $83.33 | Sensitivity only |
| Water and sewer, 5,000 gallons | add $116.87 | add $116.87 | EWD rules |
Our arithmetic (line items sum to $2,317.30 and $4,655.37; computed without rounding each line, the totals are $2,317.30 and $4,655.38, and the homestead and Amendment 3 rows are computed that way). Sources: Freddie Mac; Charlotte County Property Appraiser rates; Citizens, 2026 approved rate changes; Englewood Area Fire Control District; EWD rules. The $650,000 price is an example, not a measured median. The Citizens figure is a countywide average that excludes flood and is not a quote for either home.
A $650,000 canal house sits in AE, carries a higher replacement cost and is near the $700,000 Citizens dwelling cap, so its real insurance premium will differ from the average used here. Flood is left as a per-$1,000 line because we found no sourced Charlotte County flood premium: multiply your quoted annual premium in thousands by $83.33 to see the monthly effect. Private mortgage insurance is left out because we have no sourced rate for it. A 15-year loan at the 6.45 percent PMMS rate carries principal and interest of $2,084.07 on $240,000 and $4,515.48 on $520,000, and 10 percent down at 7.11 percent gives $1,816.31 on $270,000 and $3,935.33 on $585,000, before mortgage insurance.
A one-point drop in rate saves about $153 a month on the $289,000 median with 20 percent down. On a $240,000 loan, the 30-year principal and interest is $1,436 at the 2026 low of 5.98 percent, $1,614 at 7.11 percent and $1,662 at the 2026 high of 7.40 percent.
Across 2026 the 30-year rate began at 6.16 percent in the January 8 survey, bottomed at 5.98 percent on February 26, peaked at 7.40 percent in the October 8 and October 15 surveys and has since eased to 7.11 percent (Freddie Mac, PMMS history). The difference between the low and the November rate is $178.66 a month on $240,000 (our arithmetic). On a $633,600 loan, 80 percent of the $792,000 canal-plat 36-month median we tracked, principal and interest is $3,791 at 5.98 percent, $4,262 at 7.11 percent and $4,387 at 7.40 percent. A one-point drop to 6.11 percent would cut principal and interest at the $289,000 median with 20 percent down from $1,555 to $1,403, saving $153 a month. As a rule of thumb, every $100,000 borrowed costs about $673 a month at 7.11 percent on a 30-year loan, and $868 a month on a 15-year loan at 6.45 percent.
On a $300,000 Grove City home, our FHA build with 3.5 percent down comes to about $2,817.07 a month and our VA build with nothing down to about $2,764.32, both including tax, insurance and the flat assessments. Mortgage insurance on FHA and the funding fee on VA are the main additions.
For FHA, the base loan is $289,500; with the 1.75 percent upfront premium financed, the loan is $294,566.25 and principal and interest is $1,981.57, plus annual mortgage insurance of about $132.69 a month at 55 basis points, $389.21 of tax, $240.58 of insurance and $73.02 of assessments (our arithmetic from the HUD Mortgagee Letter 2023-05). For VA, a first-use funding fee of 2.15 percent financed gives a $306,450 loan and principal and interest of $2,061.51, plus the same tax, insurance and assessments (VA, funding fee). Flood cover and water and sewer come on top, and in a flood zone both loan types require it.
McGreevy and Comisar alone have over $900 million in Sales. Send us a Grove City address and we replace these averages with its own tax estimate, assessments and insurance quotes. Book a Grove City buyer consultation or Call Marc at (239) 287-5873.
A Grove City purchase can be financed with a conventional, FHA or VA loan, or paid in cash. The Freddie Mac 30-year rate was 7.11 percent in the week of November 12, 2026, the conforming limit in Charlotte County is $832,750, and USDA checks on three Grove City addresses came back ineligible. Mobile homes and lots finance differently.
Data updated: November 2026 (Freddie Mac PMMS and weekly history; FHFA 2026 conforming loan limits; HUD release 25-145 and Mortgagee Letter 2023-05; VA funding fee page, last updated October 5, 2026; USDA eligibility site checks of November 17, 2026; Florida Housing Finance Corporation program pages; Florida Realtors, June 30, 2026. All checked November 17, 2026.)
Rates and programs change weekly, so treat the figures below as a snapshot and ask a lender for a written estimate on your own file. The next Freddie Mac release is due November 19, 2026. Choose the loan before you choose the house type: a canal purchase near $650,000 and a $150,000 mobile home on an owned lot sit in different parts of the lending market.
The 30-year fixed rate was 7.11 percent and the 15-year was 6.45 percent in the week of November 12, 2026, down from 7.40 percent and 6.73 percent in early October. A year earlier, in the week of November 13, 2025, they were 6.24 percent and 5.49 percent.
| Week (2026) | 30-year fixed | 15-year fixed |
|---|---|---|
| October 1 | 7.28 | 6.60 |
| October 8 | 7.40 | 6.73 |
| October 15 | 7.40 | 6.71 |
| October 22 | 7.32 | 6.68 |
| October 29 | 7.24 | 6.60 |
| November 5 | 7.18 | 6.57 |
| November 12 | 7.11 | 6.45 |
Source: Freddie Mac, weekly history file and PMMS page. The survey describes "good/excellent credit, 20% loans, home purchase loans on owner occupied 1-unit single-family properties"; its 2026 range for the 30-year is 5.98 to 7.40 percent. FHA, VA, second-home, investor, manufactured home and lot loans price differently.
The rate climbed from the February 26 low to the October highs, though not in a straight line (6.46 percent on April 2, then 6.37 percent on May 7), and then eased for four straight weeks, according to the PMMS history. Florida Realtors' chief economist said of September and the third quarter that "higher mortgage rates are weighing on sales, particularly in the single-family market" (Florida Realtors).
The 2026 conforming limit for a one-unit home in Charlotte County is $832,750. A $650,000 canal home with 20 percent down needs a $520,000 loan, well inside it, and so does a canal home at the $792,000 median with 10 percent down ($712,800). FHA's floor limit for 2026 is $541,287, and Charlotte's own row could not be confirmed.
FHFA's 2026 county list puts Charlotte County (FIPS 12-015) at $832,750 for one unit, $1,066,250 for two, $1,288,800 for three and $1,601,750 for four (FHFA, 2026 county loan limits; FHFA release). By our arithmetic, a Grove City purchase above about $925,000 with 10 percent down would exceed the conforming limit and need a jumbo loan. HUD's 2026 FHA one-unit floor is $541,287 and its ceiling is $1,249,125 for case numbers assigned on or after January 1, 2026 (HUD release 25-145). We could not retrieve HUD's Charlotte row by script, so treat the floor as the best-supported figure and confirm with the lender. If the floor applies, a $650,000 canal home would need at least $108,713 down (650,000 minus 541,287), about 16.7 percent, to use FHA. No 2027 limits had been announced as of November 17, 2026; FHFA usually announces in late November.
FHA lets a buyer put down 3.5 percent and finances a 1.75 percent upfront premium, with an annual premium of 55 basis points for the life of a loan at 96.5 percent loan-to-value. VA has no down payment but charges a funding fee of 1.25 to 3.3 percent unless exempt, and caps seller concessions at 4 percent.
HUD Mortgagee Letter 2023-05 sets upfront mortgage insurance at 1.75 percent of the base loan and annual premiums of 50 basis points for loans at or under 95 percent loan-to-value and 55 basis points above 95 percent, for terms over 15 years at or below the base loan threshold (HUD Mortgagee Letter 2023-05). For VA purchase loans, the first-use funding fee is 2.15 percent with under 5 percent down, 1.5 percent with 5 percent or more and 1.25 percent with 10 percent or more; after first use with under 5 percent down it is 3.3 percent; veterans receiving VA compensation for a service-connected disability and certain others are exempt; seller concessions are capped at 4 percent of reasonable value, and only the funding fee may be financed on a purchase (VA, funding fee and closing costs). Both agencies require flood insurance on a home in a Special Flood Hazard Area, which covers most Grove City addresses. For a mobile home, FHA and VA lenders may ask for an engineer's permanent foundation certification, covered in the mobile home section above.
Check the specific address. On November 17, 2026, we ran three single-address checks on the USDA eligibility site, one for an inland Grove City Terrace home, one for a Shores canal home and one for an original-plat mobile home lot, all in ZIP 34224, and all three returned "InEligible." We do not say that no Grove City address can qualify.
The site checks two things, household income and whether the property is in an eligible rural area (USDA, eligibility site). Because the results came from three addresses on today's map, a buyer should confirm a specific address there before relying on or dismissing the program. We do not print the test addresses.
Florida Housing offers first mortgages with a 640 minimum credit score, FL Assist up to $10,000 as a deferred second mortgage, a $12,500 FL HLP second mortgage at 3 percent, and Hometown Heroes up to 5 percent of the loan, between $10,000 and $35,000, for eligible occupations. Check availability first.
On Florida Housing's overview page, FL Assist is a 0 percent, non-amortizing, deferred second mortgage repaid on sale, transfer, refinance or end of occupancy; FL HLP carries a 3 percent fully amortizing 30-year term; and the HFA Preferred and HFA Advantage second mortgages of 3, 4 or 5 percent are forgiven at 20 percent a year over five years (Florida Housing, homebuyer programs). First-time buyer status follows the IRS definition: no ownership and occupancy of a primary residence in the last three years. Hometown Heroes is a 0 percent, non-amortizing, 30-year deferred second mortgage, not forgivable, for first-time, income-qualified buyers in listed occupations, with FHA, VA, rural development and conventional first mortgages (Florida Housing, Hometown Heroes). Florida Housing reported that it had committed all available funding for the 2025 to 2026 fiscal year, after the program opened on August 18, 2025 with $50 million (Florida Housing, 2026 press releases), and Florida Realtors reported $50 million in the 2026 to 2027 state budget (Florida Realtors, June 30, 2026). The remaining balance as of November 17, 2026 is unconfirmed, and Charlotte County's income limit could not be read, so ask a participating lender whether funds are open before you write an offer. Price and income caps, not only funding, decide whether a $650,000 canal home qualifies.
Possibly. County pages describe purchase assistance for down payment, closing costs and gap funding, with a lifetime combined maximum of $75,000, a residency or employment test and applications through a lender in the county's consortium, subject to fund availability. We could not confirm award amounts or income limits, so call the county's housing office.
Our sources are the county's purchase assistance FAQ and housing page, which we could not open directly on November 17, 2026 (Charlotte County, purchase assistance FAQ); confirm every term with the county. State SHIP funding for 2026 to 2027 is $165.7 million statewide, per Florida Realtors. Separately, Englewood Water District's connection-hardship rule refers owners facing hardship from a mandatory connection to the county's SHIP program.
Not with the figures on this page. Lot loans and manufactured home loans are priced differently from the Freddie Mac survey, and the Citizens homeowners average does not apply to a mobile home. The mobile home and lot sections above explain FHA Title I, Fannie Mae rules, chattel loans and construction-to-permanent options.
The Citizens mobile home average for Charlotte County is $2,810 a year, not the $2,887 homeowners figure (Citizens, 2026 approved rate changes). We tracked 4 mobile home sales in the 12 months and 9 in 36 months, a small group with a $150,000 median over 36 months, so treat any price figure as a rough guide. Cash purchases are likely common for these and for lots, though we did not measure it. For a lot or teardown, price the sewer and capacity charges in the closing section before you set a budget.
A cash buyer skips the lender's flood mandate and loan costs, but not the insurer's rules. Citizens still asks for a 4-point on older homes and flood cover from January 1, 2027, a canal home still benefits from flood cover, and a seller's NFIP policy assignment avoids the waiting period for new cover.
A cash offer skips note stamps, intangible tax and the lender's title policy, as the closing section shows. It does not remove the permit and lien search, the survey or the inspections. Keep an inspection period in the contract anyway, and use the budget builds above with the loan lines removed. The whole price moves in one wire, so follow the wire steps in the closing section.
Platinum Sales Production Award Winners. We lay a conventional loan quote, an FHA or VA option and a cash offer next to each other for one Grove City address. Book a Grove City buyer consultation, read how we work with buyers on our buying page, or Call Marc at (239) 287-5873. Selling first? A number on your current home starts with our Grove City home valuation or the Grove City seller guide, or Call Jesse direct at (239) 898-6072.
Grove City is an unincorporated Census Designated Place on Placida Road (County Road 775) in western Charlotte County, with Englewood 34224 mailing addresses. Measured from a central point on Placida Road, HCA Florida Englewood Hospital is about 3.9 road miles and 8 minutes away, and Englewood Beach is about 5.0 miles and 10 minutes.
Data updated: November 2026 (drive figures from one table request to the public OSRM routing service on November 17, 2026, free-flow car times with no traffic, from a central Grove City point on Placida Road taken from the Charlotte County GIS address layer; airport figures from the sources linked below; hospital details from HCA Florida Healthcare)
We measured every trip from one point in the middle of the Grove City plats and rounded to a tenth of a mile and the minute, because a canal home in Grove City Shores and a block home in Grove City Terrace start a few minutes apart. The minutes are the shortest a trip takes on open roads. In January through April, Placida Road and SR 776 run slower, so test the drive at the hour you would actually make it. Our Grove City community guide covers the history and daily life that this buyer page leaves out.
| Destination from central Grove City | Road miles | Free-flow minutes | Note |
|---|---|---|---|
| Ainger Creek Park boat ramp (approximate point) | 2.5 | 5 | North on CR 775; rebuild pending, see below |
| Rotonda West (inside the circle, approximate) | 3.8 | 9 | Neighboring place with an association |
| HCA Florida Englewood Hospital | 3.9 | 8 | Nearest full hospital and emergency room |
| Englewood Beach at Chadwick Park | 5.0 | 10 | Over the Tom Adams Bridge |
| Old downtown Englewood, W Dearborn St | 5.3 | 10 | Sarasota County side |
| Stump Pass Beach State Park (south end of Gulf Blvd, approximate) | 5.9 | 14 | Route runs onto Manasota Key |
| Placida, near Placida Park and the causeway (approximate) | 6.8 | 13 | Public ramp with three paved lanes |
| Lemon Bay Park, Sarasota County (approximate) | 12.5 | 23 | Snapped to a nearby road |
| Boca Grande village (approximate) | 12.5 | 25 | Island-bound causeway toll |
| Venice City Hall | 16.6 | 31 | Sarasota County |
| Port Charlotte, county administration center | 18.0 | 27 | County seat services |
| Punta Gorda City Hall | 25.6 | 40 | Charlotte County |
| Punta Gorda Airport (PGD) | 29.7 | 50 | Closest commercial airport |
| Sarasota Bradenton International (SRQ) | 44.4 | 67 | |
| Downtown Fort Myers (approximate) | 49.2 | 75 | |
| Southwest Florida International (RSW) | 68.7 | 87 | |
| Downtown Tampa (approximate) | 89.2 | 111 | I-75 north |
Everyday errands sit inside about 5 road miles of a Grove City address, and the county seat, the interstate and Punta Gorda Airport sit 16 to 30 road miles away. Boaters in Grove City Shores and Grove City Cove reach Lemon Bay by water from their own canals instead of by road. If you are weighing the surrounding town as well, our Englewood buyer's guide covers both sides of the county line.
From a central Grove City point, Englewood Beach is about 5.0 road miles and 10 minutes, Stump Pass Beach State Park about 5.9 miles and 14 minutes, Boca Grande about 12.5 miles and 25 minutes, and Venice City Hall about 16.6 miles and 31 minutes, all as free-flow routing estimates.
Stump Pass is only about 1.5 miles away straight across Lemon Bay, but the road route crosses to Manasota Key and runs south on Gulf Blvd. Boca Grande lies in Lee County on Gasparilla Island and is reached through Charlotte County over a causeway that the Gasparilla Island Bridge Authority operates; our research recorded the toll as collected island bound, so confirm the direction and current rate with the authority before you budget for regular trips. The Lemon Bay waters between Grove City and the Gulf are a slow speed zone outside the Intracoastal Waterway channel and the marked Stump Pass channel under Rule 68C-22.015, which is why a boat owner's trip to the Gulf takes longer than the map distance suggests.
Punta Gorda Airport is the closest, about 29.7 road miles and 50 minutes from central Grove City, and it finished 2025 with a record 2,282,002 passengers. Sarasota Bradenton International is about 44.4 miles and 67 minutes away, and Southwest Florida International about 68.7 miles and 87 minutes.
The Business Observer reported that Punta Gorda's 2025 total was up 18.5 percent from 1,925,128 in 2024, with Allegiant flying nonstop to more than 50 destinations and Sun Country serving Minneapolis seasonally. Sarasota Bradenton's 2025 release counted 4,514,781 passengers, up 6.34 percent from 4,245,686. Punta Gorda is a low-cost-carrier airport, so a buyer who flies often should compare the airlines serving each airport before deciding whether the shorter drive wins.
HCA Florida Englewood Hospital is closest to Grove City, about 3.9 road miles and 8 minutes from a central point on Placida Road. The hospital describes itself as a "100-bed acute care hospital" with "24/7 emergency care," so a Grove City address has a full emergency room inside a short drive.
Hospitals in Port Charlotte sit about 18 road miles east of Grove City, which matters mainly for specialty care. Read the hospital's own Englewood location page for its current services, because those change faster than a buyer's guide can.
The nearest public boat ramp is Ainger Creek Park, about 2.5 road miles north on Placida Road, and Placida Park, about 6.8 road miles away, has three paved lanes. Ainger Creek is slated for a rebuild, so a trailer boater should confirm the ramp's status with the county before relying on it.
The Florida Fish and Wildlife Conservation Commission lists Ainger Creek as one paved lane with a ramp fee and hourly parking, from a survey dated August 2011, and Placida Park as three paved lanes with no ramp fee but paid parking from 6 a.m. to 10 p.m. Indian Mound Park in Sarasota County is a third option on the state's Charlotte Harbor ramp list. As of the county project page our research read on November 14, 2026, the Ainger Creek rebuild was going to the Board of County Commissioners for a budget adjustment on November 24, 2026 after bids came in high, with park amenities closed during construction in 2027. Check the county page or call Charlotte County Community Services at 941-681-3742 for the outcome. A canal home with its own dock launches from home, subject to the canal depth and dock condition covered in our canal questions elsewhere on this page.
Placida Road is County Road 775, a county road that runs through Grove City and links it north to SR 776 and south toward Placida and the Boca Grande causeway. A buyer comparing commutes should check the county's current project pages, because bridge work on this road changes lane availability.
Charlotte County lists a Hurricane Ian repair of the Oyster Creek Bridge at the north end of Grove City, and the Tom Adams Bridge to Englewood Beach also has structural repairs on the county's project list. We found no project to widen Placida Road through Grove City. Confirm the status of each bridge with the county before you plan a daily route, and read the county's roadway concurrency report if traffic counts on CR 775 matter to your decision.
Grove City addresses fall in Charlotte County evacuation Zone A or Zone B, not in the three inland zones, as the county's address layer read on November 14, 2026, and the zone is not the same thing as a FEMA flood zone. Look up the exact address on the county's Know Your Zone page before you offer.
An evacuation zone comes from storm surge risk, elevation and evacuation routes, while a flood zone sets lender and insurance rules, so a Grove City address can be in one and not the other. The county explains the zones on its Know Your Zone page, which also tells residents to plan to leave rather than count on a shelter. Ask the county's Emergency Management office whether its guidance for a mobile home differs from the zone shown for the lot, and put both the evacuation zone and the flood zone in your file for each home you tour.
For the Grove City addresses we tested on November 14, 2026, the Charlotte County school district's boundary locator returned Vineland Elementary, L. A. Ainger Middle School and Lemon Bay High School. School zoning follows the exact address, so enter yours in the locator and call the school to confirm.
Data updated: November 2026 (zoning from the Charlotte County Public Schools boundary locator as run on November 14, 2026; seats and choice status from the district's controlled open enrollment chart for 2026-27, capacities updated November 2, 2026; state rule from s. 1002.31, Florida Statutes)
We name the schools only as the locator returned them. We do not print grades or ratings, because they change and do not belong in a purchase decision made from a page. The district itself calls the locator "only a guide" and asks you to call the school indicated. Grove City addresses use ZIP 34224, so the locator's note for 34223 addresses, which returns only a middle and a high school, does not apply here.
We ran 24 Grove City addresses through the district's locator on November 14, 2026, on streets across the community, and every one returned the same three schools. That is a pattern for the area, not a promise for any single home.
The addresses sat on the state-named avenues, the numbered streets, Oyster Creek Drive, Waterside Drive, Holly Avenue, Smith Street, Placida Road, San Casa Drive, Griggs Road and Park Pointe Drive. Zoning follows the address, so a buyer comparing a Grove City Terrace home with a canal home should run both through the locator rather than assume they match.
Florida law lets a parent enroll a child in any school that has not reached capacity, and the district runs a controlled open enrollment process. Vineland Elementary showed enrollment of 508 against a programmatic capacity of 560 and a status of "CLOSED" on the 2026-27 chart, so do not count on a transfer there.
Section 1002.31 requires capacity determinations to be updated every 12 weeks, lets a district provide transportation but does not require it, and gives preference to certain groups such as children of active duty military personnel. The district's choice page says requests for 2027-28 are accepted in January with a random lottery in the first two weeks of February, and it also says parents may apply during any month for 2026-27; it does not reconcile the two, so call the district office. The page states that transportation to a reassigned school is the parent's responsibility. L. A. Ainger Middle showed 578 enrolled of 968 and Lemon Bay High 1,277 of 1,285, with no status listed for either.
Charlotte County Public Schools says students who live within two miles of their assigned school are not provided district bus transportation, and the district measures each address. Lemon Bay High is about 1.8 road miles from a central Grove City point, so many Grove City addresses fall inside the two-mile line for the high school.
Read the district's transportation page and confirm the rule for the specific address before you count on a bus stop in your plan. The same measurement applies to the elementary and middle school, and those distances run longer from some Grove City streets than from others. If transportation shapes your search, add the school route to your list of drives before you write an offer.
Grove City is unincorporated Charlotte County with no homeowners association found over its four plats, a county street and drainage assessment of $220 per unit, water and sewer from the Englewood Water District, and 1950s to 1970s block homes, canal homes, mobile homes and lots. Nearby places differ on association, government and home stock.
Data updated: November 2026 (Grove City assessments from the Charlotte County Grove City FY26 adopted budget and the Englewood Area Fire Control District; Census values from the American Community Survey 2020 to 2024 5-year estimates on Census Reporter, except North Port, which shows the 1-year vintage; drive figures from the OSRM routing service, November 17, 2026)
The table compares governments, charges, utilities and housing, not people. Where our research holds no documented figure for a place, the cell says so rather than guessing. Census medians are owner estimates with wide margins of error, not sale prices, so use them to see how housing mixes differ and use the county sales cuts in our budget section for what Grove City homes actually sell for.
| Place | County and government | Assessments and association | Water and sewer | Home stock | Census median value (ACS 2020 to 2024) |
|---|---|---|---|---|---|
| Grove City | Charlotte County, unincorporated | No HOA found; street and drainage unit $220 per ERU in FY26; fire district assessment | Englewood Water District, some parcels on septic | 1950s to 1970s block homes, canal homes, mobile homes, lots; Census median year built 1977 | $257,400 |
| Englewood East | Charlotte County, unincorporated | County street and drainage unit; no master association found | District, county utilities or well and septic, by address | Median year built 1991 on the county roll, with new builds and many lots | No separate figure in our research |
| Rotonda West | Charlotte County, unincorporated | Rotonda West Association, a membership corporation, plus a county street and drainage unit | Charlotte County Utilities per the county's facility page; confirm by address | Homes inside the Rotonda CDP; 8,120 housing units | $389,400 (Rotonda CDP) |
| Gulf Cove | Charlotte County, unincorporated | County Gulf Cove waterway unit appears in the county budget files | Not documented in our research | Not documented in our research | No separate figure in our research |
| Manasota Key | Barrier island split between Sarasota and Charlotte counties | County units on the Charlotte side | Englewood Water District | Charlotte side mostly condominiums; Sarasota side single-family | $690,300 (Manasota Key CDP, very wide margin) |
| Englewood proper | Sarasota County, unincorporated; the Englewood CDP spans the county line | Depends on the county side | Englewood Water District serves southern Sarasota County | Englewood CDP: 14,591 housing units | $339,900 (Englewood CDP) |
| North Port | City of North Port, Sarasota County | City Road and Drainage District assessment on the tax bill | City utilities | City of 43,919 housing units | $387,100 (1-year vintage) |
Sources for the rows: Grove City's median value and year built from Census Reporter; Rotonda from its Census Reporter profile and the Rotonda West Association; Englewood from its profile; Manasota Key from its profile; North Port from its profile and the city's road and drainage page; the Englewood Water District from its site.
Grove City has no association assessment on top of the county, and its street and drainage unit is $220 per unit, while Rotonda West adds a Chapter 720 membership corporation on top of a county unit a county budget file lists at $445 per unit, a figure to confirm with the county. That difference changes a monthly budget.
The Rotonda West Association describes itself as a non-profit Florida membership corporation that collects assessments, fines, deposits and service fees. The county's Rotonda West street and drainage budget file lists $445.00 per ERU for FY26, and you should confirm the current figure with Charlotte County's MSBU office. A Grove City home pays the county unit and the Englewood fire assessment of $290.78 for a home in 2026-27, with no association layer found over the four plats. Recorded plat restrictions, if any survive for a parcel, show up on the title commitment, so we read it.
North Port bills a city Road and Drainage District assessment on the property tax bill, split into a per-parcel administrative charge, road charges per road unit and drainage charges per drainage unit, while Grove City bills one county street and drainage unit of $220. A direct comparison needs each parcel's own units.
For fiscal year 2025 to 2026 the city lists $8.07 per parcel administrative, $18.83 base road and $73.42 enhanced road per road unit, and drainage of $47.87, $36.69 or $106.21 per drainage unit depending on the class, payable as part of the tax bill, on the city's assessment page. North Port is a city in Sarasota County, so its taxes and rules differ from unincorporated Charlotte County in ways beyond this one line.
Grove City is the Charlotte County community on Placida Road, Englewood proper straddles the Sarasota and Charlotte county line, and Manasota Key is the barrier island across Lemon Bay. The Census median value for Grove City is $257,400, against $339,900 for the Englewood CDP and $690,300 for the Manasota Key CDP.
Those medians come from the American Community Survey 2020 to 2024 and carry margins of error, which for Grove City is plus or minus $37,731 and for Manasota Key plus or minus $241,152. The gap reflects housing mix: the Grove City profile carries about 30 percent mobile homes and a median year built of 1977. Which county a home sits in sets its taxes, its permitting office and its property appraiser, so confirm the county on the parcel record rather than the mailing address, because Englewood addresses reach into both counties. Our Englewood buyer's guide and Manasota Key buyer's guide cover those two markets.
Grove City fits a search for an older block home on an inland street, a canal home with its own dock, a mobile home on land you own or a lot to build on, all without an association. Another place fits better when the search needs a newer home, an association's amenities or an island setting.
Choose Grove City when the home itself is what you want: a 1950s to 1970s block home, a dug canal with Lemon Bay access, an owned mobile home lot or a teardown. Look at Englewood East when you want a newer resale or a new build on a platted grid, at Rotonda West when a membership association is part of what you want, at Gulf Cove when you want to compare another Charlotte County community's county units and at Manasota Key for island and Gulf frontage. For a first call, book your Grove City buyer consultation and call Marc at (239) 287-5873.
Since August 17, 2024, a Grove City buyer signs a written agreement before an agent tours a home, whether in person or on a live video tour. The fee in it is negotiable and set by no law, the MLS no longer shows offers of compensation, and a seller may still agree to pay toward it.
Before we show you a Grove City block home, canal home, mobile home or lot, you sign a written buyer agreement that states our compensation as a defined amount, not an open-ended figure or a range. NAR's guide says that amount "is negotiable and not set by law."
NAR's consumer guide to written buyer agreements says visiting an open house or asking about services does not require one, and that the compensation must be "clearly defined." The Florida Realtors settlement FAQ lists the forms in use, including a pre-touring agreement, a showing agreement and a longer buyer brokerage agreement, and says all contracts are negotiable. The agreement is also where we write down our work on a Grove City purchase: pulling the county record for the parcel, checking the flood and evacuation zones, reading the title commitment, and confirming sewer or septic status. Read it before you sign and ask about any line.
Yes. NAR says sellers may still offer compensation off the MLS, and sellers may offer buyer concessions on the MLS, so on a Grove City offer a payment toward our fee is a term we can ask for in writing. It is a request, not a right, and a seller can decline it.
NAR's settlement explainer states that offers of compensation "are no longer allowed on Multiple Listing Service (MLS) platforms" while agent compensation "continues to be fully negotiable." Loan programs cap what a seller may contribute, and the VA, for one, caps seller concessions at 4 percent, as its funding fee and closing costs page states. On a Grove City mobile home or lot, where prices are lower, a flat fee often reads as a larger share of the price than on a canal home, which is one reason to settle the number before touring.
No. The Florida Realtors settlement FAQ says neither Fannie Mae nor Freddie Mac lets a buyer finance a commission into the mortgage, although both allow seller concessions toward it where that is customary. A Grove City buyer pays the fee at closing unless the seller agrees to cover it.
The same FAQ says "Compensation is fully negotiable and not set by law" and "Compensation will not be allowed anywhere in the MLS." The Justice Department has also commented on commissions: in a March 17, 2025 filing in Nosalek v. MLS Property Information Network it wrote that broker commission rates "have barely budged from the 5-6% 'standard' rates for decades." We read that as a reason to treat the number in your agreement as something to discuss, and we explain our fee in plain terms during the first call.
Our Grove City negotiating levers come from records and calendars: inspection findings by build era, seawall and dock condition, written insurance quotes inside the inspection period, wind mitigation credits, the elevation certificate, permit history and the 50 percent rule, sewer notice status, mobile home title status, and the appraisal.
Data updated: November 2026 (sales from the Charlotte County Property Appraiser roll of November 5, 2026, with qualified sales through September 9, 2026; insurance figures from Citizens' 2026 approved rates by county; contract terms from the Florida Realtors and Florida Bar AS IS form as summarized in our research)
We describe how we work here, not past deals. Every number below comes from a statute, a form, an insurer's filing, a federal guide or the county roll, and you can open each one.
Most Grove City homes are 1950s to 1970s block houses, and the findings that move a price follow that age: roof age, the four insurance systems, panel and wiring types, and plumbing. Under the AS IS form, those findings can support a price change, a credit or a cancellation inside the inspection period.
In the 36 months to September 9, 2026, we tracked 62 improved sales, mobile homes included, of homes built before 1980 at a median of $283,550, with a middle half of $230,000 to $486,250, and 19 sales of homes built from 1980 to 1999 at $335,000, from the county roll. Citizens requires a four-point inspection on homes and mobile homes more than 20 years old, which covers nearly every Grove City home. The AS IS form gives a 15-day inspection period when the blank is left empty, with a right to cancel in the buyer's sole discretion. The federal CPSC's aluminum wiring publication says aluminum branch wiring was installed from 1965 to the mid 1970s, the exact years many Grove City homes were built, so we ask the inspector to name the wiring type.
On a Grove City Shores or Cove home, an aging seawall or a dock built without a permit is the largest repair item an inspection can find, and it belongs in the offer as a price change, a credit or a repair before closing. We ask for a contractor's written quote, not a guess.
Canal plat homes sold at a median of $792,000 on 15 sales over 36 months, so a seawall problem is a real share of the price. State law exempts seawall restoration "within 18 inches waterward of" the prior location from a state permit under s. 403.813, and the same statute exempts private docks of 1,000 square feet or less over water in artificially created waterways, while the exemption on Lemon Bay itself, an Outstanding Florida Water, is 500 square feet. Charlotte County runs its own seawall and dock permits on top, so we ask the county's permitting office for the permit history and confirm whether the dock and any lift were permitted before we negotiate.
We get written wind and homeowners quotes on a Grove City home before the inspection period ends, so a premium that breaks your budget becomes a reason to renegotiate or cancel instead of a surprise at closing. Citizens is a fallback, and a private offer may keep you out of it.
Citizens' 2026 approved Charlotte County averages are $2,887 for a homeowners HO3 policy, $2,810 for a mobile home policy and $4,799 for wind-only HW2, from its rate filing; those are county averages, not quotes. Citizens eligibility depends on private offers under s. 627.351, and from January 1, 2027 every Citizens policy with wind must also carry flood under its flood requirement. Because most Grove City addresses sit in a flood zone that already triggers the requirement, we price flood alongside wind.
A wind mitigation report can lower the windstorm part of a premium, and homes built to the 2001 Florida Building Code or later qualify for at least a 68 percent windstorm discount. With a Census median year built of 1977 for Grove City, most credits here depend on documented roof, opening and connection features.
The report uses form OIR-B1-1802, valid for up to five years, and the state's July 2026 premium discount guide says the new form is required for inspections on or after April 1, 2026. A home with a recent wind mitigation report and a roof with years of life left can be priced into the offer, and a home without one gives you a reason to order it inside the inspection period. We compare the credit against the quote, not against the seller's recollection.
The flood disclosure under F.S. 689.302 covers only the current seller's ownership, and the elevation certificate shows the building's elevation against the base flood elevation. Together they tell us what a flood policy will cost and whether a seller's silence on earlier owners should concern you.
The seller must deliver the form at or before the contract, answering whether the property flooded during their ownership, whether they filed a flood claim and whether they received federal flood assistance. A completed elevation certificate does not expire, as FEMA's certificate page explains, and FEMA's Risk Rating 2.0 page says a policyholder can assign a flood policy to a new owner and that most rates do not increase more than 18 percent a year. The county's Forerunner portal holds flood zone, base flood elevation and downloadable certificates.
If repairs or improvements to a Grove City building in a flood zone cost more than 50 percent of the building's value, land excluded, the county requires the building to meet current code, including elevation. The rule follows the building, not the owner, so a buyer inherits the exposure.
Florida now bars local governments from applying cumulative look-back periods under s. 163.31795, but the county's own page on its 50 percent rule is the authority for how it counts permits and values, so ask the county about the specific address; the county lists [email protected] and 941.743.1200. On a home with open storm permits or visible damage, we ask for the permit history, a repair estimate and the building value before we write a price.
Some Grove City parcels are still on septic, and the Englewood Water District requires a connection within 365 days after written notice that service is available. A written notice in the seller's file means the connection cost is about to become yours, so the notice status belongs in the price discussion.
The District's customer rules state that on connection the owner must abandon the septic system and the District inspects the abandonment, and our research read that the connecting owner pays the lateral, the abandonment and any grinder pump. Section 381.00655 sets the same 365-day period in state law. We ask the seller whether a notice has been issued and ask the District for the parcel's service status through its availability form.
A Grove City mobile home is real property only when its owner also owns the land and the home is permanently affixed, and a retired title with an RP decal is the sign of it. A home still titled as a vehicle changes the loan options, the tax treatment and the closing steps.
The county roll counted 136 mobile homes in Grove City, and our research found 27 from the 1950s or 1960s and 41 from the 1970s. Fannie Mae requires a manufactured home to meet the federal standards established June 15, 1976 and to be real property on a permanent foundation, per its eligibility rules, so an older home leans toward cash or a portfolio lender. The state's title retirement form TL-39 cites F.S. 319.261, and we ask the seller for the title and the decal status in the first week of the contract.
We read what the county roll says each Grove City home is: heated area, year built and plat. Single-family sales in the 12 months to September 9, 2026 ran a median of $262 per heated square foot on 33 sales, which gives us a figure to hold an asking price against.
Over 36 months, inland plats ran $250 per heated square foot on 58 sales, with a middle half of $206 to $285, and canal plats ran $486 on 15 sales, with a middle half of $411 to $621. Those figures use the county's heated living area, never a listing sheet's square footage, and a listing that claims more space than the county record is a question to ask before you tour. A lender's appraisal then has to support the price, and with only 33 single-family sales in a year, we bring the appraiser the nearest comparable sales by plat and home type.
If a sale funds your Grove City purchase, set the two dates together before you write an offer. The AS IS form defaults to a 30-day loan approval period and a 15-day inspection period, so your current home's closing has to fit those deadlines or the contract needs different blanks.
If the home you are selling is in Grove City, start with our guide to selling your Grove City home, then get a price from the Grove City home valuation. Call Jesse direct at (239) 898-6072 to put the sale and the purchase on one calendar.
The valuation reads the same county roll this page uses, so a seller on a canal and a buyer moving to an inland street work from one set of recorded sales. If your current home is elsewhere in Englewood, our Englewood buyer's guide links the selling pages for the other parts of town, and the Englewood overview gives the wider picture. Knowing what your sale should net tells you how much Grove City home it can buy at the 7.11 percent Freddie Mac 30-year average for the week of November 12, 2026.
Yes, within the statute's limits. Portability can carry up to $500,000 of your Save Our Homes benefit to a new Florida homestead, and you must own and live in the Grove City home on January 1 and file with the Property Appraiser by March 1 to claim the exemption that year.
The portability rule is in s. 193.155 and the March 1 filing date is in s. 196.011. A Grove City filing goes to the Charlotte County Property Appraiser, not Sarasota County's, even though the mailing address says Englewood. Carrying a benefit can make the first homestead bill much lower than the full-price tax estimates in our tax section, so we ask your current county for the figures before we compare monthly costs.
If the equity in your current home is the down payment and two mortgages are out of reach, sell first. If you can carry both, buying first widens your choices in a market with only 33 single-family sales in a year. A home-sale contingency is a term a seller can accept or refuse.
At the Freddie Mac 30-year average of 7.11 percent, principal and interest on a $240,000 loan, which is 80 percent of the $300,000 single-family median, is about $1,614 a month, before taxes, insurance, flood, the county assessments and any mortgage insurance. Jesse prices your current home while Marc runs the Grove City purchase. Reach Jesse direct at (239) 898-6072, or start with the Grove City home valuation.
Current Grove City listings come from the MLS and change daily, so we do not print a list that would be stale in a week. To see what is for sale now, browse current Englewood listings on DomainRealtyGroup.com and send us the Grove City ones you like.
Data updated: November 2026 (MLS-only Grove City fields checked November 17, 2026; county figures from the Florida Realtors Punta Gorda MSA report for October 2026; statewide supply from the Florida Realtors October 2026 single-family summary; North Port-Sarasota-Bradenton supply from the Realtor Association of Sarasota and Manatee)
| Measure | Figure |
|---|---|
| Active listings in Grove City | Information not available at time of publishing (checked November 17, 2026). |
| Grove City days on market | Information not available at time of publishing (checked November 17, 2026). |
| Grove City sale-to-list ratio | Information not available at time of publishing (checked November 17, 2026). |
| Grove City months of supply | Information not available at time of publishing (checked November 17, 2026). |
| Charlotte County (Punta Gorda MSA) single-family closed sales, October 2026 | 404, median $345,000, up 0.9 percent year over year (county figure, not Grove City) |
| Charlotte County single-family median, January to October 2026 | $350,000 on 4,853 closed sales (county figure) |
| Florida single-family months of supply, October 2026 | 4.6 (statewide figure) |
| North Port-Sarasota-Bradenton single-family months of supply, October 2026 | 4.0 (Sarasota and Manatee figure, not Grove City) |
Florida Realtors does not publish a months-of-supply figure for the Punta Gorda area in a public file we could open, which is why the table shows the state and the neighboring Sarasota-Manatee region instead.
Check four things on the county record first: the plat, the heated area, the year built and whether the property is a house, a mobile home or a lot. Then check the flood zone, the evacuation zone and whether the home is on sewer or septic, because each changes the inspections and the insurance.
Search the address on the Charlotte County Property Appraiser site, because the county record, not the listing, settles the plat, heated area and year built. For the flood zone and any certificate on file, use the county's Forerunner portal. A listing that shows more square footage than the county's heated area is a question to ask before you tour, and a mobile home listing should say whether the land is included and whether the home is real property.
"No HOA" on a Grove City listing matches our research, which found no association over the four plats. It does not mean no rules: the county street and drainage unit, county zoning and any recorded restrictions that survive still bind, and the title commitment shows what survives.
Florida's Marketable Record Title Act can extinguish restrictions older than 30 years unless a deed in the chain preserves them, including by plat reference under s. 712.03, so the answer is decided parcel by parcel. Section 720.401 applies only where membership is mandatory, and we found none for Grove City. We read every exception on the commitment with you.
Build a Grove City alert on the filters that separate one home from another here: home type, plat or canal frontage, price band, build era, flood zone and sewer type. Then send us the matches and we read each one against the county record and the rules that apply. Start on our buying page.
Start with home type and price band, because they move together here. In the 12 months to September 9, 2026, all improved sales under $200,000 numbered 5, at a median of 960 heated square feet and a median year built of 1990, while the $300,000 to $399,999 band had 7 sales and a median of 1,500 heated square feet.
Those are small groups drawn from all improved uses, including mobile homes, on the county roll, so treat them as a sketch and not a rule. Add a canal filter next, since canal plat sales ran a $792,000 median over 36 months against $282,500 inland, and a flood filter, since lender flood rules follow the zone. A buyer who wants a newer home should know the county roll shows only 9 single-family homes built in 2020 or later, so that filter returns very little.
When a Grove City listing matches your alert, we confirm the showing with the listing agent and pull the parcel record, flood zone, evacuation zone, any posted elevation certificate and the permit history before you arrive. On a lot or a teardown we also check utility availability.
Water and sewer availability starts with the Englewood Water District, whose site links a service availability form. Build the alert from our buying page, or give us the filters during the consultation below. Marc Comisar reads the Grove City matches himself; call Marc at (239) 287-5873.
A Grove City buyer consultation is a no-cost working session with Jesse McGreevy or Marc Comisar on your budget, whether an inland home, a canal home, a mobile home or a lot fits it, which plat, and the flood, insurance, utility and title checks on this page. It ends with a written search plan and the buyer agreement explained.
We bring the county record: 39 qualified improved Grove City sales in the 12 months to September 9, 2026 at a median of $289,000, 33 single-family sales at $300,000, and over 36 months 15 canal plat sales at $792,000 against 58 inland sales at $282,500, from the Charlotte County Property Appraiser roll.
We also bring the payment math at today's rate. At the Freddie Mac 30-year average of 7.11 percent for the week of November 12, 2026, principal and interest on the $289,000 all-improved median with 20 percent down is $1,555 a month. A fuller build for a $300,000 inland home, with 20 percent down, the 2026 millage, a Charlotte County Citizens HO3 average and the flat assessments, comes to about $2,317 a month before flood, and that estimate assumes the assessed value equals the price, so it likely runs high. We also bring the document list we pull on any Grove City home you like.
Expect questions on price range, cash for the down payment, your lender, which of the four purchases you are weighing, the plats you prefer, a boat or dock, your flood and insurance budget, your move date, any home you must sell first and homestead plans. Your answers decide where in the four plats we start.
Book your Grove City buyer consultation or start on our buying page. Call Marc at (239) 287-5873 or call Jesse McGreevy direct at (239) 898-6072. If you also own a home to sell, begin with the Grove City home valuation. Our office is at 24031 S Tamiami Trl #101, Bonita Springs, FL 34134, and you can also reach us through our contact page. You are working with Top 1% Real Estate Agents Nationally Since 2008 and the #1 Team in Southwest Florida since 2012, and there is no obligation.
Jesse McGreevy and Marc Comisar are top-reviewed Southwest Florida buyer's agents, recognized with the Gulfshore Life 5 Star Award for customer satisfaction for 21 straight years. The reviews below are quoted exactly as clients wrote them on our Google Business Profile. We do not edit, combine or summarize client words.
★★★★★ "Jesse is the best Realtor I have used. He found us our dream home even though it took months as we were not the easiest to please."
★★★★★ "Highly recommend Marc as a realtor. His devotion to finding you the perfect house is obvious and a breath of fresh air at such a stressful time."
★★★★★ "Marc is extremely knowledgeable, professional and a true pleasure to work with. He kept us informed throughout the process and went over and beyond our expectations to ensure an extremely smooth process."
★★★★★ "Marc's knowledge of the Southwest Florida real estate market is unmatched. He took the time to understand exactly what I was looking for in a home and quickly identified properties that checked all my boxes."
★★★★★ "Marc was great! He helped us find a place that matched our needs, without trying to upsell us into something too big. And he's helped us settle into the area. 100% recommendation!"
★★★★★ "Marc is one of the most down to earth realtors that really listens to your needs and is exceptional at finding the right house."
Before you buy in Grove City, request the survey, flood zone and any elevation certificate, permit history, open permit and lien search, the seller's flood disclosure, written insurance quotes, wind mitigation and 4-point reports, a termite report, septic or sewer status, the title commitment and the tax bill lines. Mobile homes and lots add their own papers.
The table below lists each paper we request on a Grove City purchase, who issues it and which of the four purchases it applies to. Use it as a working checklist during the inspection period, and send us whatever the seller or an agency has already given you.
| Document | Who issues it | Inland home | Canal home | Mobile home | Lot | What it settles in Grove City |
|---|---|---|---|---|---|---|
| Survey | A registered Florida surveyor, at the buyer's cost | Yes | Yes, with seawall and shoreline | Yes, with the home's position | Yes | Property lines on old plats; the AS IS form lets you order one at least 5 days before closing |
| Flood zone and elevation certificate | County Forerunner portal; a surveyor for a new certificate | Yes | Yes | Yes | For the build elevation | Lender rule and flood price; a completed certificate does not expire (FEMA) |
| Permit history | Charlotte County Community Development | Yes | Yes, with seawall, dock and lift permits | Yes, with set and repair permits | Yes | Roof, panel, plumbing, window and storm repair permits and their final dates |
| Open permits, code cases and liens | County code compliance research request; the Clerk for contractor liens | Yes | Yes | Yes | Yes | Our research found about 7 to 10 days for the county's research; confirm the turnaround with Code Compliance and order it early |
| Flood disclosure | The seller, at or before contract, under s. 689.302 | Yes | Yes | Yes | Not for vacant land | Three questions about flooding, claims and federal assistance during the seller's ownership |
| Written homeowners and flood quotes | Your insurance agent | Yes | Yes | Yes, mobile home form | Not applicable | Premium before the inspection period ends; flood is required on Citizens wind policies from January 1, 2027 |
| Wind mitigation report, form OIR-B1-1802 | A qualified inspector | Yes | Yes | Yes | Not applicable | Credits for roof, openings and connections; valid up to five years |
| 4-point inspection | A Florida licensed inspector | Yes | Yes | Yes | Not applicable | Citizens requires it on homes and mobile homes more than 20 years old |
| Termite (WDO) report | A licensed pest control business, on FDACS form 13645 | Yes | Yes | If the home has wood framing | Not applicable | A visual report that "does not constitute a guarantee" |
| Seawall and dock report | A marine contractor or engineer; the county permit file | Not applicable | Yes | Not applicable | Canal lots | Wall condition, dock footprint and permit status before the offer is final |
| Septic report or sewer notice status | A septic contractor; the seller for any District letter; DOH-Charlotte for permit records | Yes | Yes | Yes | Yes | Whether a 365-day connection clock is running |
| Well test | A state certified lab | Only if a drinking water well serves the home | Same | Same | Not applicable | Most Grove City homes use District water, so this applies only to wells |
| Title commitment with plat restrictions | A Florida title insurer, through the closing agent | Yes | Yes | Yes | Yes | Surviving plat restrictions, easements and liens; the AS IS form asks for it 15 days before closing, 5 for cash |
| Mobile home title or RP decal status | The seller; the county tax collector | Not applicable | Not applicable | Yes | Not applicable | Real property or vehicle; the TL-39 retirement path |
| HUD label, data plate and tie-down check | An inspector who knows manufactured homes | Not applicable | Not applicable | Yes | Not applicable | The June 15, 1976 line, wind zone and anchoring |
| Tax bill with the MSBU line | The Charlotte County Tax Collector and the seller | Yes | Yes | Yes | Yes | The $220 street and drainage unit, the fire assessment and other flat charges |
| Property tax estimate and disclosure summary | The seller under s. 689.261; our estimate | Yes | Yes | Yes | Yes | The bill resets to just value the January 1 after you buy |
| Englewood Water District account and capacity status | Englewood Water District | Yes | Yes | Yes | Yes | Whether capacity charges were paid and base charges kept current |
| Utility availability letter | The District's service availability form | If on septic | If on septic | If on septic | Yes | Water and sewer reach before you pay for a build |
| Lead-based paint disclosure | The seller, with the EPA pamphlet | Built before 1978 | Built before 1978 | Built before 1978 | Not applicable | A 10-day evaluation opportunity that a buyer may waive |
Send us the Grove City address and we pull the parcel record, flood zone, evacuation zone, any posted elevation certificate and the permit trail. For papers only the seller, a utility, an insurer or an inspector can produce, we tell you whom to ask and what to look for.
The Englewood Water District office answers at 941-474-3217, per its home page. For septic permit records, DOH-Charlotte can be reached at 941-624-7200 or [email protected]. Set up a Grove City consultation or call Marc at (239) 287-5873.
Below are the Grove City questions buyers ask most, each with a short, sourced answer. Sales figures use the Charlotte County Property Appraiser roll of November 5, 2026, with sales through September 9, 2026; payment figures use the Freddie Mac 30-year average of 7.11 percent for the week of November 12, 2026.
Grove City is in Charlotte County. The Census lists it as the Grove City Census Designated Place, geographic code 1227775, with 2,106 residents and 1,882 housing units in the 2020 to 2024 estimates, and the county runs a street and drainage unit for its streets. Englewood is only the mailing city. The Census Reporter profile shows the place's figures, and the Charlotte County Property Appraiser holds the parcel records.
Several places share the name. This page covers the Census Designated Place on Placida Road in western Charlotte County, Florida, ZIP 34224, with 955 parcels on the November 5, 2026 county roll: 591 single-family homes, 136 mobile homes and 136 vacant residential lots. Search "Grove City Florida" or "Grove City Englewood" to avoid the others. The county appraiser is the right place to confirm that a parcel is in Charlotte County.
No. Grove City is unincorporated Charlotte County, with no city government of its own, so county zoning, county permitting and county taxes apply. The county bills a Grove City Street and Drainage unit of $220 per unit for FY2026 and the Englewood Area Fire Control District bills $290.78 for a home in 2026-27. See the county's Grove City budget file and the fire district's assessment page.
Almost none. The county roll shows 9 single-family homes built in 2020 or later, and we tracked no new-home first sales in the 12 months to September 9, 2026 and 1 in 36 months. New construction here usually means buying a lot or a teardown and building, which the lot and rebuild section of this page covers. Those counts come from the Charlotte County roll and are too small to support a new-home price.
In the 12 months to September 9, 2026, we tracked 33 single-family sales at a median of $300,000 and a median of 1,278 heated square feet. Over 36 months, canal plats sold at a median of $792,000 on 15 sales and inland plats at $282,500 on 58, so the plat matters more than the town. Square-foot figures use the county's heated area. The data come from the Charlotte County Property Appraiser.
In the 12 months to September 9, 2026, 9 improved sales landed from $200,000 to $249,999 and 6 from $250,000 to $299,999, a small group counted across all improved uses including mobile homes. The first band had a median of 962 heated square feet and year built 1971, the second 1,120 and 1972. These are small groups, so read them as a sketch, from the county roll.
Over 36 months, the 15 canal plat single-family sales had a median of $792,000 and a middle half of $550,000 to $1,300,000, at a median $486 per heated square foot. Inland plats had a middle half of $232,250 to $352,500, so canal frontage starts well above the inland range. Figures are from the county roll; Shores and Cove sales are combined because Cove alone is a small group.
Yes, on the county's small samples: 4 mobile home sales in the 12 months to September 9, 2026 had a median of $151,000, and 9 in 36 months had a median of $150,000, against $300,000 for single-family homes in the same 12 months. Those are small groups, so use them as a sketch. The land under the home, its flood zone and its title status affect value as much as the unit. Data are from the Charlotte County roll.
No lot rent applies to the mobile homes on owned Grove City lots. Chapter 723, Florida's mobile home park law, covers only rented lots in parks, so a Grove City buyer who owns the land under the home pays property tax and county assessments instead. The statute's scope is in s. 723.002. The county roll counts 136 mobile homes in Grove City.
Not a Fannie Mae loan. Fannie Mae requires the home to meet the federal standards established June 15, 1976, carry a HUD data plate or label, be at least 12 feet wide and 400 square feet, and sit on a permanent foundation as real property. Older homes lean toward cash or a portfolio lender. Read the Fannie Mae rule, and note that second homes qualify only if multi-width under its manufactured housing rule.
Citizens requires a 4-point inspection for mobile home applications on properties more than 20 years old, and its 2026 Charlotte County average for mobile home policies is $2,810. Those policies exclude rising water, so flood comes through a private carrier or the National Flood Insurance Program. Read Citizens' inspection rules and its 2026 rates by county.
Use Charlotte County's Forerunner portal, which gives the flood zone, the base flood elevation and downloadable elevation certificates, and a state database of certificates has existed since January 1, 2023. Our community guide's tests put about 59 percent of Grove City address points in Zone AE. The Englewood Review's report describes the portal, and the state elevation certificate page explains the database.
If the mortgage is federally backed and the home sits in a Special Flood Hazard Area such as Zone AE, yes. Citizens also requires flood on any wind policy in such an area, and from January 1, 2027 on all of its policies regardless of value, with the flood limit at the dwelling amount or the $250,000 federal maximum. The Citizens flood requirement states the schedule.
Yes, in many cases. FEMA says policyholders can transfer their discount to a new owner by assigning their flood insurance policy, and statutory limits mean most rates do not increase more than 18 percent a year. Ask the seller's agent for the policy declarations early. See FEMA's Risk Rating 2.0 page.
No. A completed elevation certificate does not expire and survives a sale, though a new one may be needed if the building changes. Only a letter of map amendment or revision can remove the lender's flood requirement. An old certificate may use an older vertical datum, so check which one it uses. FEMA explains this on its elevation certificate page.
Citizens' 2026 approved Charlotte County averages are $2,887 for a homeowners HO3 policy, down 5.9 percent, $2,810 for a mobile home policy, $2,083 for a dwelling fire policy and $4,799 for wind-only HW2. These are county averages, not quotes for a Grove City address. Source: Citizens' 2026 rates by county.
When the National Weather Service issues a tropical storm or hurricane watch or warning for any part of Florida, Citizens agents may not bind new coverage or increases, whatever the effective date. A Grove City closing between June 1 and November 30 needs the policy bound before any watch appears. Citizens' suspension notice shows the wording. The 2026 season ends November 30.
Yes, it follows the building. If repair or improvement costs exceed 50 percent of the building's value, land excluded, the county requires current code including elevation, and the state's s. 161.54 defines substantial improvement. Ask the county about the specific address. The county lists [email protected] and 941.743.1200 on its rule page.
The Florida Building Code requires new, substantially improved and substantially damaged buildings to sit at the base flood elevation plus 1 foot. Grove City's base flood elevations run 8 to 10 feet in the NAVD88 datum on the county's current map, effective December 15, 2022. The elevation rule is in the state's flood amendment guidance, and the county's map is on its flood layer.
The Englewood Water District, built in 1959 to serve "Englewood, Grove City, and Manasota Key," covers about 44.5 square miles of southern Sarasota and western Charlotte counties. As of January 2019, 87 percent of its water customers also received sewer service, so some parcels remain on septic. See the District's home page and the Water and Wastes Digest article.
Yes, within 365 days after written notice that service is available, under the District's rules and F.S. 381.00655, and before a certificate of occupancy if a modification makes the septic insufficient. On connection the septic system must be abandoned under District inspection. The District's rules state this, and s. 381.00655 mirrors it.
The District reads the meter at the sale as the seller's final read and your first read, and your first bill carries a $50.00 new service application fee. The monthly base facility charge in our research was $29.37 for water and $42.75 for sewer. Source: the District's customer rules, effective October 1, 2026.
It can. The District's rules say all fees and charges "run with the parcel," and its hurricane FAQ says a notice of lien is filed after 120 days of non-payment. Ask the seller for a final read and a paid account before closing. See the District's rules and hurricane FAQ.
For a first connection, our research priced capacity charges, related charges and a short-tap meter at $17,865.50 per equivalent residential connection under the District's rules effective October 1, 2026, before the plumber's lateral. Paid capacity stays with the land while base charges continue. Read the District's rules, and ask the District to confirm the parcel's status.
Florida Realtors reports enhanced nutrient-reducing septic systems at about $15,000 to $35,000 or more where required, and advises buyers to confirm sewer availability. Whether a Grove City parcel needs one depends on the address, the septic permit record and the District's sewer status. See the Florida Realtors article.
Beyond the millage, our research on county bills found sanitation of $335.51, the $220.00 street and drainage unit, the $290.78 fire assessment and a stormwater charge of $17.53 to $35.05, which puts the flat total at about $864 to $881 a year. Confirm the lines on the parcel's own bill. Fire figures are on the district's page; the unit is in the county budget file.
The 2026 certified millage for the Grove City taxing district is 15.5683 mills, covering county, law enforcement, school, water management and other levies, while the water district and fire district levy no mills. At full price with no cap, that is $4,670.49 on a $300,000 non-homestead home. The rate is on the county's 2026 rate proof. That estimate assumes assessed value equals price, so it likely runs high.
You must own the home and live in it as your permanent residence on January 1, then file with the Property Appraiser by March 1, under F.S. 196.011. A home you buy in 2026 does not qualify for 2026 unless you were in it on January 1. The statute is s. 196.011, and filing is at the Property Appraiser.
Florida voters approved Amendment 3 on November 3, 2026, by about 62 percent on unofficial results, which in 2027 and 2028 sets non-school homestead exemptions of $150,000 and $250,000 and adds a 5 percent non-homestead cap. As of November 17, 2026 we had not seen certification, and school taxes and flat fees are unchanged. See the Charlotte County Property Appraiser's amendment page and Florida Realtors' report.
Usually. The Save Our Homes cap resets on a change of ownership, and the home is reassessed at just value as of the January 1 after the sale. Seller-side tax bills can badly understate what your first bill will be, so we estimate from the price. The rule is in s. 193.155, and the seller must give a tax summary under s. 689.261.
On a $300,000 price with 20 percent down, our cost research puts the buyer's government and title lines at $1,516.50 when the seller pays the owner's policy, and the owner's policy itself is $1,575 under the state's rate rule. Who pays it follows the contract and local custom. Sources: the Department of Revenue's stamp page and Rule 69O-186.003.
The deed rate is 70 cents on each $100 of consideration, and mortgage stamps are 35 cents per $100 of the loan, but the law says all parties to the document are liable regardless of who agrees to pay. The contract's checkbox controls, and the closing agent confirms. See the Department of Revenue. The Clerk's recording fee is $10 for the first page and $8.50 for each added page, per the Clerk's FAQ.
At 7.11 percent, principal and interest on the $289,000 all-improved median with 20 percent down is $1,555 a month, or $1,876 with 3.5 percent down, and about $1,614 on a $240,000 loan, which is 80 percent of the $300,000 single-family median. Taxes, insurance and flood are extra. Borrowing costs about $673 a month per $100,000 at that rate, from Freddie Mac's survey.
Our cost research built $2,317 a month for a $300,000 inland home and $4,655 for a $650,000 canal home, each a 30-year fixed at 7.11 percent with 20 percent down and taxes at the 2026 millage on a value equal to the price, before flood and utilities. They likely run high. Inputs are the 2026 rate proof and Citizens' county averages.
Florida Housing lists FL Assist up to $10,000 as a 0 percent deferred second that is not forgivable, a 3 percent $12,500 second, and 3 to 5 percent forgivable seconds, with a 640 minimum credit score and homebuyer education. Hometown Heroes offers 5 percent of the loan, $10,000 to $35,000, and its 2025-26 money ran out in six months, so check status first. See Florida Housing's program page.
We tested three Grove City addresses, one inland, one canal and one on the original plat, on November 17, 2026, and all three came back ineligible on USDA's lookup. That does not settle every Grove City address, so run the exact address. Use USDA's address lookup for each home.
The 2026 conforming loan limit for one unit in Charlotte County is $832,750, per the FHFA county list. HUD's 2026 FHA floor is $541,287, with a 1.75 percent upfront premium and an annual premium of 0.55 percent at 3.5 percent down. We could not retrieve the Charlotte FHA row. See HUD's announcement and the FHFA county limits.
For first use the VA funding fee is 2.15 percent with no down payment, 1.5 percent with 5 percent down and 1.25 percent with 10 percent down, and exemptions apply to some veterans. The VA caps seller concessions at 4 percent. See the VA funding fee page for the current table.
Federal law then requires the buyer, as withholding agent, to withhold 15 percent of the amount realized unless an exception applies. One exception covers a buyer's residence at $300,000 or less, and a reduced 10 percent rate applies up to $1,000,000. Forms 8288 and 8288-A apply. See 26 U.S.C. 1445 and the IRS exceptions page.
As of November 17, 2026, FinCEN's residential real estate reporting rule had been vacated by a federal court on March 19, 2026, and an appeal was pending in the Fifth Circuit. Rules in this area change, so we confirm status with the closing agent before every cash closing. Status is on FinCEN's real estate page.
Call the title company at a number you already know before sending any wire, and never act on emailed changes to wiring instructions. NAR reported real estate fraud losses over $275 million from 12,368 victims in 2025, citing the FBI. Read the NAR report.
Lenders must give you the Closing Disclosure three business days before your scheduled closing, per the Consumer Financial Protection Bureau. Compare it line by line with your Loan Estimate and ask us about any line that changed. See the CFPB's closing disclosure guide.
In artificially created waterways, private docks of 1,000 square feet or less of over-water surface are exempt from the state permit if they do not impede navigation or affect flood control, while on Lemon Bay itself, an Outstanding Florida Water, the exemption is 500 square feet. The county permits docks separately. The rule is s. 403.813.
State law exempts seawall restoration within 18 inches waterward of the previous location from a state permit, but the county still requires its own seawall permit, which in our research calls for signed and sealed engineering. Confirm both with the county before pricing the repair. The state rule is in s. 403.813.
We found no public depth survey for the Grove City canals or Oyster Creek, so check depth at low tide with your boat's draft. The Lemon Bay Aquatic Preserve notes that water depth can be limited outside marked channels, and its seagrass rules carry fines up to $1,000. See the preserve's page, which gives 7,227 acres and a 1986 designation.
Charlotte County is not delegated to regulate mangrove trimming, so the state Department of Environmental Protection rules apply on Grove City shorelines, unlike in Sarasota County, which is delegated. Ask the state before trimming and before you accept a seller's promise that trimming was permitted. See the DEP delegation page.
Rule 62-330.411 treats Oyster Creek as a West Coast Inland Navigation District public channel, with a 30-foot top width and 20-foot bottom width and no overdredging. We found no Grove City canal dredging unit in the county budget files we read, so ask the county who maintains your canal. Read the rule.
As the county's project page read on November 14, 2026, bids opened October 21, 2026 came in over the construction budget and a budget adjustment was set for the Board of County Commissioners on November 24, 2026, with all park amenities closed during construction in 2027. Check the county page for the outcome. The ramp's current profile is on the state boating guide.
Under Johnson v. Davis (Fla. 1985), a seller who knows of facts that materially affect value and are not readily observable must disclose them, which is separate from the flood form. A buyer's inspection still matters, because the duty covers only what the seller knows. The decision is posted by the University of Vermont.
Yes, for homes built before 1978 the seller must disclose known lead-based paint, provide the EPA pamphlet, and allow a 10-day opportunity to evaluate, which a buyer may waive. Most Grove City homes and many mobile homes predate 1978. See the EPA disclosure page.
No. The Florida wood-destroying organism report on FDACS form 13645 is visual and states that it does not constitute a guarantee. Asian subterranean termites are expected across the state's 24 southernmost counties before 2040, with swarms from March to June. See the form and the University of Florida report.
Not for a same-use replacement: F.S. 163.31801 bars an impact fee on a replacement structure of the same use, and the Englewood Water District says paid capacity stays with the land while base charges continue to be paid. A vacant lot with lapsed capacity can owe charges. Read s. 163.31801 and the District's rules.
The Florida Building Commission's work plan lists December 31, 2026 as the effective date for the 9th edition, and law firm summaries note that the date an application is filed generally governs which code applies. A teardown buyer should ask the county about timing. See the Commission's work plan.
Punta Gorda Airport is about 29.7 road miles and 50 free-flow minutes from a central Grove City point, and it carried a record 2,282,002 passengers in 2025, up 18.5 percent. Sarasota Bradenton is about 44.4 miles and 67 minutes away. See the Business Observer report.
HCA Florida Englewood Hospital, a "100-bed acute care hospital" with "24/7 emergency care," is about 3.9 road miles and 8 free-flow minutes from a central Grove City point on Placida Road. Port Charlotte hospitals are about 18 miles east. Details are on the hospital's page.
On the district's 2026-27 chart, Vineland Elementary showed 508 students enrolled against a programmatic capacity of 560 and a status of "CLOSED" for choice transfers, and the district updates capacities on November 2, 2026, February 1, 2027 and May 3, 2027. Zoned attendance follows the address. See the district's choice page.
Freddie Mac's 30-year average ran from a low of 5.98 percent on February 26, 2026 to a high of 7.40 percent on October 8 and 15, and stood at 7.11 percent for the week of November 12, with the 15-year at 6.45 percent. Mobile home chattel loans price differently. See Freddie Mac and its rate history.
Florida Realtors reported a single-family median of $345,000 for October 2026, up 0.9 percent, on 404 closed sales in the Punta Gorda area, and $250,000 for townhouses and condos on 93 sales. Grove City's own single-family median was $300,000 over the 12 months to September 9, 2026. See the Florida Realtors report.
A Grove City specialist matters because one small community holds four different purchases, an inland block home, a canal home, a mobile home on an owned lot and a lot to build on, each run on different records, from seawalls and docks to titles, septic and flood elevation.
It means knowing which record answers which Grove City question. The county roll gives heated area and year built, the title commitment shows what survives of the plat restrictions, the flood layer and elevation certificate drive the flood price, and the Englewood Water District's letter decides whether a sewer bill is coming.
It also means reading the county record honestly. We keep inland plats, canal plats, mobile homes and lots in separate cuts, because blending them hides what each buyer actually pays: a $282,500 inland median and a $792,000 canal median over 36 months, a $150,000 mobile home median on 9 sales and a $47,500 lot median on 8 sales, both small groups, from the Charlotte County Property Appraiser roll. Our Grove City community guide covers the history and daily life we leave out here.
You reach Top 1% Real Estate Agents Nationally Since 2008 and the #1 Team in Southwest Florida since 2012, with the Grove City county record, the statutes and the flood and utility data in hand. Call Marc at (239) 287-5873, call Jesse direct at (239) 898-6072 or book a Grove City buyer consultation.
If you also own a home to sell, see Sell My Home in Grove City and the Grove City home valuation. If your search runs wider than Grove City, our Englewood buyer's guide covers the rest of the area, and our Englewood page gives the overview.
Every rule quoted on this page traces to a public document you can open at no cost. The list below holds the ones that matter most for a Grove City purchase, each linked straight to its publisher so you can check the statute, the form or the insurer's rule before you sign.
Every source below was read between November 14 and November 17, 2026, and each figure on this page carries its own date and window beside it in the text. Primary documents come first: Florida Statutes and rules, state and federal agencies (DBPR, OIR, DEP, DOH, FEMA and the NFIP, HUD, VA, USDA, FHFA, FinCEN, IRS, DHSMV, National Hurricane Center), Freddie Mac, Fannie Mae, Florida Housing Finance Corporation, Citizens Property Insurance, Charlotte County government and its Property Appraiser, Clerk, Tax Collector and school district, the Englewood Water District, Florida Realtors, and local news. Grove City sales figures come from the Charlotte County Property Appraiser's roll dated November 5, 2026, with sales through September 9, 2026. No listing site, brokerage or valuation aggregator was used for any figure on this page.
McGreevy and Comisar are the Southwest Florida buyer's agents Grove City buyers call when the details decide the deal. Jesse McGreevy and Marc Comisar lead Domain Realty Group, a full-service Southwest Florida real estate team, and guide buyers from the first tour to closing.
For this page we tracked 39 qualified improved Grove City sales in the 12 months to September 9, 2026 and 92 in the 36 months, along with 8 vacant lot sales in the 36 months, on the Charlotte County roll, with canal plats, inland plats and mobile homes kept apart, and we read the state, county and federal rules a buyer meets, so the figures here come from public records rather than estimates.
Jesse McGreevy direct: (239) 898-6072 · [email protected] · Marc Comisar direct: (239) 287-5873 · Office: 24031 S Tamiami Trl #101, Bonita Springs, FL 34134
McGreevy and Comisar, Brokered by Domain Realty. Jesse McGreevy (SL3101296) and Marc Comisar (BK3060671) are licensed Florida real estate professionals regulated by the Florida Real Estate Commission (FREC) under Chapter 475, Florida Statutes.
More on the team at about McGreevy and Comisar. Read our Grove City guide, plan a sale with Sell My Home in Grove City or the Grove City home valuation, and see our buying page.
McGreevy and Comisar lead Domain Realty Group, a full-service Southwest Florida real estate team. Learn more at DomainRealtyGroup.com.
Ready to buy? Call Marc at (239) 287-5873, or start with a Grove City buyer consultation. You are working with Top 1% Real Estate Agents Nationally Since 2008, and there is no obligation.
Updated November 2026. This page is general information about buying a home in Grove City, not legal, tax, insurance or financial advice. Recorded-sales figures change with every county file, assessments and utility charges change by resolution and statutory figures change annually. Brokered by Domain Realty.